southern interconnection croatia – bosnia and … · southern interconnection hr - bosnia &...

7
SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND HERZEGOVINA (Zagvozd - Imotski (HR) – Posušje – Tomislavgrad – Novi Travnik with branch to Mostar (BiH)) CESEC Gas Plenary Meeting Brussels, 8 October 2019

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

SOUTHERN INTERCONNECTION CROATIA –BOSNIA AND HERZEGOVINA

(Zagvozd - Imotski (HR) – Posušje – Tomislavgrad –Novi Travnik with branch to Mostar (BiH))

CESEC Gas Plenary MeetingBrussels, 8 October 2019

Page 2: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA

✔ Prefeasibility Study for South Interconnection of BiH and Croatia, October 2013, financed by WBIF✔ CBA South Interconnection of BiH and Croatia, May 2018, financed by CONNECTA

-No connection between HR and BiH

-3 planned interconnections, the most mature one is Southern Interconnection - connection to IAP project

-DN 500/75 bar, L 187 km (239 km scenario without IAP); -Capacity up to 1,5 bcm/y-Planned commissioning 2024-Project is of strategic importance for BiH; BiH depends onone entry point-Possibility of reverse flow-PMI project (PMI GAS 03), -TYNDP 2018, submitted for TYNDP 2020-Next step: Open Season HR Source: CBA South Interconnection of BiH and Croatia

Project Promoters: BH-Gas Sarajevo, BiH/Plinacro Zagreb, HR

Page 3: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

BH Section Status: TRA-N-851

Diameter/ Length: 500 mm / 75 bar / 165 km / bidirectionalEntry/ Exit Capacity: 73 / 38 GWh/dCAPEX: approx. EUR 100 mil

- Provides diversification of sources and routes for BiH supply, currently depending onone source and route (Russia through Ukraine), currently N-1=0. Project connects theexisting BiH with Croatian gas system and enables supply of BiH from SGC, LNG (Krk)and West European gas market.- Strategic importance of this project proclaimed by the Conclusion of the Governmentof the Federation of BiH in June 2018.

NDP adopted in Aug 2018: Framework Energy Strategy of BiH until2035PMI project (PMI GAS 03)

Preliminary Design ongoing, started in Aug 2019, planned issuingAug 2020FS and ESIA, Grant approved, planned Nov 2019 – Aug 2020Detailed Design, planned Jan 2021-Jan 2022

Planned Permitting Timeline:Environmental Permit Aug 2020Location Permit Oct 2020Building Permit Apr 2022

Commissioning: Oct 2024

Page 4: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

Croatian section status (TRA-N-302)

•Croatian section: Zagvozd-Imotski-HR/BiHborder

•DN 500/75 bar, L 22 km

•Up to 1,5 bcm/y•ESIA ✔•Basic Design ✔

•Location Permit ✔•Detailed Design 2021•Building Permit 2022

•Commissioning 2024

•CAPEX – EUR 16 mil

Possible source of gas:- via existing interconnections HR-SLO and HR-HU- planned projects: LNG Krk and Ionian-Adriatic Pipeline

Page 5: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

IAP section

Project is linked to the IAP Gaspipeline. In case that IAP implementation will be postponed, additional 54 km at the Croatian side sholud be constructed. Split (Dugopolje) – Zagvozd

- DN 800/75 bar, L 52 km

- EUR 48 million

- ESIA, Basic Design, Location Permit, Detailed Design✔

-Building Permit:

-1st phase Gas Node Dugopolje ✔

- 2nd phase pipeline Dugopolje-Zagvozd – in process of obtaining

Croatian sections in total – EUR 64 million (74 km)To continue the project implementation it is necessary to obtain:- positive feedback from the Open Season procedure- an EU grant

Page 6: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October

SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND HERZEGOVINA

Source: CBA South Interconnection of BiH and Croatia

Page 7: SOUTHERN INTERCONNECTION CROATIA – BOSNIA AND … · SOUTHERN INTERCONNECTION HR - BOSNIA & HERZEGOVINA Prefeasibility Study for South Interconnection of BiH and Croatia, October