southern gateway project
TRANSCRIPT
![Page 1: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/1.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Southern Gateway
Project
Community Meeting Wednesday, June 20, 2018
Thurgood Marshall Recreation Center
DISTRICT 3
![Page 2: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/2.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Project Team
2
![Page 3: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/3.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Need for Roadway Improvements
3
• Highway & bridge structures were built in the 50’s
• Aging Pavement
I-35E Main Lanes
I-35E HOV Lanes at Illinois Ave.
![Page 4: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/4.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Need for Roadway Improvements
4
• Growing congestion due to increasing populations and usage
• Approx. 218,000 vehicles per day
![Page 5: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/5.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Southern Gateway - Purpose and Need
§ Congestion Relief
– Increased Capacity
§ Improve Safety
– Address Existing Design Deficiencies
§ Improve Area Mobility
§ Improve System Linkage
5
![Page 6: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/6.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Project Overview
6
• Project Cost: $666M
• Design-Build (Method to Deliver Construction)
• Timeframe for Construction: 2018-2021
• Non-tolled
![Page 7: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/7.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Project Limits
7
• Total Project Length: 11-miles
• Project is broken up into two segments
• Segment 1 limits: I-35E from Colorado Blvd. to the I-35E/U.S. 67 Split
• Segment 2 limits: U.S. 67 from the I-35E/U.S. 67 Split to I-20
![Page 8: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/8.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Segment 1 – Existing Lanes vs. Proposed Lanes
8
![Page 9: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/9.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Segment 2 – Existing Lanes vs. Proposed Lanes
9
![Page 10: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/10.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Southern Gateway Project - US 67 Improvements
10
§ Proposed NB US 67 Exit Ramp to Camp Wisdom Rd and Proposed Left Turn Lane
![Page 11: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/11.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Southern Gateway Project - US 67 Improvements
11
§ Proposed Reversible Express Lane Entrance and Exit allows access to and from Camp Wisdom Rd.
![Page 12: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/12.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
2018 Construction Milestones
12
• Feb. 2018 – Project Groundbreaking
• March 2018 – HOV Lanes Long-term Closure
• June 2018 – 8th Street Overpass Long-Term Closure
• Summer 2018 – Begin Construction at Other Cross Streets
Ø Beckley Avenue
Ø Brookhaven Drive
Ø Ewing Avenue
Ø Marsalis Avenue
• Fall 2018-2020 – Series of traffic shifts
• Late 2021 – Full project completion
![Page 13: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/13.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
HOV Lanes Construction
13
§ Will serve all vehicles
§ Non-Tolled Express Lanes Operation
§ Reversible
§ Along I-35E – Express Lanes will have 2 lanes and
reversible
§ Along U.S. 67 – Express Lane will have 1 lane and
reversible
Proposed: “Non-Tolled Express Lanes”
• Long-Term Closure: Started March 30
• Lasts entire project duration (will re-open late 2021)
![Page 14: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/14.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
8th Street Bridge Construction
14
• 8th Street Overpass at I-35E Closed June 4, 2018
• Long-term closure for six months
• Detours will be through Colorado
Boulevard and 10th Street
• First bridge to begin reconstruction along the project
![Page 15: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/15.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Other Types of Construction Along Project
15
• Utility relocations
• I-35E main lane reconstruction and repaving
• Building new lanes along both I-35E & U.S. 67
• Local enhancements - Deck Plaza structure (managed by City of Dallas)
• Add U-turns, Bike, Pedestrian Access & Wider Shoulders on cross streets
• Soundwall Construction
![Page 16: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/16.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Connect with Us!
16
Project Website: www.thesoutherngateway.org
Email: [email protected]
![Page 17: Southern Gateway Project](https://reader031.vdocuments.mx/reader031/viewer/2022012101/6169f32f11a7b741a34d2a03/html5/thumbnails/17.jpg)
The Southern Gateway Project Wednesday, June 20, 2018
Connect with Us!
17
Sign up to receive Text Alerts Text “The Southern Gateway” to 31996
Like Us on Facebook Search for our page name: The Southern Gateway
Follow Us on Twitter @DriveTSG
Call our Hotline (214) 349-6493
Visit our Project Storefront 160 Continental Ave. Dallas, TX 75207