Southside FloodProtection
Red River Channel Extension
September 15, 2008
1997 Spring Flood –Fargo, Moorhead
Rose Coulee
Red River
Fargo
50th Avenue South
Moorhead
Univ
ers
ity D
rive
1997 Spring Flood – South of Fargo
Rose CouleeRed River
25th S
treet
Sou
th
Fargo
University DriveMoorhead
60th Ave. SW
Preliminary 100 & 500 Year
Floodplains
Oxbow
Horace
MoorheadWest Fargo
FargoInterstate Hwy 94
Inte
rsta
te H
wy 2
9
Southside Flood
Control
RED RIVER AT FARGO - USGS GAGING STATIONHISTORICAL FLOOD DATA
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000
Years of Record
50 Year Discharge - 22,300 CFS
10 Year Discharge - 10,300 CFS
100 Year Discharge - 29,300 CFS
Pea
k D
isch
arge
(CFS)
1997 Spring Flood - 28,000 CFS
Southside Flood Control
North Dakota State Climate Office
• FEMA levees with and without diversion channels
• Channel extensions(Red River & drain improvements)
• Storage inside of project
• Storage in upstream watershed
Project Flood Control Methods
Base Project
Southside Flood
Control
Wild Rice River Levee Alternative
Issues Raised With Base Alternatives• Red River & Wild Rice River impacts
(Higher flood levels)
• Lost storage (Concern storage impact will simply move impacts upstream)
• Properties east of Hwy 81 and upstream receive no protection
CHANNEL EXTENSION AND
STORAGE SUMMARYExisting effective storage 6,000 Acre-Ft
Base project 0 Acre-Ft
Channel extension/storage 2,000 Acre-Ft
Supplemental storage 4,000 Acre-Ft
Southside Flood
Control
North Dakota
Minnesota
Red River
Red RiverChannel
Extension
Typical Red River Cross-Section
SOUTHSIDE FLOOD CONTROL
Wild Rice River Levees Alternative – Red River Impacts
SOUTHSIDE FLOOD CONTROL
Wild Rice River Levees Alternative – Red River Impacts
Red River Flood Timing
Red River - Average Channel Velocity Comparison
Wild
Ric
e R
iver
Cas
s H
wy
16 B
ridge
Mai
n A
ve B
ridge
Inte
rsta
te 9
4
Ros
e C
oule
e
Bria
rwoo
d
76th
Ave
nue
Sou
th
Cas
s H
wy
18 B
ridge
52nd
Ave
Bri
dge
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
450.00 455.00 460.00 465.00 470.00 475.00 480.00 485.00 490.00
River Miles
Ave
rag
e C
han
nel
Vel
oci
tyProject Existing
0.36 fps
Red River - Average Channel Velocity Change
Wild
Ric
e R
iver
Cas
s H
wy
16 B
ridge
Mai
n A
ve B
ridge
Inte
rsta
te 9
4
Ros
e C
oule
e
Bria
rwoo
d
76th
Ave
nue
Sou
th
Cas
s H
wy
18 B
ridge
52nd
Ave
Bri
dge
-0.100
0.000
0.100
0.200
0.300
0.400
0.500
0.600
0.700
0.800
450.00 455.00 460.00 465.00 470.00 475.00 480.00 485.00 490.00
River Miles
Vel
oci
ty C
han
ge
- F
eet
per
Sec
on
d
Red River - 100 Year Flood - 52nd Ave So.
885
890
895
900
905
9103/
24
3/26
3/28
3/30 4/
1
4/3
4/5
4/7
4/9
4/11
4/13
4/15
4/17
Wat
er S
urfa
ce E
leva
tion
ExistingProject
Red River - 100 Year Flood - 52nd Ave S./60th Avenue SW
906.0
906.5
907.0
907.5
908.04/
1
4/3
4/5
4/7
4/9
Wat
er S
urfa
ce E
leva
tion
Existing
Levees Only
Project26 Hours
3.2 Inches
1997 Spring Flood – South of Fargo
Rose CouleeRed River
25th S
treet
Sou
th
Fargo
University DriveMoorhead
Southside Flood Control
Red River Channel
Extension Options
Southside Flood Control
Technical Committee Preferred Option:
North Dakota Alignment
Southside FloodProtection
Red River Channel Extension Fly Through
Southside Flood
Control
Technical Committee Preferred
Alignments
1997 Spring Flood – South of Fargo
Interstate 29
Cass
Co
Hw
y 81
25th Street S
outh
Project ScheduleDevelopment of options east of University Drive April-June 2008
City Commission Selection of preferred base alternative
July 14, 2008
Public input meetings April 15 - September 2008
Environmental Assessment July – December 2008
Consultant Selection July - December 2008
Begin Design December 2008
CLOMR Submittal July – December 2008
CLOMR Approval March 2009
ROW Acquisitions October 2008 – October 2009
Permitting September 2008 – April 2009
Special Assessment District September – December 2008
Begin Construction June 2009
Functional Completion March 2011
Final Completion July 2012
Questions / Discussion
Southside Flood Control