specialdocumentation "rural development eslarn" issue 01.2016

4
Rural Development Eslarn The Eslarn wastwater projects. sanitizing the sewer system "schellenbachstrasse" There comes a time when every community once must think about the future. Also the market town Eslarn now after final judicial decision of the municipal council in May 2016 starts with a first part of the necessary renovation. Most of the sewage system of the village dates back directly from the time after the Second World War. Over the past decades only new residential areas and there new sewers were created. In May 2016 it was decided to place the order for the renovation to a regional construction company. Some days later they started to work. The beginning in June 2016: creation of a waste water tank The temporarily established place for construction and working materials. Another temporarily established place for pipes and duct components. The self-cast sewage tank / drain manifold. Already back sealed part of the excavation. (mid of Juni 2016) ISSUE 01.2016 | 03.07.2016 page 01 of 4

Upload: oikos-news-media

Post on 04-Aug-2016

220 views

Category:

Documents


0 download

DESCRIPTION

Special Documentation "Rural Development Eslarn", issue 1.2016 "Sanitizing the sewer system - Part. I".

TRANSCRIPT

Page 1: SpecialDocumentation "Rural Development Eslarn" issue 01.2016

Rural Development EslarnThe Eslarn wastwater projects.sanitizing the sewer system "schellenbachstrasse"

There comes a time when every community once mustthink about the future.Also the market town Eslarn now ­ after final judicialdecision of the municipal council in May 2016 ­ startswith a first part of the necessary renovation.Most of the sewage system of the village dates backdirectly from the time after the Second World War.Over the past decades only new residential areas andthere new sewers were created.In May 2016 it was decided to place the order for therenovation to a regional construction company.Some days later they started to work.

The beginning in June 2016:creation of a waste water tank

The temporarily established place forconstruction and working materials.

Another temporarily established placefor pipes and duct components.

The self-cast sewage tank / drainmanifold.

Already back sealed part of theexcavation. (mid of Juni 2016)

ISSUE 01.2016 | 03.07.2016

page 01 of 4

Page 2: SpecialDocumentation "Rural Development Eslarn" issue 01.2016

Rural Development EslarnThe Eslarn wastwater projects.sanitizing the sewer system "schellenbachstrasse"

There comes a time when every community once must think about the future.Also the market town Eslarn now ­ after final judicial decision of the municipal council in May 2016 ­starts with a first part of the necessary renovation.Most of the sewage system of the village dates back directly from the time after the Second WorldWar.Over the past decades only new residential areas and there new sewers were created.In May 2016 it was decided to place the order for the renovation to a regional construction company.Some days later they started to work.

The second part of the excavationscarried out in late June 2016th

Another small pit was opened. Another view of the second excavationroute.

Another view on the self-cast sewagetank / drain manifold.

page 02 of 4

ISSUE 01.2016 | 03.07.2016

Page 3: SpecialDocumentation "Rural Development Eslarn" issue 01.2016

Rural Development EslarnThe Eslarn wastwater projects.sanitizing the sewer system "schellenbachstrasse"

They are woking hard (19 of June 1016).

They will continue here soon. Re usable road part on July 3, 2016

Locally limited excavations to affecttraffic as little as possible.

This road part will be re usable until the10 of July 2016.

Construction equipment you will need:Here a vibriting plate.

page 03 of 4

ISSUE 01.2016 | 03.07.2016

Page 4: SpecialDocumentation "Rural Development Eslarn" issue 01.2016

Rural Development EslarnThe Eslarn wastwater projects.sanitizing the sewer system "schellenbachstrasse"

They are woking hard (19 of June 1016).

They will continue here soon. Re usable road part on July 3, 2016

Locally limited excavations to affecttraffic as little as possible.

IMPRINT

DEEZ ­ Die Erste Eslarner Zeitung, Editorial: Theresia M. Zach, Ludwig­Müller­Str. 2, D­92693Eslarn. Phone: 0049 (0)163 7093031, Fax: 0049 (0)9653 40 70 001, Email: oikos­[email protected].

Responsible for the content (in German "V.i.S.d.P.:"): Michael W. Zach, Ludwig­Müller­Str. 2, D­92693 Eslarn. Phone: 0049 (0)163 7093031, Fax: 0049 (0)9653 40 70 001, Email: oikos­[email protected].

Images are re usable under the Common Creatives License CC­BY­SA 3.0 non ported

page 04 of 4

ISSUE 01.2016 | 03.07.2016