  • 7/28/2019 SP1 One Week Lookahead 27th Dec-29thDec

    1/2

    Week 52: SP1

    What Where X-Start X-Finish

    18-SB-001

    (Switchboard)

    Complete installation of

    Internal/external lights cablesElmo 27-Dec 29-Dec

    Await unistrut covers & Termination at

    the DB side.

    CivilContinue cable rack installation on the

    Culvert Elmo 27-Dec 29-Dec

    WW cannot install cable rack beyond

    roadcrossing .Switchboard ETA - 7thJanuary 2013

    CIL PIPERACK

    D2Cable Ladder

    Continue with rack after Goldroom

    towards Cil SwitchroomStuart 27-Dec 29-Dec

    Prepare Tx & MCC Gland Plates Elmo 27-Dec 29-Dec

    Install 4x3x630mmx1C from Transformer

    to MCCAndy 27-Dec 28-Dec

    Terminate the 4x3 x 630mm x 1C Andy 27-Dec 28-Dec

    Internal ups DB & Control Panel: Fab &

    Install Supports for and CPElmo 27-Dec 28-Dec

    Walls have a single coat. Confirm if

    ready.

    Event PondContinue cable rack installation towards

    the Event PondsStuart 27-Dec 29-Dec Partial Access

    CCD1 & CCD2Resume cable rack installation towards

    CCD1 and CCD2 Thickeners

    Stuart 27-Dec 29-Dec Partial access available.

    Qa/QcTorque Switchgear, Inspection, Punch

    Items & Qc PacksMarion 27-Dec 29-Dec On-going

    12-MC-001 (MCC)Start Internal Cabling (Marshalling/PLC)

    and to L&SP DBAndy 27-Dec 29-Dec

    Install SUBSTATION MAIN EARTH BAR 12-

    EB-002 (120mm x 1C Cu PVC Gn/Y

    0.6/1kV)

    Andy 27-Dec 29-Dec Earth/bus-bar not on site

    Inspect MCC & Transformer Installations,

    Torque the Bus-barMarion 27-Dec 27-Dec

    13-MC-001 [MCC]Start Internal Cabling (Marshalling/PLC)

    and to L&SP DBAndy 27-Dec 29-Dec

    13-TX-001

    [Transformer]

    Install SUBSTATION MAIN EARTH BAR 13-

    EB-001 (120mm x 1C Cu PVC Gn/Y

    0.6/1kV)

    Phineas 27-Dec 29-Dec Earth/bus-bar not on site

    Qa/QcInspect MCC & Transformer Installations,

    Torque the Bus-barMarion 27-Dec 29-Dec

    Continue Installatio n of Unistrut & Lights Elmo 27-Dec 29-Dec Whenever access is avilable

    Install cables for light circuits for Megg44

    lights in MillingElmo 27-Dec 29-Dec Lights mounted. Require cabling.

    Continue with cable racks on ground

    floorElmo 27-Dec 29-Dec Wherever/Wh enever access is avilable

    Install cables for light circuits for Megg44

    lights in MillingElmo 27-Dec 29-Dec Lights mounted. Require cabling.

    Continue with cable racks on ground

    floorElmo 27-Dec 29-Dec Wherever/Wh enever access is avilable

    Inspect Lights, Unistrut, ladder, MCC &

    TransformerMarion 27-Dec 29-Dec

    Ground floor under the Mill Area and

    inside Rooms

    Prepare Punch Items & QC Packs Marion 27-Dec 29-Dec

    Continue with Fabrication and

    Installation of Supports and Megg44

    Lights and 150mm cable rack

    Elmo 27-Dec 29-Dec

    Fabricate Support brackets to Motors Elmo 27-Dec 29-Dec

    CILPipe

    Racks(D2&

    D5)

    D5 Piperacks: Complete Scaffolding &

    start Racking from Cooling Towers to the

    CIL Switchroom section

    Stuart 27-Dec 29-Dec Arrange for scaffold

    QaQcQa /Qc Inspection of Installation of

    Equipment & CablesMarion 27-Dec 29-Dec

    Continue pulling cables to Water / Air

    Services, Cooling Towers & Fire Water

    Pumps

    Sadou

    /Leo/Dan27-Dec 29-Dec on-going. Started on Sat 1 Dec

    Complete Termination of External lights

    including Transformer BaysStuart 27-Dec 29-Dec Transformer Bays Lights outstanding

    11KV

    SWITCHBOARD

    Switchgear[13-

    MC-101]

    CCD

    Main Plant 1 Week LookAhead [27 Dec - 29 Dec 2012]

    AREA

    Description Whom

    When

    Remarks/Constraint

    SAGMillArea

    BALLMill

    Area

    Qa/Qc

    12-TX-002

    (Transformer)

    MILLING

    Pre-Leach

    Flocculant

    Area

    Pre-LeachTank

    18-M

    C-001/

    Water&Air

    Services

    VICESSWITCHROOM

  • 7/28/2019 SP1 One Week Lookahead 27th Dec-29thDec

    2/2

    Complete D5 Piperacks from Cooling

    Towers/Pebble Crusher MCC to CIL

    Switchroom

    Stuart 27-Dec 29-Dec Scaffold shortage.

