south sudan - upper nile state, maban county … drc acted unhcr sub-office unmiss save the children...

1
MSF DRC ACTED UNHCR Sub-Office UNMISS Save the Children LWF IMC DRC site management office UNHCR field office Kukuli Darfur 1 & 2 Samari 3 Chali 2 Mayak 1 Samari 2 Chali 1 Mugum Dindiro Balila Dawala Samari 1 Soda Benamayu 1 Wego Anyile Yabus Dereng Jindi Kilgo Borfa Jabel Morufa Kernkan Mayak 3 Benamayu 2 Jeigo Wadaga Belatuma Baldugu Agadi Tongo Kolnugura Bee Samari 4 Surkum Mayak 2 Zariba Balila Gabanite Zone A Zone C Zone B PEN TS01 BEL TS01 BEL TS02 IMC Balila BEL TS08 BEL TS10 BEL TS05 BEL TS07 BEL TS06 BEL TS11 BEL TS12 BEL TS13 BEL TS14 PDI TS03 PDI TS04 BELA TS02 BAL TS04 BAL TS02 BAL TS03 CHA1 TS01 CHA1 TS07 CHA1 TS03 CHA1 TS08 MSF Clinic Jamuhuri Primary School MK TS02 MK TS03 IMC MK TS05 JD TS01 PDM II TS01 PDII TS04 Daresalam Primary school SAM4 TS03 SAM4 TS04 PEN TS02 PEN TS03 PEN TS05 PEN TS04 SAM4 TS02 SAM4 TS06 Samari Primary school SAN4 TS05 SAM4 TS08 SAM4 TS09 SAM4 TS10 DE TS02 DE TS03 DE TS04 DE TS05 CHA1 TS02 DE TS06 BEL TS03 Balila Primary School BEL TS03 BEL TS01 BEL TS04 BEL TS02 BAL TS01` SD TS02 SD TS03 SD TS09 JIN TS01 JD TS05 PDII TS06 Unity primary school BEL TS04 MK TS04 Zeriba HP 2 Zeriba HP 1 Tongo HP Samari HP 1 Nuba HP Jumjum/ Wadaga HP Jindi way station HP Jindi HP Ingassana Chali 2 HP Chali 1 HP Bee HP DE Hand pump For Humanitarian Purposes Only Production date: 24 November 2017 SOUTH SUDAN - Upper Nile State, Maban County Doro Refugee Camp - Water Access - As of 28 Septembert 2017 Administration Water distribution type ! \ Maban Upper Nile Juba Roads: PAE (2015) Infrastructure: REACH (2017) Satellite Imagery:Pléiades from 11 November 2017 Copyright: ©CNES 2017 Distribution: Airbus DS Contact: [email protected]

Upload: vuhuong

Post on 14-Apr-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SOUTH SUDAN - Upper Nile State, Maban County … DRC ACTED UNHCR Sub-Office UNMISS Save the Children LWF IMC DRC site management office UNHCR field office Kukuli Darfur 1 & 2 Samari

MSF

DRC

ACTED

UNHCRSub-Office

UNMISS

Save the ChildrenLWF

IMC

DRC site management office

UNHCR fieldoffice

Kukuli

Darfur 1 & 2

Samari 3

Chali 2

Mayak 1

Samari 2

Chali 1Mugum

Dindiro

Balila Dawala

Samari 1

Soda

Benamayu 1

Wego

Anyile

Yabus

DerengJindi

Kilgo

Borfa

Jabel MorufaKernkan

Mayak 3

Benamayu 2

Jeigo

Wadaga

Belatuma

Baldugu

Agadi

Tongo

Kolnugura

Bee

Samari 4

Surkum

Mayak 2

Zariba

Balila

Gabanite

Zone AZone C

Zone B

PENTS01

BEL TS01

BEL TS02

IMC Balila

BEL TS08

BEL TS10

BEL TS05

BEL TS07

BEL TS06

BEL TS11

BEL TS12

BEL TS13 BEL

TS14

PDI TS03

PDI TS04

BELA TS02

BAL TS04

BALTS02

BAL TS03

CHA1 TS01

CHA1 TS07

CHA1 TS03

CHA1 TS08

MSF Clinic

JamuhuriPrimary School

MKTS02

MK TS03

IMC

MK TS05

JD TS01

PDM II TS01

PDII TS04

Daresalam Primary school

SAM4 TS03

SAM4 TS04

PEN TS02

PEN TS03PEN

TS05

PENTS04

SAM4 TS02

SAM4 TS06

SamariPrimary school

SAN4 TS05

SAM4TS08

SAM4 TS09

SAM4 TS10

DE TS02

DE TS03

DE TS04

DE TS05

CHA1 TS02

DE TS06BEL TS03

BalilaPrimary School

BEL TS03

BEL TS01

BEL TS04

BEL TS02

BAL TS01`

SD TS02

SD TS03 SD

TS09

JIN TS01

JD TS05 PDII

TS06Unity

primary school

BEL TS04

MK TS04

Zeriba HP 2

Zeriba HP 1

Tongo HP

Samari HP 1

Nuba HP

Jumjum/Wadaga HP

Jindi waystation HP

Jindi HP

Ingassana

Chali 2 HP

Chali 1 HP

Bee HP

DE

Hand pump

For Humanitarian Purposes OnlyProduction date: 24 November 2017SOUTH SUDAN - Upper Nile State, Maban County

Doro Refugee Camp - Water Access - As of 28 Septembert 2017

AdministrationU NHCR field office (3)

NGO office (6)

Site m anagem ent office (1)

Water distribution typeHandpum p (22)

Tapstand – Com m unity (82)

Tapstand – Institution (8)

Main road

Main road200 m eters from functioningwater point (Sphere) (1)

Cam p boundary

!\

MabanUpperNile

Juba

CAR

Ethiopia

Kenya

Sudan

U gandaDRC

0 10.5k m

1:21,000Scale for A3 -

Roads: PAE (2015)Infrastructure: REACH (2017)Satellite Imagery:Pléiades from 11 November 2017Copyright: ©CNES 2017Distribution: Airbus DSContact: [email protected]

Note: Data, designations and boundaries contained on this m ap are not warranted to be error-free and do not im ply acceptance by the REACH partners, associates, donors m entioned on this m ap.

File: REACH_SSD_MAP_U NHCR_DoroCam p_WaterAccess_28SEP17