south road upgrade: croydon overpass clg workshop no. 2 ...€¦ · clg meeting no. 1: start-up and...

19
South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 Initial Design Precedents ASPECT Studios Pty Ltd ABN 11 120 219 561

Upload: others

Post on 13-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

South Road Upgrade: Croydon Overpass

CLG WORKSHOP No. 2Initial Design Precedents

ASPECT Studios Pty Ltd ABN 11 120 219 561

Page 2: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Program

CROYDON OVERPASS CONCEPT DEVELOPMENT PROGRAMPrepared by ASPECT Studios

Weekly Programme Week 1

Week 2

Week 3

Week 4

Week 5 Week 6 Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

Week 23

Week 24

TASK

STAGE 1: Site Assessment and Design Principles

Stage Duration 9 Weeks

CLG Meeting No. 1: Start-up and opportunities workshopDevelop initial benchmarking/ precedent studyCLG Meeting No. 2: Benchmarking/ Precedents Review 11.09.13Prepare site assessment and draft urban design principlesCLG Meeting No. 3: Design Principles Workshop 02.10.13Refine design principles and prepare Community Day materialsCLG Meeting No. 4: Review Community Day Materials 22.10.13Community Day (Saturday in the Park) 26.10.13

STAGE 2: Design

Stage Duration 6 Weeks

Collate feedback from Community DayPrepare preliminary design optionsCLG Meeting No. 5: Review Preliminary Concepts 20.11.13Refine design optionsCLG Meeting No. 6: Review Refined Concepts 11.12.13Prepare Community Day materials ChristmasCommunity Day (4.30 - 6.30 in the Park) 29.01.14

KeyStage durationCLG Meeting Work periodCommunity Day

21.08.13

Page 3: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Program

CROYDON OVERPASS CONCEPT DEVELOPMENT PROGRAMPrepared by ASPECT Studios

Weekly Programme Week 1

Week 2

Week 3

Week 4

Week 5 Week 6 Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

Week 23

Week 24

TASK

STAGE 1: Site Assessment and Design Principles

Stage Duration 9 Weeks

CLG Meeting No. 1: Start-up and opportunities workshopDevelop initial benchmarking/ precedent studyCLG Meeting No. 2: Benchmarking/ Precedents Review 11.09.13Prepare site assessment and draft urban design principlesCLG Meeting No. 3: Design Principles Workshop 02.10.13Refine design principles and prepare Community Day materialsCLG Meeting No. 4: Review Community Day Materials 22.10.13Community Day (Saturday in the Park) 26.10.13

STAGE 2: Design

Stage Duration 6 Weeks

Collate feedback from Community DayPrepare preliminary design optionsCLG Meeting No. 5: Review Preliminary Concepts 20.11.13Refine design optionsCLG Meeting No. 6: Review Refined Concepts 11.12.13Prepare Community Day materials ChristmasCommunity Day (4.30 - 6.30 in the Park) 29.01.14

KeyStage durationCLG Meeting Work periodCommunity Day

21.08.13

Page 4: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Program

CROYDON OVERPASS CONCEPT DEVELOPMENT PROGRAMPrepared by ASPECT Studios

Weekly Programme Week 1

Week 2

Week 3

Week 4

Week 5 Week 6 Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

Week 23

Week 24

TASK

STAGE 1: Site Assessment and Design Principles

Stage Duration 9 Weeks

CLG Meeting No. 1: Start-up and opportunities workshopDevelop initial benchmarking/ precedent studyCLG Meeting No. 2: Benchmarking/ Precedents Review 11.09.13Prepare site assessment and draft urban design principlesCLG Meeting No. 3: Design Principles Workshop 02.10.13Refine design principles and prepare Community Day materialsCLG Meeting No. 4: Review Community Day Materials 22.10.13Community Day (Saturday in the Park) 26.10.13

STAGE 2: Design

Stage Duration 6 Weeks

Collate feedback from Community DayPrepare preliminary design optionsCLG Meeting No. 5: Review Preliminary Concepts 20.11.13Refine design optionsCLG Meeting No. 6: Review Refined Concepts 11.12.13Prepare Community Day materials ChristmasCommunity Day (4.30 - 6.30 in the Park) 29.01.14