    Start pulling supply & control cables for

    2xMotors, 6xBlower Fan Motors

    Sadou

    /Leo/Dan27-Dec 29-Dec

    Install GPOs Samson Leo 27-Dec 29-Dec GPOs not on site

    17-MC-001 Install Welding Socket Outlet Samson Leo 27-Dec 29-Dec Not on-site

    Install Stop/Starts Elmo / Leo 27-Dec 29-Dec Not on-site

    Install Pumps: 18-PP-035; 18-PP-036; 18-

    PP-037Lyco/Others 27-Dec 29-Dec

    Not on-site. Supply & Control cables

    are in position.

    Terminate the Pump Motors Samson Leo 27-Dec 29-Dec Await pump installation.

    Complete Instrumentation cables

    reticulation27-Dec 29-Dec

    Top of Tank inaccessible. Await access

    from Mechanical/Lyco

    Install Sump Pump Motor 17-PP-007 Lyco/Others 27-Dec 29-Dec Not onsite

    Gland & Terminate cables for :- 17-PP-

    006 & 007Samson leo 27-Dec 29-Dec

    Can only terminate 17-PP-007 after its

    installation. Done at MCC side

    Install Sump Pump Motor 17-PP-018 Lyco/Others 27-Dec 29-DecMotor not installed. Cable is in

    position.

    Terminate 17PP018-P1 and Control

    Cables Samson Leo 27-Dec 29-Dec

    Await pump installation. Cable is in

    position. Terminated MCC side

    Terminate Control cables (X3 Nos):

    17PP014-C1; 17PP015-C1; 17PP016-C1Samson Leo 27-Dec 29-Dec

    IJB not on site. Done at the MCC side.

    Cable is on position

    Install Stop Start, Terminate Control

    cables (17PP019-C1)

    Stuart /

    Samson Leo27-Dec 29-Dec

    Not on site. Cables pulled and near

    position.

    Install GPOs (x2 Nos) 17DB001-01 AND

    17DB001-02Samson Leo 27-Dec 29-Dec GPOs not on si te. Cables on posit ion.

    Fabricate cable dropper for sump pump

    motors (x2 supply cables)Stuart 27-Dec 29-Dec

    Continue Terminations of Lights

    (Internal/External Lighting)Samson Leo 27-Dec 29-Dec

    Start structural earthing & Finials Samson Leo 27-Dec 29-Dec

    QaQc Inspections & Punch Items Marion 27-Dec 29-Dec

    ShiftChangeBuilding

    24FO010-F1: Splice Fibre in FOBOT 24-FO

    010Rashid 27-Dec 29-Dec

    Spliced at Shift Change Building. To Do

    Admin Building side.

    MSA

    Workshop/Wareho

    24FO031-F1: Splice Fibre in FOBOT 24-FO

    003Rashid 27-Dec 29-Dec

    Spliced at Shift Change Building. To Do

    Admin Building side.

    18FO032-F1: Splice cable Rashid 27-Dec 29-Dec

    Main SecurityInstall FOBOT [18-FO-025] & Splice Fibre

    Optic Cables 18FO025-F1, 18FO025-F2Rashid 27-Dec 29-Dec

    Lookout for Access, Will resume when

    roof is completed by others

    Plant Main Control

    Room

    Workshop/Wareho

    use

    1) Install FOBOT [18-FO-003], 2) Start

    Fibre Optics Cable Reticulation from

    Milling Switchroom (18FO003-F1 &

    18FO003-F2), Data Centre (18FO003-F3)

    and to Reagents Area (18FO012-F2)

    Rashid 27-Dec 29-Dec

    Reagents AreaInstall FOBOT: 18-FO-012; 2) Pull cable

    18FO012-F1 to Goldroom (near position)Rashid/Leo 27-Dec 29-Dec

    Qa/QcInspections, Point-to-Point Tests, Puch

    ItemsMarion 27-Dec 29-Dec

    DiselFuel

    Storage

    Area

    HydrochloricAcid

    Area

    AREA1

    7-REAGENTS

    CyanideArea

    Cooling TowersCILSE

    MSA

    Area2100

    -UtilitiesGeneral[MiningInfrastructu

    re&

    MainPlant]