A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream RestorationContract No. CN15402011Project No. WW-000024-002
Mason District
December 15, 2015
![Page 2: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/2.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream RestorationPost Construction
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
![Page 3: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/3.jpg)
Project DetailsS. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Project Overview:• Installation of 1000 feet of emergency bypass pumping• Replacement of approximately 120-feet of 20-inch DIP sewer pipe• Installation of large boulder riffle core and placement of surrounding class III riprap• Stream bank restoration
Project Team:• Utilities Design and Construction Division – Brendan Schillo, Jennifer Arias• Wastewater Collection Division – Bobby White, Jonathan Okafor• Stormwater Planning – Justin Pistore
Description:The S. Van Dorn Sanitary Sewer Emergency Replacement and Stream RestorationProject consisted of the emergency replacement of a ruptured sanitary sewer that crosses Backlick Run. To protect the new pipe crossing, an environmentally friendly approach was implemented using large boulder riffle core surrounded by class III riprap. Additional riprap was used to restore the eroding stream banks of this section of Backlick Run. This project was substantially completed on November 6, 2015.
![Page 4: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/4.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Mason District – Tax Map No. 81-1 and 81-2
![Page 5: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/5.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Emergency Sewer Bypass Pumping System
![Page 6: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/6.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Installation of Stream Bypass Culvert
![Page 7: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/7.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Removal of Broken Sanitary Sewer Pipe
![Page 8: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/8.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Installation of Boulder Riffle Core Pipe Protection
![Page 9: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/9.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Sewer Pipe Installation and Concrete Encasement
![Page 10: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/10.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Protection of Stream Bank with Class III Rip Rap
![Page 11: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/11.jpg)
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Finished Product with Stream Flow
![Page 12: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/12.jpg)
Before After
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
![Page 13: South Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration January 2016](https://reader036.vdocuments.mx/reader036/viewer/2022070521/58f057851a28ab820f8b4629/html5/thumbnails/13.jpg)
Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
S. Van Dorn Sanitary Sewer Emergency Replacement and Stream Restoration
Capital Facilities/Utilities Design and Construction Division/Wastewater Design and Construction Branch
Irene Haske Public Information Officer
703-324-5821, TTY [email protected]