special industrial tariff (sit) new policy · 2018. 1. 8. · – industrial gas industries cement...
TRANSCRIPT
SPECIAL INDUSTRIAL TARIFF (SIT)NEW POLICY
TENAGA NASIONAL BERHAD
Energy Commission Putrajaya4th November 2015
Overview of Special Industrial Tariff (SIT)
Highlights of New SIT Eligibility Criteria
New SIT Eligibility Criteria
Document to be Submitted
New SIT Rates 2016-2020
Conclusion and Way Forward
1
OVERVIEW OF SPECIAL INDUSTRIAL TARIFF (SIT)
BACKGROUND OF SPECIAL INDUSTRIAL TARIFF (SIT)
• Introduced in 1996 as part of TNB’s new tariff
• Open to 5 identified industries with electricity consumption being 5% or more of their total operating cost
• The industries were:-– Ice factories– Iron and Steel industries– Glass industries– Industrial gas industries
Cement Industrial Gases Iron & Steel Ice Glass
– Industrial gas industries– Cement industries
• On 29 March 1996, the SIT was introduced to all industries (Tariff D, E1, E2 and E3 only) with electricity consumption being 5% or more of their total operating costs
STATISTICS OF SIT FROM 1997/98 TO 2014/2015
Estimated Total Discounts for FY 2014/15 inclusive of IWK and water operators
discountRM 495.38 mil
For FY 2014/15 the data is as at Oct 2015. This figures exclude IWK and water operators who are entitled for automatic SIT discount effective from 1 Jan 2014 (about RM 33.2 mil discount)
2HIGHLIGHTS OF NEW SIT ELIGIBILITY
CRITERIA
EXTRACT OF ENERGY COMMISSION LETTER DATED 26 AUGUST 2015
Gradual removal of SIT discount effective from 1st Jan 2016:
Gradual removal of 2% yearly from Jan 2016 until Jan 2020.
No new SIT application after 1st Jan 2016.
New SIT eligibility criteria as New SIT eligibility criteria as specified by Energy Commission based on energy efficiency mechanism.
Encourage energy efficiency and minimize wastage among the industries
(Menggalakkan pihak industri menggunakan tenaga secara cekapdan meminimumkan pembaziran)
OBJECTIVES TO GRADUALLY PHASE OUT SIT
1
8
Align TNB electricity tariff with Energy Efficiency policy
(Menyelaraskan tarif TNB dengan dasar penggalakan amalan cekaptenaga di kalangan pengguna industri)
2
OVERVIEW OF CURRENT VS NEW SIT ELIGIBILITY CRITERIA
Eligibility Criteria:
Total electricity cost≥ 5%
CURRENT(Electricity Cost Basis)
CURRENT(Electricity Cost Basis)
NEW(Energy Efficiency Basis)
NEW(Energy Efficiency Basis)
Eligibility Criteria:
Efficiency Index = Improvement in kWh/unit production or kWh
Total electricity cost
Total company operating cost ≥ 5% in kWh/unit production or kWh
savings
SIT Committee Members consist of:
• GM Commercial Management• AGM Consumer Chargers
CURRENT (TNB only) FUTURE (TNB and EC)
SIT COMMITTEE MEMBERS
SIT Committee Members consist of:
TNB• GM Commercial Management• AGM Consumer Chargers• Senior Manager (Customer Service)
• AGM Consumer Chargers• Senior Manager (Customer Service)• Senior Manager (Finance)• Secretariat• Reviewer (Customer Service)• Reviewer (Finance)
• Senior Manager (Customer Service)• Senior Manager (Finance)• Secretariat• Reviewer (Customer Service)• Reviewer (Finance)
EC representative (new)
• Only existing SIT customer may apply for SIT after 2 January 2016 • Existing customers who have applied for SIT at least once in the last 3
years (2013-2015) are still entitled to apply based on new policy.
• New SIT application will only be accepted up to 1 January 2016 except for
KEY HIGHLIGHTS OF NEW SIT POLICY
WHO CAN APPLY?
