special meeting the corporation of the municipality of

8
Special Meeting The Corporation of the Municipality of Central Elgin Friday, June 19th, 2015 @ 9:30 a.m. Page Call to Order Disclosure of Pecuniary Interest and the General Nature Thereof Reports 1. PW 55 - 15 Port Stanley Harbour, West Breakwater Slope Rehabilitation, Tender Award Bylaws By-law 1899 Memorandum of Understanding with 1788764 Ontario Inc. respecting 350 Edith Cavell Blvd. By-law 1900 Being a By-law to Execute a Lease Agreement with 1788764 Ontario Inc., respecting 350 Edith Cavell Blvd. By-law 1901 Being a By-law to Execute an Agreement with East Elgin Concrete Forming respecting West Breakwater Slope Rehabilitation Closed Session Facility/Road Tour 1. Tentative Schedule of Facility/Road Tour locations and times Adjournment 2-4 5 6 7 8 Page 1 of 8

Upload: others

Post on 21-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Special Meeting The Corporation of the Municipality of

Special Meeting

The Corporation of the Municipality of Central Elgin

Friday, June 19th, 2015 @ 9:30 a.m.  Page

Call to Order

Disclosure of Pecuniary Interest and the General Nature Thereof

Reports1. PW 55-15

Port Stanley Harbour, West Breakwater Slope Rehabilitation, Tender Award

BylawsBy-law 1899  Memorandum of Understanding with 1788764 Ontario Inc. respecting 350

Edith Cavell Blvd.

By-law 1900  Being a By-law to Execute a Lease Agreement with 1788764 Ontario Inc., respecting 350 Edith Cavell Blvd.

By-law 1901  Being a By-law to Execute an Agreement with East Elgin Concrete Forming respecting West Breakwater Slope Rehabilitation

Closed Session

Facility/Road Tour1.

Tentative Schedule of Facility/Road Tour locations and times

Adjournment

2-4

5

6

7

8

Page 1 of 8

Page 2: Special Meeting The Corporation of the Municipality of

The Corporation of the Municipality of.

Central Elgin

DATE: June 17, 2015

TO: To His Worship Mayor Marr and Council

PREPARED BY: Lloyd J. Perrin

Director of Physical Services

SUBJECT: Port Stanley Harbour, West Breakwater SlopeRehabilitation, Tender Award

TO COUNCIL: June 22, 2015

REPORT: PW -55 -15

RECOMMENDATION.

THAT the Council of the Municipality receives report PW 55 -15 as information.

AND THAT Council award the contract for the rehabilitation of the west sloped face ( lake

side) of the west breakwater to East Elgin Concrete Forming in amount of $876,870 exclusiveof HST.

REPORT:

At the June 81, 2015 meeting of Council, staff were instructed to go to public tender for therehabilitation of the west sloped face ( lake side) of the west breakwater. This work wouldcomplete the restoration work of the west breakwater. As a result, tenders were invited and

advertised publically on Thursday June 111', 2015.

Staff would note that 8 plan takers picked up tenders and 2 contractors provided bids at theclosing of the tender at 11 :00am on June 171i, 2015. Tenders were opened publically at 11: 05on June 171. Tender results are appended to this report for Council' s information.

The low bid was received from East Elgin Concrete Forming ( EECF) in the amount of876,870. The engineers estimate to complete the work is $ 900,000.

Staff would note that EECF has provided excellent quality workmanship on the work that hasbeen completed to date on the project. There has been extensive effort put forth by thecontractor to ensure that the work is completed on schedule and timelines are met

Given the foregoing, staff would recommend that the work be awarded to EECF.

Port Stanley Harbour, West Breakwater Slope

Page 2 of 8

Page 3: Special Meeting The Corporation of the Municipality of

Prepared By:

Lloyd Perrin,

Director of Physical Services CAO /Clerk

Port Stanley Harbour, West Breakwater Slope

Page 3 of 8

Page 4: Special Meeting The Corporation of the Municipality of

rLO

0N

co0

w0

Q

dt

Z_

wWa0

0JJ

i•

Jw

J

ZLIJci

Ka) zZ

U) WU ZC7 W

IL

zQm co

WF- WL) zzOUZ

C7JW

WzmIr

FWW

zZ

OUZ_

U` JW

a

DU)

wuj0

W

Y

ZW

O

J_

inQSWOfWILO

zE

0' z r N

a

YQW0

LUGa o

W WQJa m

cf) oW I-

HN

LU

D

m

WLUa W

z LLJwrz

0a ILIL v

oOLL

z

U CD 0ZLU W

Z ULLH W LL

Port Stanley Harbour, West Breakwater Slope

Page 4 of 8

Page 5: Special Meeting The Corporation of the Municipality of

Memorandum of Understanding with 1788764

Page 5 of 8

Page 6: Special Meeting The Corporation of the Municipality of

C ntlrlEIg1

BY-LAW 1900

Being a By-law to Authorize the Mayor and the Clerk toExecute a Lease Agreement with 1788764 Ontario lnc.,

350 Edith Cavell Boulevard

HEREAS Council deems it to be in the public interest;

OW THEREFORE THE COUNCIL OF THE CORPORATION OF THE MUNICIPALITYOFENTRAL ELGIN ENACTS AS FOLLOWS:

The Mayor is hereby authorized on behalf of The Corporation of the Municipality ofCentral Elgin to execute a Lease Agreement with 1788764 Ontario lnc., 350 EdithCavell Boulevard.

A copy of the Agreement shall remain attached to and form part of this By-law.

READ a FIRST and a SECOND TIME this 19"‘day of June, 2015.

READ A THIRD TIME and FINALLYPASSED this 19"‘day of June, 2015.

Being a By-law to Execute a Lease Agreement with

Page 6 of 8

Page 7: Special Meeting The Corporation of the Municipality of

Being a By-law to Execute an Agreement with East

Page 7 of 8

Page 8: Special Meeting The Corporation of the Municipality of

m

._.m

:nm

:<m

_um

n==

<._

.o..:

. Um

<_u

_.E

m<

.._

..:..m

3.N

3m

>9%

mn_

.mm

:_m

nocs

nzn:

m3c

mR

EE

mm

mcz

ooq 3

.x

83.

353

mao

cém

a_.

_:m

mm

_3o3

I8m

aze:

mm

_3o3

<<

m8«

?mm

a3m

3E

mi

Do:

<2:

3%G

_u_m

m: 3a

m.m_

§m3.

5

U.._

<.:m

.35

4:03

.80:

Cam

mo 3

353

.:.o3

_u.n

.o: .

33.3

383

Qm

mnm

i ><

m::m

<<

m_w

_:m

.35

_<.m

mno P

.oum

_..Q

U.._

<_:

m .35

_._m

UU

:3$3.

I

Um

mnz

uaos

m_o

mn_

m_

noc:

n__

_<_m

m::m

.35.

om.?

mm

a3m

3E

2:

<<

m_x

_:m

4.9:

U:<

_:c

.35

asm

cam

m? U1<

m-_<

.c:_

n_um

_O

38

won

mS:

_m< <

<m

%m

<<

m8«

.2m

ma3

m32

%.

<<

m2_

wam

_2,s

§m

ag_.

6::.o

cmm

mcs

mm

e_w

_:m

...

€28

m?m

man

mum

Um

xam

a_._:

m

Tentative Schedule of Facility/Road Tour locations

Page 8 of 8