south waterfront schnitzer campus · south waterfront schnitzer campus . 2017 master plan. future...

1
TIMELINE 2006 2015 2015 South Waterfront Schnitzer Campus South Waterfront Portland Aerial Tram Tilikum Crossing South Waterfront Greenway SCB4 SCB6 SCB7 SCB8 SCB9 SCB5 connects to parking garage below KCRB increase in parking access off of Moody Ave primary parking and front door dependent upon Arthur St and Promenade compleon large site on the river substanal increase in parking connects to tunnel new loading dock primary parking access dependent upon Sheridan St compleon campus commons on the river increase in parking & bike storage connects to tunnel primary front door dependent upon Promenade & Arthur St compleon parking garage connects to CLSB connects to tunnel on the river adjacent to Tilikum Crossing primary front door dependent upon Promenade & Bond Ave. compleon on the river minimal street frontage small site primary front door dependent upon Bond Ave. compleon provides urban pedestrian connecon to the west connects to tunnel & loading dock houses CUP & support space access off of Moody dependent upon Sheridan St compleon CAMPUS PLANNING & REAL ESTATE SOUTH WATERFRONT SCHNITZER CAMPUS 2017 MASTER PLAN Future Build-Out Perspective Rendering South Waterfront Context Map OHSU’s South Waterfront Schnitzer Campus Master Plan was developed as part of an internal process to understand the development potenal as it relates to block size, site access, regulatory frameworks, and other condions. These materials do not reflect approved projects, and are used to help inform ongoing planning processes. & HEALING 2 (CHH2) SW MACADAM AVE SW RIVER PARKWAY SW WHITAKER ST SW BOND AVE SW GAINES ST SW MOODY AVE SW BOND AVE MEADE ARTHUR SHERIDAN PROMENADE I - 5 SW CURRY ST KELLY HOOD URRY WHITAKER GIBBS CORBETT CT KELLY SW KELLY WAY I - 5 HOOD SW MOODY AVE. ROSS ISLAND BRIDGE I-5 GAINES ELLY TILIKUM CROSSING KRCB SCB- 4 SCB- 5 SCB- 6 SCB- 7 OHSU COMMONS SCB- 8 SCB- 9 Kni ght Cancer Research Bui ldi ng RLSB MDY 3030 Moody Robertson Coll aborave Life Sci ences Bui lding CHH1 Center for Heal th & Heal ing CHH2 26B Bl ock 33 Bl ock 23 Bl ock 27 Center for 26BW CUP TRAM Heal th & Heal ing RPV Rood Famil y Pavilion OHSU SOUTH WATERFRONT SCHNITZER CAMPUS OHSU SOUTH WATERFRONT CENTRAL DISTRICT ROBERTSON COLLABORATIVE LIFE SCIENCES BUILDING KNIGHT CANCER RESEARCH BUILDING SCB4 SCB5 SCB6 SCB7 SCB8 SCB9 SW ARTHUR ST SW SHERIDAN ST MARQUAM BRIDGE (I-5) SW MEADE ST SW BOND AVE SCB9 KCRB SCB4 SCB5 SCB6 SCB7 SCB8 RLSB SW MOODY AVE TILIKUM CROSSING COMMONS 2018 2014 2002 Knight Cancer Research Building Robertson Collaborave Life Sciences Building Schnitzer Investment Corporaon land donaon FLOOR AREA RATIO (FAR) MAXIMUM HEIGHT 9:1 MAX 6:1 OVERLAY 4:1 BASE 325’ MAX 250’ OVERLAY 75’ 125’ 250’ MAX 125’ OVERLAY 75’ 125’ 9:1 MAX 6:1 OVERLAY 4:1 BASE SCB4 Lot Area: 48,830 SF Base + Overlay FAR: 292,980 GSF Max FAR: 439,470 GSF SCB5 Lot Area: 76,070 SF Base + Overlay FAR: 456,420 GSF Max FAR: 684,630 GSF SCB6 Lot Area: 91,750 SF Base + Overlay FAR: 550,500 GSF Max FAR: 825,750 GSF SCB7 Lot Area: 71,550 SF Base + Overlay FAR: 429,300 GSF Max FAR: 643,950 GSF SCB8 Lot Area: 36,053 SF Base + Overlay FAR: 216,318 GSF Max FAR: 324,477 GSF SCB9 Lot Area: 47,505 SF Base + Overlay FAR: 285,030 GSF Max FAR: 427,545 GSF SCB4 SCB5 SCB6 SCB7 SCB8 SCB9

Upload: others

Post on 17-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTH WATERFRONT SCHNITZER CAMPUS · SOUTH WATERFRONT SCHNITZER CAMPUS . 2017 MASTER PLAN. Future Build-Out Perspective Rendering South Waterfront Context Map. OHSU’s South Waterfront