• New SIT application will only be accepted up to 1 January 2016 except for pre awarded customers under 1st principle calculation for Connection Charges payment (Customers taking supply at 132kV and above)
Customer Who Can Apply For SIT after 1st January 2016 (Based on Annual Report 2016)
Submission Date Before 1 Jan 2016 After 1 Jan 2016
Review Yes Yes
Resubmission Yes Yes
New Yes No
Example: Company A submit on 30 Dis 2015
Account Number
Type Can Apply
123 Review Yes
1333 Resubmission Yes
1234 New Yes
Example: Company B submit after 1 Jan 2016
Account Number
Type Can Apply
123 Review Yes
1333 Resubmission Yes
1234 New No
NEW POLICY YEAR 1- FOR COMPANY’S FY JAN 2016 – DEC 2016
• Audited Annual Report for the Financial Year (FY) 2016.
• Appendix 1 endorsed by External Auditor
• 12 months electricity bill for the same FY
5% ELECTRICITY COST THRESHOLD
Eligibility CriteriaDocuments to Documents to
Submit
AND
Y
E
A
R
1
F
Y
• Appointment letter of Energy Manager
• Valid Energy Manager Certificate
• Baseline kWh/unit production – historical data for previous 1 year (12 months).
• The baseline is mandatory and required for subsequent year’s eligibility
• Energy Efficiency (EE) plan endorsed by Energy Manager
EE REQUIREMENTS
ANDJ
A
N
1
6
–
D
E
C
1
6
NEW POLICY YEAR 2- FOR COMPANY’S FY JAN 2017 ONWARDS
• Audited Annual Financial Report for the Financial Year (FY) 2016.
• Appendix 1 endorsed by External Auditor
• 12 months electricity bill for the same FY
5% ELECTRICITY COST THRESHOLD
Eligibility CriteriaDocuments to Documents to
Submit
Y
E
A
R
2
F
Y
• Appointment letter of Energy Manager
• Valid Energy Manager Certificate
• Energy Efficiency (EE) plan endorsed by Energy Manager
• Appendix 2- Improvement in kWh /unit production or kWh savings (comparison with previous year kWh/production index)
EE REQUIREMENTS
2
0
1
7
O
N
WA
R
D
S
OTHER CONDITIONS FOR YEAR 2016 ONWARDS
i. The SIT eligibility is not automatic and must be applied on a yearly basis (including continuous SIT customers).
ii. SIT applications must be submitted within 5 months from the company’s financial year-end.
iii. For resubmission cases (not eligible in the previous year), the SIT approval will be applied beginning one month after all
The existing SIT application criteria is maintained:
SIT approval will be applied beginning one month after all required documents have been received, and ends at the upcoming company’s financial year-end while for review cases, the eligibility is for 12 months.
iv. Successful SIT applications will be required to sign a new electricity contract within 7 days after receiving a notification letter from TNB to effect the special industrial tariff.
v. No Meter Installation Tempering (MIT) case.
vi. TNB reserved the right to engage a third party to verify the documents submitted and the cost to be borne by the customer.
APPENDIX 1
Note: Applicable for Company FY Jan16 to Dec 16 submission since electricity cost is still one of the eligibility criteria
APPENDIX 2
Main Products
Actual Electricity
Consumption (kWh)/year
Actual Total Production (unit)/year
Total electricity consumption per
unit products (kWh/unit)
(current year)
Total electricity consumption per
unit products (kWh/unit)(last year)*
Products 1 :
APPENDIX 2Customer Name : _________________________________________TNB Account’s No : _________________________________________Registered Energy Manager : ________________________Validation of Energy Manager Certificate : _________________________
* Not Products 2 :Products 3 :Products 4 :Total Weightage / Average
** Energy Manager’s comments (if any):______________________________________________________________________________________________________________________________________________________________
We certify that the data (direct & indirect) relating to the above premise reflect a true and fair picture of the operation.
…………………………………………Certified by Energy Manager
( signed & stamped )
* Not applicable for Year 1
NEW SIT PROCESS FLOW
1st year application:(cust FY start Jan 2016)
Submit Documentsto TNB:
-AR,12 mths bill, -Appendix 1, -EE requirements
Meet Criteria
?
