South Massachusetts Avenue Corridor Safety Improvements
Stakeholder Meeting #3| June 6, 2018
![Page 2: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/2.jpg)
• Welcome & Introductions
• Brief Recap of Project
Progress
• Conceptual Design
• Detailed discussion/feedback
AgendaMassachusetts Avenue – Sidney Street to Memorial Drive
![Page 3: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/3.jpg)
Existing Conditions Mass. Ave. Cross-Section (at Amherst Street)
✓ 88’ wide
✓ On-street bike lane
✓ On-street vehicle
parking
✓ Mix of meters and
other parking
✓ Bus stops
✓ Curb extensions at
multiple locations
14’Sidewalk
9’Parking
12’Travel
11’Travel
8’Parking
13’Sidewalk
5’Bike
Lane
11’Travel
5’Bike
Lane
CORRIDOR INFORMATION
![Page 4: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/4.jpg)
Project GoalsDESIGN TOOLBOX
✓ Address safety
issues and reduce
crashes - Vision Zero
✓ Reduce transit
delays
✓ Enable/encourage
people of all ages
and abilities to choose sustainable
transportation
![Page 5: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/5.jpg)
Public ProcessNEXT STEPS
✓Advisory Committee Meetings
✓ April 12, May 16, June 6
✓Wikimap online
✓Outreach to Businesses
✓ Individual Stakeholder meetings
✓ Transit/Ped/Bike Committees
✓ Corridor walk; plan review
✓Communitywide Meetings
✓ May 3, June 19
![Page 6: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/6.jpg)
Public FeedbackCORRIDOR INFORMATION
✓Need for better operating
conditions for bicyclists
✓Need for additional crosswalks
traversing Mass Ave
✓Desire to improve transit
operations
✓Concerns about
unpredictable ridesharing, tour
bus, food truck, commercial
loading & pick-up/drop-off
activity
✓ Improvements needed at rail
crossing
![Page 7: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/7.jpg)
7
CORRIDOR INFORMATION
Community FeedbackWhat we have heard!
• Delivery operations should have places to load/unload so they don’t use the bike lanes
• Prevent motorists from using bike lanes to load/unload
• Relocate MIT tour buses loading/unloading
• Bicyclists should be further separated from vehicles
• There are long vehicle queues, lots of traffic at Vassar Street
• Minimize conflicts, including bus/bike conflicts and bike/ped conflicts at 77 Mass Ave.
• Install more crosswalks between Sidney St and Landsdowne St
![Page 8: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/8.jpg)
8
CORRIDOR INFORMATION
Transportation/Traffic Analysis
• Corridor-wide transportation analysis to determine where:
• Bus lanes can be added• Crosswalk can be added• Vehicle lanes can be repurposed• Signal operations can be modified
• Manage traffic• Mitigate conflicts
• Bicycle lanes can be separated• Bicycle buffers can be added• Parking/curbside activities can be modified for
better operations• Loading Zones• Pick-up/Drop-off activities• Accessible spaces
![Page 9: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/9.jpg)
South Mass. Ave. Corridor
Draft Design – Before and After NEXT STEPS
Before After
![Page 10: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/10.jpg)
10
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
The corridor has been divided into 3 sections for clarity
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sid
ney
St
![Page 11: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/11.jpg)
11
CORRIDOR INFORMATION
Transportation/Traffic AnalysisCross Sections
• The three general cross sections (intersections vary)
1111
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
11
Most Complicated
![Page 12: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/12.jpg)
12
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sid
ney
St
12
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facilities
Bus lanes proposed for two sections, to address the key areas of delay
![Page 13: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/13.jpg)
Transit ServiceMBTA Bus Route 1: PM Peak
Method: Automatic Passenger Counter (APC) Data (MBTA)
CORRIDOR INFORMATION
Composite Grade
Excellent (A)
Good (B)
Satisfactory (C)
Unsatisfactory (D)
Poor (E)
Failing (F)
N/A
Failing Areas
MIT
![Page 14: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/14.jpg)
14
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
![Page 15: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/15.jpg)
15
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
![Page 16: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/16.jpg)
16
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBus Facility Details
Bus lanes at intersections: Right turning motorists may use bus lane
NB: graphic for illustrative purposes only
![Page 17: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/17.jpg)
17
CORRIDOR INFORMATION
Transportation/Traffic AnalysisBicycle Facilities
For most of the corridor, separated bike lanes can be created using on-street parking and flex posts
17
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sid
ney
St
17Flexpost/Parking Protection
Bike Lanes
![Page 18: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/18.jpg)
Bicycle FacilitiesSeparated Bike Lane –Parking Protected