KeyStage durationCLG Meeting Work periodCommunity Day

21.08.13

CROYDON OVERPASS CONCEPT DEVELOPMENT PROGRAMPrepared by ASPECT Studios

Weekly Programme Week 1

Week 2

Week 3

Week 4

Week 5 Week 6 Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

Week 23

Week 24

TASK

STAGE 1: Site Assessment and Design Principles

Stage Duration 9 Weeks

CLG Meeting No. 1: Start-up and opportunities workshopDevelop initial benchmarking/ precedent studyCLG Meeting No. 2: Benchmarking/ Precedents Review 11.09.13Prepare site assessment and draft urban design principlesCLG Meeting No. 3: Design Principles Workshop 02.10.13Refine design principles and prepare Community Day materialsCLG Meeting No. 4: Review Community Day Materials 22.10.13Community Day (Saturday in the Park) 26.10.13

STAGE 2: Design

Stage Duration 6 Weeks

Collate feedback from Community DayPrepare preliminary design optionsCLG Meeting No. 5: Review Preliminary Concepts 20.11.13Refine design optionsCLG Meeting No. 6: Review Refined Concepts 11.12.13Prepare Community Day materials ChristmasCommunity Day (4.30 - 6.30 in the Park) 29.01.14

KeyStage durationCLG Meeting Work periodCommunity Day

21.08.13

CROYDON OVERPASS CONCEPT DEVELOPMENT PROGRAMPrepared by ASPECT Studios

Weekly Programme Week 1

Week 2

Week 3

Week 4

Week 5 Week 6 Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Week 13

Week 14

Week 15

Week 16

Week 17

Week 18

Week 19

Week 20

Week 21

Week 22

Week 23

Week 24

TASK

STAGE 1: Site Assessment and Design Principles

Stage Duration 9 Weeks

CLG Meeting No. 1: Start-up and opportunities workshopDevelop initial benchmarking/ precedent studyCLG Meeting No. 2: Benchmarking/ Precedents Review 11.09.13Prepare site assessment and draft urban design principlesCLG Meeting No. 3: Design Principles Workshop 02.10.13Refine design principles and prepare Community Day materialsCLG Meeting No. 4: Review Community Day Materials 22.10.13Community Day (Saturday in the Park) 26.10.13

STAGE 2: Design

Stage Duration 6 Weeks

Collate feedback from Community DayPrepare preliminary design optionsCLG Meeting No. 5: Review Preliminary Concepts 20.11.13Refine design optionsCLG Meeting No. 6: Review Refined Concepts 11.12.13Prepare Community Day materials ChristmasCommunity Day (4.30 - 6.30 in the Park) 29.01.14

KeyStage durationCLG Meeting Work periodCommunity Day

21.08.13

Page 5: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Issues

Structure: - Visual obstruction - Graffiti

Open Space: - Noise from activities + traffic

- Traffic from activities

- Connect to Elizabeth / Queen Street

- Holistic design

- Safety + security + good lighting

- Who is going to own + maintain

- Connectivity to cyclists + pedestrians across South Road too

- Improvements to traffic flow

- Loss of trees

Page 6: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Opportunities

Structure: - Vertical gardens- Art / Mosaics- Less concrete- Open vs. covered- Community building - bricks

- Solar / pv

Other Opportunities:- Greenway Shared Path - Overhead - At grade - Attached to bridge

- Separate from bridge

Open Space Emerging Themes: Green Space: Croydon Linear Park- Community gardens- Greenspace- Restrict parking- BBQ / Playspace / older kids- Dog friendly- Walkways- Shared street between play + station- Sporting facilities

- Outdoor gym

Cultural Space: Croydon Culture Park- Wi-fi areas- Art / Mosaics- Street art- Pop-up shops / Deli / Kiosk- Meeting + social spaces- Recognise cultural heritage

Material preferences- Less concrete- Underground powerlines- Community building (bricks)- Robust design - sustainability + maintainable- Pick up character - wrought iron, bricks, sandstone,bluestone- Salvage history from, acquired houses - reuse materials

Page 7: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Bridge Design (Federation Era 1890-1910)

Alexandra Bridge, Canada (Completed 1900) Pyrmont Bridge, Sydney (Completed 1902)

Perryville Railroad Bridge, USA (Completed 1910)LeGore Bridge, USA (Completed 1900)Battersea Bridge, UK (Completed 1890)

Page 8: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Contemporary Bridge Design

Aflenzbrücke bridge project in the small Austrian village of Lorüns by Marte.Marte Architekten