Start
No
2nd year applicationonwards:
CustomerSubmit Documents
to TNB:- Appendix 2- EE requirements
Meet Criteria
?
Start
No
?
TNB Check for 5% eligibility, MIT,EE and
Present to SIT Committee
Eligible?
Inform Customer, Change SIT Tariff and
Issue Credit Note
Yes
Yes
No
?
TNB Check MIT,EE and Present to SIT
Committee
Eligible?
Inform Customer, Change SIT Tariff and
Issue Credit Note
Yes
Yes
No
DOCUMENTS CHECKLISTYEAR 1 : FOR COMPANY’S FY JAN 2016 – DIS 2016
DOCUMENTS CHECKLIST: FOR YEAR 2 (2017 ONWARDS)
Gradual removal of 2% SIT discount yearly from Jan 2016 until Jan 2020.
GRADUAL REMOVAL OF SIT
4%
6%
8%
10%
12%
Dis
kau
n S
IT
No new application after
1 January 2016SIT Discount ends in year 2020
Kadar Diskaun SIT Semasa
Jan '16 Jan '17 Jan '18 Jan '19 Jan '20
Tarif E3s 10.30% 8.30% 6.30% 4.30% 2.30% 0.00%
Tarif E2s 8.30% 6.30% 4.30% 2.30% 0.30% 0.00%
Tarif E1s 4.80% 2.80% 0.80% 0.00% 0.00% 0.00%
Tarif Ds 3.00% 3.00% 1.00% 0.00% 0.00% 0.00%
0%
2%
SPECIAL INDUSTRIAL TARIFF Existing Rates New Rates New Rates
01-Jan-14 01-Jan-16 01-Jan-17
Tariff Ds – Special Industrial Tariff
(for consumers who qualify only)
For all kWh sen/kWh 42.70 42.70 43.60
The Minimum Monthly Charge is RM 7.20 7.20 7.20
Tariff E1s – Special Industrial Tariff
(for consumers who qualify only)
For each kilowatt of maximum demand per month RM/kW 23.70 26.00 28.50
For all kWh sen/kWh 33.60 33.70 33.70
The Minimum Monthly Charge is RM 600.00 600.00 600.00
Tariff E2s – Special Industrial Tariff
(for consumers who qualify only)
For each kilowatt of maximum demand per month during the peak period RM/kW 32.90 33.60 34.30
Tariff Category Unit
Notes:1. 1.6% for Feed-in-Tariff (FiT) is imposed on consumers’ monthly bill (excluding Domestic consumers with monthly consumption of
300kWh and below) effective from 1st January 2014
2. Tariff E1s, E2s, and E3s (Special Industrial Tariff) increased by 2% annualy starting 1st January 2016
3. Tariff Ds (Special Industrial Tariff) increased by 2% annualy starting 1st January 2017
For each kilowatt of maximum demand per month during the peak period RM/kW 32.90 33.60 34.30
For all kWh during the peak period sen/kWh 33.60 34.30 35.00
For all kWh during the off-peak period sen/kWh 19.10 19.50 19.90
The Minimum Monthly Charge is RM 600.00 600.00 600.00
Tariff E3s – Special Industrial Tariff
(for consumers who qualify only)
For each kilowatt of maximum demand per month during the peak period RM/kW 29.00 29.60 30.20
For all kWh during the peak period sen/kWh 31.70 32.30 32.90
For all kWh during the off-peak period sen/kWh 17.50 17.90 18.30
The Minimum Monthly Charge is RM 600.00 600.00 600.00
All SIT Customer to take note of the new SIT Policy effective 1st Jan 2016
No NEW SIT application after 1 Jan 2016.
Submission of SIT documents: Year 1 – Proof of 5% electricity cost and EE baseline Year 2 – Improvement of kWh/unit production.
SIT WAY
1
2
3
CONCLUSION
TNB will inform the new SIT eligibility criteria to all SIT customers
For further inquiries:5% electricity cost (TNB):En. Jude Ignatius Lazaroo (Tel : 03 - 7967 9247)Pn. Mazni Binti Kornan (Tel: 03 – 7967 9276)
EE Requirement (EC):Puan Hafiza Binti Yob
SIT WAY FORWARD
4
5