Daniel Depre
XXXXXXXXXXXXXXXXXXXXX
Leichhardt, NSW, 2040
Email: [email protected]
Dear Sir/Madam,
With reference to the position of xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx, I think it would be prudent to
go into greater detail regarding my 3 years experience working in a live rail environment. I have outlined
this below.
PROJECT:
Southern Sydney Freight Line
PROJECT SCOPE:
Easy access upgrades to seven rail stations along the freight line
MY CURRENT POSITION :
Project Manager
MY PREVIOUS POSITION:
Services Supervisor
MY KEY ROLES & RESPONSIBILITIES IN THE STATION UPGRADES:
- Supervising the installation of services & related infrastructure
- Review of design drawings
- Raising RFI’s / resolving design issues as they arise
- Management of site and sub-contractor issues
- Liaising with the client (RailCorp) as required
- Submission of updated survey data for RailCorp Detailed Site Survey (DSS) drawings
STATIONS & DETAILS OF WORKS SUPERVISED
Sefton
Installation of:
- 415v Padmount transformer
- Fencing to new padmount & rail corridor entry
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- 14 new CCTV cameras
- Lighting to new Family Accessible Toilet, footbridge, stairs, lift landings and disabled access ramp
- Illuminated station signage
- Main Switch Board enclosure
- Upgraded distribution board to Station Managers building
- Exhaust fans to 3 new lifts & Family Accessible Toilet
- Drainage to new lift porch roof (x3), lift landings, footbridge & disabled access ramp
- Plumbing & drainage to Family Accessible Toilet
Cabramatta
- Demolition of existing ticket office
- Demolition of existing toilet block
- Cutover of existing services
- Removal of existing Train Radio Mast
Installation of:
- Self-maintaining Exeloo toilet
- 15 new CCTV cameras
- Ticket vending Machine
- Help Point
- Payphones
- Station Platform Indicator
- Sub-mains cabling to new down side lift
- Emergency phone cabling to new down side lift
- Isolation transformer to Exeloo toilet
- Illuminated station signage
- Security access system to new station manager’s office & booking office
- Lighting & speakers to new stairs, station manager’s office, booking office, footbridge concourse & down
side platform canopy
- Air conditioning to new station manager’s office & booking office
- Exhaust fan to new down side lift
- Drainage to new lift porch roof & down side platform canopy
- Plumbing & drainage to station manager’s office, booking office & footbridge concourse
- New Metronet Train Radio Mast
- Fairfield Council CCTV
Warwick Farm
Installation of:
- 415v Padmount transformer
- Gate & fencing to new padmount & rail corridor entry
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Main Switch Board enclosure
- New distribution boards to commuter car park lighting, down side platform & station manager’s building
- 16 new CCTV cameras
- Ticket Vending Machine
- Help Point
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Illuminated station signage
- Lighting to platforms, commuter car park, new lift porch roof (x3), stair canopies, footbridge canopy & down
side platform canopy & Family Accessible Toilet
- Exhaust fans to 3 new lifts
- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry
- Relocated water meter and vandal-proof housing
- Plumbing & drainage to Family Accessible Toilet
Casula
Installation of:
- 415v Padmount transformer
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Main Switch Board enclosure
- New distribution board to down side platform
- 9 new CCTV cameras
- Ticket Vending Machine
- Help Point
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Lighting to platforms, new lift porch roof (x3), footbridge & stairs
- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry
Minto
Installation of:
- 415v Padmount transformer
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Main Switch Board enclosure
- New distribution board to down side platform
- 13 new CCTV cameras
- Sub-mains cabling to 3 new lifts
- Emergency phone cabling to 3 new lifts
- Lighting to platforms, new lift porch roof (x3), down side access ramp, footbridge & stairs
- Drainage to new lift porch roof (x3), lift landings, footbridge & platform entry
- Security Access system to RailCorp staff car park (in progress)
Leumeah
Installation of:
- Sub-mains cabling to new lift
- Emergency phone cabling to new lift
- 9 new CCTV cameras (in progress)
- Illuminated station signage
- Lighting to platforms, commuter car park, new lift porch roof, stair canopy & footbridge canopy
- Exhaust fan to new lift
- Drainage to platforms, new lift porch roof, stair canopy & footbridge canopy
Campbelltown
Works are due to commence in June once the staff footbridge has been earthed & bonded.
Scope of work includes:
- CCTV Installation to staff footbridge
- Security access to staff footbridge
- Lighting to staff footbridge
RAILCORP EMPLOYEES I HAVE WORKED WITH
Ayoub Dayoub – Project Manager SSFL Stations - Major External Works
Stephen Broadhead - Integration Manager - Communications & Control Systems
Mark Rivet - Project Officer - Station Development
Adrian Culbert - Security Advisor - Service Delivery Group - Security Division
John La Scala - Project Officer - Major External Works
John Whiddett - Installation Inspector - Infrastructure Maintenance Division - Electrical Maintenance
John Araco - Communications Field Resources Supervisor - Asset Operations - Communications & Control Systems
Greg Cheyne - Integration Engineer - Engineering & Projects - Major External Works
Andrew Brassell - Cable Network Specialist - Communications & Control Systems
Srinivasulu Mopati - Project Engineer SSFL - External Projects - Projects Division