The Foothills Basket Bridge (America) by Andrew Leicester Reggio Emila Bridge by Santiago Calatrava

Page 9: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Contemporary Bridge Design - Lightweight Structure

Castleford Bridge, UK (Completed 2008) Peace Bridge, Calgary, Canada (Completed 2012)

Muehlheimer Hafen Footbridge,Germany

Cragieburn Bypass, Melbourne (Completed 2005)Infinity Bridge, UK (Completed 2008)

Page 10: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Contemporary Bridge Design - Lightweight Structure

Point Resolution Bridge, New Zealand by Warren and Mahoney

Page 11: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Bridge Wall/ Facade Design Opportunities

Street Art Installation Art

Vertical Gardens Public Art Opportunities

Name: Pont Max Juvenal (Vertical Garden on A Bridge)Designer: Patrick BlancLocation: Aix en Provence, France

Name: Bird Life MuralArtist: RoaLocation: Vienna, Austria

Name: Poured LinesArtist: Ian DavenportLocation: Southwark St, London, UK

Name: Art In Transit (Brick Cladding to Bridge Supports)Artist: Andrew LeicesterLocation: Charlotte, North Carolina, USA

Name: Floating Baloon GirlArtist: BanksyLocation: West bank, Israel

Project Details:• Vertical garden applied to an existing concrete

bridge

• The garden is composed of a metal frame, a vinyl polymer to waterproof the structure and a layer of felt where the roots grow

Page 12: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Open Space Precedent: Cultural Park

Architects - NL Architects

Location - Koog aan de Zaan, Zaanstad, Netherlands

Project Details:• Attempt to restore the connection between

both sides of town • Activate the space under the road• Revitalised area from wasteland to focal

point

A8ernA

Page 13: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Designer: Assemble

Location: Hackney Wick, London

Folly for a Flyover

Project Details:• Temporary cinema constructed under a central

London Motorway overpass• Constructed by volunteers using reclaimed and

donated materials• Draws influence from surrounding heritage

brick buildings, ‘posing as an imaginary piece of the past’.

• Activation and communty use of underutilised space

Open Space Precedent: Cultural Park

Page 14: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Open Space Precedent: Cultural Park

Architect: Rogers Marvel Architects PLLC

Location: Brooklyn, New York

St. Ann’s Warehouse, Brooklyn Bridge Park

Project Details:• Revitalised public and community space• Post-industrial adaptive reuse of 1860’s

‘Tobacco Warehouse’

Page 15: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Precedents: Green Space - Croydon Linear Park

Designer: Hassell Location: Melbourne

Clifton Hill Rail ProjectBourke Street Park Community Garden

Page 16: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Underpass Park

Designer: Phillips Farevaag Smallenberg Location: Toronto, Canada

Precedents: Green Space - Croydon Linear Park

Page 17: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Underpass Park

Designer: Gehl Architects Location: Brighton UK

Precedents: Green Space - Croydon Linear Park

Designer: Claude Cormier Location: Montreal, Canada

Designer: ASPECT Studios Location: Adelaide, AustraliaDesigner: Rush Wright Location: Bendigo

Designer: Taylor Cullity Lethlean Location: Adelaide, Australia

Page 18: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

Architects - James Ramsey and Dan Barasch

Location - Lower East Side, New York

Project Details:

• Integration of green space with an underground

• First underground park proposal

Open Space Precedent: Linear park - The ExtremeLow Line

Page 19: South Road Upgrade: Croydon Overpass CLG WORKSHOP No. 2 ...€¦ · CLG Meeting No. 1: Start-up and opportunities workshop Develop initial benchmarking/ precedent study CLG Meeting

www.aspect.net.au

A

A

LOWERED SOUTH RD

CROYDON STATION

CROYDON STATION

SECTION AAELEVATION

SIMPLE, ELEGANT BRIDGE

ACTIVATED PUBLIC DOMAIN

SIMPLE, ELEGANT BRIDGE

ACTIVATED PUBLIC DOMAIN

A

A

LOWERED SOUTH RD

CROYDON STATION

CROYDON STATION

SECTION AAELEVATION

SIMPLE, ELEGANT BRIDGE

ACTIVATED PUBLIC DOMAIN

SIMPLE, ELEGANT BRIDGE

ACTIVATED PUBLIC DOMAIN

Section + Elevation DiagramCroydon Station