TIMELINE

2006 20152015

South Waterfront Schnitzer CampusSouth Waterfront

Portland Aerial Tram

Tilikum Crossing

South Waterfront Greenway

SCB4 SCB6 SCB7 SCB8 SCB9SCB5

connects to parking garage below KCRB

increase in parking

access off of Moody Ave

primary parking and front door dependent upon Arthur St and Promenade completion

large site

on the river

substantial increase in parking

connects to tunnel

new loading dock

primary parking access dependent upon Sheridan St completion

campus commons on the river

increase in parking & bike storage

connects to tunnel

primary front door dependent upon Promenade & Arthur St completion

parking garage connects to CLSB

connects to tunnel

on the river

adjacent to Tilikum Crossing

primary front door dependent upon Promenade & Bond Ave. completion

on the river

minimal street frontage

small site

primary front door dependent upon Bond Ave. completion

provides urban pedestrian connection to the west

connects to tunnel & loading dock

houses CUP & support space

access off of Moody

dependent upon Sheridan St completion

CAMPUS PLANNING & REAL ESTATE

SOUTH WATERFRONT SCHNITZER CAMPUS 2017 MASTER PLAN

Future Bui ld-Out Perspect ive Render ing South Waterfront Context Map

OHSU’s South Waterfront Schnitzer Campus Master Plan was developed as part of an internal process to understand the development potential as it relates to block size, site access, regulatory frameworks, and other conditions. These materials do not reflect approved projects, and are used to help inform ongoing planning processes.

& HEALING 2 (CHH2)SW M

AC

AD

AM

AV

E

SW

RIV

ER

PA

RK

WA

YSW WHITAKER ST

SW B

ON

D A

VE

SW GAINES ST

SW M

OO

DY

AVE

SW BO

ND

AVE

MEADE

ARTHUR

SHERIDAN

PROM

ENA

DE

WI

LL

AM

ET

TE

R

IV

ER

I -

5

SW CURRY ST

CO

RB

ETT

KEL

LY HO

OD

CURRY

WHITAKER

GIBBS

CO

RB

ETT

CTK

ELL

YSW

KELLY

WA

Y

ISLAND WAY

I - 5HO

OD

WA

TER

SW WOODS ST

ARTHUR

KELLY

SW M

OO

DY AV

E.

ROSS ISLAND BRIDGE

I-5

LANE

GAINES

CO

RB

ETT

KEL

LY

MARQUAM BRIDGE

TILIKUM CROSSIN

G

KRCB

SCB-4

SCB-5

SCB-6

SCB-7

OHSU COMMONS

SCB-8

SCB-9

Knight Cancer

Research Building

RLSB

MDY3030

Moody

Robertson

Collaborative Life

Sciences Building

CHH1Center for

Health & Healing

CHH226B

Block 33

Block 23

Block 27

Center for 26BW

CUP

TRAM

Health & Healing

RPVRood Family

Pavilion

OHSU SOUTH WATERFRONT SCHNITZER CAMPUS

OHSUSOUTH WATERFRONT CENTRAL DISTRICT

ROBERTSON COLLABORATIVE LIFE

SCIENCES BUILDING

KNIGHT CANCER RESEARCH BUILDING

SCB4

SCB5

SCB6

SCB7

SCB8

SCB9

SW ARTHUR ST

SW SHERIDAN STMARQUAM BRIDGE (I-5)

SW MEADE ST

SW BOND AVE

SCB9

KCRB

SCB4

SCB5SCB6

SCB7

SCB8RLSB

SW M

OO

DY

AVE

TILIKUM CROSSING

COMMONS

201820142002Knight Cancer Research Building

Robertson Collaborative Life Sciences Building

Schnitzer Investment Corporation land donation

FLOOR AREA RATIO (FAR) MAXIMUM HEIGHT

9:1 MAX

6:1 OVERLAY

4:1 BASE

325’ MAX

250’ OVERLAY 75’

125’

250’ MAX

125’ OVERLAY 75’

125’

9:1 MAX

6:1 OVERLAY

4:1 BASE

SCB4 Lot Area: 48,830 SFBase + Overlay FAR: 292,980 GSFMax FAR: 439,470 GSF

SCB5 Lot Area: 76,070 SFBase + Overlay FAR: 456,420 GSFMax FAR: 684,630 GSF

SCB6 Lot Area: 91,750 SFBase + Overlay FAR: 550,500 GSFMax FAR: 825,750 GSF SCB7 Lot Area: 71,550 SFBase + Overlay FAR: 429,300 GSFMax FAR: 643,950 GSF

SCB8 Lot Area: 36,053 SFBase + Overlay FAR: 216,318 GSFMax FAR: 324,477 GSF

SCB9 Lot Area: 47,505 SFBase + Overlay FAR: 285,030 GSFMax FAR: 427,545 GSF

SCB4 SCB5

SCB6 SCB7SCB8SCB9