south kensington: consultative working group...2016/02/18 · 2 south kensington: cwg 18 february...
TRANSCRIPT
1 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
South Kensington:
Consultative
Working Group
18 FEBRUARY 2016
2 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Introduction
Progress on concept design
Design approach: John Smith
Next steps
3 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Design Approach
• Enhance architectural quality of revetments
• Canopy design relates to rhythm and scale of revetments
• Columns placed every fourth bay
• Intermediate canopy structure aligns with revetment bays
• Lightweight materials as counterpoint to solidity of brick
• Maximum area of glass to retain views of revetments
• Self-cleaning glass and access for cleaning and
maintenance
• Design of lighting, seating, and signage to emphasize
revetments
• Canopy, ticket hall facade, and overbridge to use
consistent materials and colours
4 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Eastbound Platform: Section showing canopy
5 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Eastbound Platform: Platform part elevation
6 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Eastbound Platform: Plan
7 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Eastbound Platform: Plan
8 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Eastbound Platform: Overbridge and walkway
9 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Ticket Hall: Section from Platform to Arcade
Additional points
10 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Ticket Hall: Section from Platform to Arcade
Additional points
11 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Ticket Hall: Plan
Additional points
12 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Ticket Hall: Indicative Image
Additional points
13 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Next Steps
Continue design development
Listed Building Consent for station upgrade works
Pre-application engagement activities
14 SOUTH KENSINGTON: CWG 18 FEBRUARY 2016
Questions?