Page 1: Southern Sydney Freight Line - Easy access upgrades

Daniel Depre

XXXXXXXXXXXXXXXXXXXXX

Leichhardt, NSW, 2040

Email: [email protected]

Dear Sir/Madam,

With reference to the position of xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx, I think it would be prudent to

go into greater detail regarding my 3 years experience working in a live rail environment. I have outlined

this below.

PROJECT:

Southern Sydney Freight Line

PROJECT SCOPE:

Easy access upgrades to seven rail stations along the freight line

MY CURRENT POSITION :

Project Manager

MY PREVIOUS POSITION:

Services Supervisor

MY KEY ROLES & RESPONSIBILITIES IN THE STATION UPGRADES:

- Supervising the installation of services & related infrastructure

- Review of design drawings

- Raising RFI’s / resolving design issues as they arise

- Management of site and sub-contractor issues

- Liaising with the client (RailCorp) as required

- Submission of updated survey data for RailCorp Detailed Site Survey (DSS) drawings

Page 2: Southern Sydney Freight Line - Easy access upgrades

STATIONS & DETAILS OF WORKS SUPERVISED

Sefton

Installation of:

- 415v Padmount transformer

- Fencing to new padmount & rail corridor entry

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- 14 new CCTV cameras

- Lighting to new Family Accessible Toilet, footbridge, stairs, lift landings and disabled access ramp

- Illuminated station signage

- Main Switch Board enclosure

- Upgraded distribution board to Station Managers building

- Exhaust fans to 3 new lifts & Family Accessible Toilet

- Drainage to new lift porch roof (x3), lift landings, footbridge & disabled access ramp

- Plumbing & drainage to Family Accessible Toilet

Page 3: Southern Sydney Freight Line - Easy access upgrades

Cabramatta

- Demolition of existing ticket office

- Demolition of existing toilet block

- Cutover of existing services

- Removal of existing Train Radio Mast

Installation of:

- Self-maintaining Exeloo toilet

- 15 new CCTV cameras

- Ticket vending Machine

- Help Point

- Payphones

- Station Platform Indicator

- Sub-mains cabling to new down side lift

- Emergency phone cabling to new down side lift

- Isolation transformer to Exeloo toilet

- Illuminated station signage

- Security access system to new station manager’s office & booking office

- Lighting & speakers to new stairs, station manager’s office, booking office, footbridge concourse & down

side platform canopy

- Air conditioning to new station manager’s office & booking office

- Exhaust fan to new down side lift

- Drainage to new lift porch roof & down side platform canopy

- Plumbing & drainage to station manager’s office, booking office & footbridge concourse

- New Metronet Train Radio Mast

- Fairfield Council CCTV

Page 4: Southern Sydney Freight Line - Easy access upgrades

Warwick Farm

Installation of:

- 415v Padmount transformer

- Gate & fencing to new padmount & rail corridor entry

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Main Switch Board enclosure

- New distribution boards to commuter car park lighting, down side platform & station manager’s building

- 16 new CCTV cameras

- Ticket Vending Machine

- Help Point

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Illuminated station signage

- Lighting to platforms, commuter car park, new lift porch roof (x3), stair canopies, footbridge canopy & down

side platform canopy & Family Accessible Toilet

- Exhaust fans to 3 new lifts

- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry

- Relocated water meter and vandal-proof housing

- Plumbing & drainage to Family Accessible Toilet

Page 5: Southern Sydney Freight Line - Easy access upgrades

Casula

Installation of:

- 415v Padmount transformer

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Main Switch Board enclosure

- New distribution board to down side platform

- 9 new CCTV cameras

- Ticket Vending Machine

- Help Point

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Lighting to platforms, new lift porch roof (x3), footbridge & stairs

- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry

Page 6: Southern Sydney Freight Line - Easy access upgrades

Minto

Installation of:

- 415v Padmount transformer

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Main Switch Board enclosure

- New distribution board to down side platform

- 13 new CCTV cameras

- Sub-mains cabling to 3 new lifts

- Emergency phone cabling to 3 new lifts

- Lighting to platforms, new lift porch roof (x3), down side access ramp, footbridge & stairs

- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry

- Security Access system to RailCorp staff car park (in progress)

Page 7: Southern Sydney Freight Line - Easy access upgrades

Leumeah

Installation of:

- Sub-mains cabling to new lift

- Emergency phone cabling to new lift

- 9 new CCTV cameras (in progress)

- Illuminated station signage

- Lighting to platforms, commuter car park, new lift porch roof, stair canopy & footbridge canopy

- Exhaust fan to new lift

- Drainage to platforms, new lift porch roof, stair canopy & footbridge canopy

Page 8: Southern Sydney Freight Line - Easy access upgrades

Campbelltown

Works are due to commence in June once the staff footbridge has been earthed & bonded.

Scope of work includes:

- CCTV Installation to staff footbridge

- Security access to staff footbridge

- Lighting to staff footbridge

RAILCORP EMPLOYEES I HAVE WORKED WITH

Ayoub Dayoub – Project Manager SSFL Stations - Major External Works

Stephen Broadhead - Integration Manager - Communications & Control Systems

Mark Rivet - Project Officer - Station Development

Adrian Culbert - Security Advisor - Service Delivery Group - Security Division

John La Scala - Project Officer - Major External Works

John Whiddett - Installation Inspector - Infrastructure Maintenance Division - Electrical Maintenance

John Araco - Communications Field Resources Supervisor - Asset Operations - Communications & Control Systems

Greg Cheyne - Integration Engineer - Engineering & Projects - Major External Works

Andrew Brassell - Cable Network Specialist - Communications & Control Systems

Srinivasulu Mopati - Project Engineer SSFL - External Projects - Projects Division