sp pertemuan 1
DESCRIPTION
Sistem PenambanganTRANSCRIPT
![Page 1: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/1.jpg)
Mining SystemHENDRA HARISMAN, ST., M.ENG.SC.
26 FEBRUARI 2015
![Page 2: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/2.jpg)
Electronic devicesPlease SWITCH OFF.
• If you are using these devices◦ You are NOT PARTICIPATING in class
• WHY ARE YOU HERE????
![Page 3: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/3.jpg)
Mining operations – life stages• Prospecting
– discovery of mineral deposit
• Exploration
– ore body definition – size, shape, geometry, ore, waste, etc.
• Development
– mineral rights acquisition, environmental impact statement, construction of access roads, surface facilities, access to ore body
![Page 4: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/4.jpg)
Mining operations – life stages• Exploitation
– excavate ore body
– surface or underground mining methods/systems
• Reclamation and closure
– site restoration
![Page 5: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/5.jpg)
Mining system selection• Spatial characteristics of the deposit
– Size – height, thickness, and other dimensions– Shape – tabular, lenticular, massive, or irregular– Attitude – dip, strike– Depth, mean and extreme values– Ore boundaries– Existence of previous mining
![Page 6: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/6.jpg)
Mining system selection• Spatial characteristics of the deposit
– Surface vs. underground– Mine layout– Materials handling– Production rate
![Page 7: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/7.jpg)
Mining system selection• Geologic and hydrologic conditions
– Mineralogy and petrology – sulphides vs. oxides in copper– Chemical composition – primary and secondary minerals– Deposit structure – folds, faults, etc.– Planes of weakness – joints, fractures, shear zones– Uniformity of grade– Existence of strata gases
![Page 8: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/8.jpg)
Mining system selection• Geologic and hydrologic conditions
– Selective and non-selective mining methods– Ground support requirements– Pumping and drainage requirements– Mineral processing and smelting requirements
![Page 9: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/9.jpg)
Mining system selection• Geotechnical properties
– Ore and rock strength– State of stress (pre-mining, post-mining)– Rock mass rating– Other physical properties – specific gravity, voids, porosity,
permeability, moisture content
![Page 10: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/10.jpg)
Mining system selection• Geotechnical properties
– Equipment selection– Support requirements
![Page 11: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/11.jpg)
Mining system selection• Economic considerations
– Reserves (grade and tonnage)– Production rate (tonnes per day/month/year)– Mine life– Productivity– Capital and operating costs
![Page 12: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/12.jpg)
Mining system selection• Economic considerations
– Output– Investment– Cash flow– Payback period– Profit
![Page 13: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/13.jpg)
Mining system selection• Technological factors
– Recovery – proportion of ore extracted– Dilution– Flexibility to changing conditions– Selectivity between ore and waste– Mechanization– Capital and labour requirements
![Page 14: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/14.jpg)
Mining system selection• Technological factors
– Choice among possible methods– Subsequent operations – processing, smelting, environment
![Page 15: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/15.jpg)
Mining system selection• Environmental concerns
– Waste disposal– Workforce– Safety– Atmospheric control – ventilation, air quality, heat and humidity– Subsidence or caving effects– Post-mining use
![Page 16: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/16.jpg)
Mining system selection• Procedure
– Engineering judgement – some factors are not quantifiable– Quantified evaluations
- computerized operations research based methods
![Page 17: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/17.jpg)
Mining system selection• Conceptual study – physical characteristics and production
potential of mining methods and layouts are assessed• Engineering study – quantified parameters are compared• Detailed design study – drawings and construction specifications
for preferred method are prepared• Flexibilities and variations in the preferred methods must be
considered at this stage– Possible new technologies
![Page 18: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/18.jpg)
![Page 19: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/19.jpg)
Mining system• Surface mining systems • Underground mining systems
![Page 20: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/20.jpg)
Surface mining systems• Open pit mining
– Metallic and non-metallic ores– Mass production
• Open cast/strip mining– Coal
• Quarrying– Dimension stones – marble, granite
• Solution mining
![Page 21: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/21.jpg)
Underground mining systems• Unsupported mining systems
– Room and pillar mining– Stope and pillar mining– Shrinkage stoping– Sublevel stoping
![Page 22: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/22.jpg)
Underground mining systems• Supported systems
– Cut-and-fill stoping– Stull stoping– Square-set stoping
![Page 23: SP Pertemuan 1](https://reader038.vdocuments.mx/reader038/viewer/2022110204/563db779550346aa9a8b5a21/html5/thumbnails/23.jpg)
Underground mining systems• Caving systems
– Long-wall mining– Sublevel caving– Block caving