BUILDING STRONG ® Southern California Water Dialogue Ed T. de Mesa Chief, Plan Formulation Branch Planning Division Los Angeles District US Army Corps of Engineers 26 October 2011

Upload: ezhno

Post on 22-Feb-2016

50 views

Category:

Documents


0 download

DESCRIPTION

26 October 2011. Southern California Water Dialogue. Ed T. de Mesa Chief, Plan Formulation Branch Planning Division Los Angeles District US Army Corps of Engineers. Dam Reoperation Capabilities. Prado San Antonio Seven Oaks Coyote Carbon Fullerton Brea. Whittier Narrows - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Southern California Water Dialogue

BUILDING STRONG®

Southern California Water Dialogue

Ed T. de MesaChief, Plan Formulation BranchPlanning DivisionLos Angeles DistrictUS Army Corps of Engineers

26 October 2011

Page 2: Southern California Water Dialogue

BUILDING STRONG®

Dam Reoperation Capabilities Prado San Antonio Seven Oaks Coyote Carbon Fullerton Brea

2

Whittier Narrows Hansen Lopez Sepulveda Santa Fe Mojave River

Page 3: Southern California Water Dialogue

BUILDING STRONG®

Whittier Narrows Dam

3

Page 4: Southern California Water Dialogue

BUILDING STRONG®4

Prado Dam

Page 5: Southern California Water Dialogue

BUILDING STRONG®

Seven Oaks Dam

5

Page 6: Southern California Water Dialogue

BUILDING STRONG®

Dam Reoperation Possibilities

Prado Seven Oaks San Antonio Coyote Carbon Fullerton Brea

6

Whittier Narrows Hansen Lopez Sepulveda Santa Fe Mojave River

Page 7: Southern California Water Dialogue

BUILDING STRONG®

How Do We Do It? Review of Completed Corps Project –review current

conditions and make recommendation for corrections and improvements, which could include water conservation.

Project Authorization included a water conservation purpose or through subsequent legislation.

Water Supply Act of 1958, allows the Chief of Engineers to conduct studies to add water supply as additional purpose to completed projects.

7

Page 8: Southern California Water Dialogue

BUILDING STRONG®

How Do We Get Started? Conduct a cost-shared feasibility study with non-

Federal sponsors

Letter of Interest addressed to COL Toy and the Los Angeles District would initiate the budgetary process

Collectively pursue study funds

Implementation and operation costs are 100% Non-Federal responsibility

8

Page 9: Southern California Water Dialogue

BUILDING STRONG®

Thank You!Contact Information

9

Ed T. de MesaChief, Plan Formulation Branch

Planning DivisionLos Angeles District

US Army Corps of Engineers

Tel : 213-452-3820