SOUTHEAST BUS TERMINAL FACILITY PROJECT SHEET 7200 Bluff Springs Rd. Austin, TX 78744 Building Area: 25,315 Square Feet Site: 22 Acres Date of First Construction: 2014 About the Campus The Southeast Bus Terminal was built as part of the 2004 Bond Program. It relieved congestion from the district’s other bus terminals and reduced travel distance for buses serving southeast Austin. It includes an administration building, a maintenance building, parking spaces and a fueling station. For more detailed information about the district’s long-term Facility Master Plan and recommendations for this facility, please visit www.aisdfuture.com. Proposed Projects Districtwide Fire and Intrusion Alarm Upgrades Districtwide Security Camera Replacements Safety Improvements Technology: Network System Improvements Facility Condition Assessment (FCA) This Facility District Average - Special Facility 95 62 Fail < 30 Poor 30 - 49 Average 50 - 69 Good 70 - 89 Excellent 90 - 100 Estimated Cost of Proposed Projects $118,000 Projects may include funding from additional sources. 6/26/17

Upload: others

Post on 20-Feb-2022

27 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTHEAST BUS TERMINAL FACILITY PROJECT SHEET

SOUTHEAST BUS TERMINALFACILITY PROJECT SHEET

7200 Bluff Springs Rd.Austin, TX 78744

Building Area: 25,315 Square FeetSite: 22 AcresDate of First Construction: 2014

About the CampusThe Southeast Bus Terminal was built as part of the 2004 Bond Program. It relieved congestion from the district’s other bus terminals and reduced travel distance for buses serving southeast Austin. It includes an administration building, a maintenance building, parking spaces and a fueling station.

For more detailed information about the district’s long-term Facility Master Plan and recommendations for this facility,

please visit www.aisdfuture.com.

Proposed Projects

• Districtwide Fire and Intrusion Alarm Upgrades

• Districtwide Security Camera Replacements

• Safety Improvements

• Technology: Network System Improvements

Facility Condition Assessment (FCA) This Facility District Average - Special Facility

95 62Fail < 30

Poor 30 - 49

Average 50 - 69

Good 70 - 89

Excellent 90 - 100

Estimated Cost of Proposed Projects

$118,000

Projects may include funding from additional sources.

6/26/17