DESIGN OVERVIEW
![Page 19: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/19.jpg)
Bicycle FacilitiesBike Lane with Curbside Parking
DESIGN OVERVIEW
Curbside parking/Accessible Parking
![Page 20: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/20.jpg)
Bus Stop OptionsDESIGN OVERVIEW
Bus stop at curb
Floating bus stop – under consideration
for later implementation
![Page 21: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/21.jpg)
Pedestrian Facilities• No changes to sidewalks
• New Crosswalk with Rapid Flash Beacon
• Signal modifications to reduce conflicts
DESIGN OVERVIEW
![Page 22: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/22.jpg)
22
CORRIDOR INFORMATION
Vehicle Parking Analysis
• Re-configurating parking that works better for loading (loading zones will be moved to the beginnings or ends of the block faces)
• Floating parking spots will be implemented, where possible
• Special consideration will be made for ADA spaces
222222
LZM MBlock Face
Existing Proposed
LZ M MBlock Face
Existing
MM
Proposed
MM
NB: graphic for illustrative purposes only, does not
represent exact dimensions
![Page 23: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/23.jpg)
Accessible Parking Option• Under evaluation for appropriate location(s)
• MassDOT and other guidelines
• Implemented in several cities
DESIGN OVERVIEW
![Page 24: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/24.jpg)
24
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
• Overall, in sections 1 & 3, lane removed without significant impacts
• There may be impacts to motor vehicles, with longer queues and possibly longer travel times, in Section 2
• NB: These plans are conceptual/draft ONLY and subject to change
• NB: Plans show existing conditions as background layer
![Page 25: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/25.jpg)
25
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (A)
Sid
ney
St
Bla
nche
St
DRAFT
DRAFT
Orange = loading
![Page 26: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/26.jpg)
26
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (B)
DRAFT
DRAFT
** Layout & placement of ADA spaces still under design **
![Page 27: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/27.jpg)
27
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 1: Sidney St to Albany St (C)
DRAFT
DRAFT
New crosswalk with Rapid Flash Beacon
![Page 28: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/28.jpg)
28
Vassar Street
Design Analysis
Mass. Ave
Alternative 1: 3-lane cross section• more turning conflicts for people
walking or bicycling• traffic better in off peak, worse
in peak, including buses
Alternative 2: 4-lane Cross Section• Key conflicts controlled for people
walking, bicycling• AM peak performs better, PM is
worse
Alternatives Analyzed at Vassar Street:
28Section 2:
Albany St to Vassar St
Sid
ney
St
![Page 29: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/29.jpg)
29
Vassar Street
Design Analysis
Mass. Ave
Alternative 2: 4-lane Cross Section
Implications & Opportunities
- Will require additional traffic signal equipment;
- Bike signals to be added
- Opportunities to increase space for bicyclists by modifying bulb-outs in future
DRAFT
DRAFT
![Page 30: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/30.jpg)
30
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 2: Albany St & Vassar St
DRAFT
DRAFT
![Page 31: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/31.jpg)
31
CORRIDOR INFORMATION
Transportation/Traffic AnalysisThree Main Sections
Other Design Details
![Page 32: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/32.jpg)
32
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 3: MIT (A)
DRAFT
DRAFT
Layout & placement still under design
DRAFT
![Page 33: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/33.jpg)
33
CORRIDOR INFORMATION
Transportation/Traffic AnalysisSection 3: MIT (B)
Am
hers
t St
Mem
oria
l Dr
DRAFT
DRAFT
Bike signal at 77 Mass Ave
![Page 34: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/34.jpg)
Section 1:Sidney St to Albany St
Section 2:Albany St to Vassar St
Section 3:MIT
Sid
ney
St
34
CORRIDOR INFORMATION
Transportation/Traffic AnalysisConclusion
• Bicycle and transit improvements are identified for the corridor
• Additional crosswalk at Windsor Street
• Intersections managed with turn lanes and signal control
• There are some notable parking modifications
• Still some design details to flesh out, especially given your input!
![Page 35: South Massachusetts Avenue Corridor Safety Improvements€¦ · South Massachusetts Avenue Corridor Safety Improvements Stakeholder Meeting #3| June 6, 2018 • Welcome & Introductions](https://reader030.vdocuments.mx/reader030/viewer/2022040408/5eb5da32fc88eb17f46d5efb/html5/thumbnails/35.jpg)
ScheduleBicycle,
pedestrian,
traffic
counts
April
Refine design
May - August
Public
Meeting #1
May 3
Parking study
Week of April
30Implementation
Late Summer
2018
Evaluation
Advisory
Committee
Meetings #2-3
May, June/July
NEXT STEPS
Advisory
Committee
Meeting #1
April 11
Public Meeting
#2/Open House
June 19