Page 1: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

1

SOUTH DAKOTA 2014-2017

TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

Projects in the Rapid City Region

JULY 24, 2013

Page 2: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2

PROJECTS CURRENTLY IN PROGRESS IN THE RAPID CITY REGION

Page 3: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

3

Currently in Progress I-90 eastbound lanes - Exit 10 – Exit 17

In Spearfish

• $12.4 million • Heavy Constructors • New concrete pavement in the

eastbound lanes • Work at Exit 14 excluded • Exit 10 to 14 anticipated to be complete

by end of July • Exit 14 to 17 to begin after 2013

Sturgis Rally and completion in December 2013

Page 4: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

4

Currently in Progress I-90 eastbound lanes – Exit 112 - Exit 121

East of Wall

• $15.8 million • Stanley Johnsen Concrete • New concrete pavement in the

eastbound lanes • Subgrade treatments and edge drains • Completion date November 2013

Page 5: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

Currently in Progress SD44 in Rapid City

Jackson Blvd from Rapid Creek to Mt View Road

5

• $15.5 million • Heavy Constructors • New concrete pavement • Bike lanes • Signal and lighting upgrades • New water, sanitary sewer, and storm

sewer • Major work to be completed by end of

2013 • Completion date June 2014

Page 6: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

Currently in Progress SD34 – Lazelle Street - Sturgis

6

• $1.0 million • Ainsworth Benning Construction • ADA and sidewalk modifications • Lighting and signal upgrades • City water line • Work completed in early July 2013

• $1.1 million • Hills Materials Company • Mill and overlay asphalt pavement • Work starting after 2013 Sturgis Rally • Completion date in October 2013

Page 7: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

Currently in Progress US385 – Heartland Express

Oelrichs to Nebraska State Line

7

Final Project of Heartland Express in South Dakota • $25.2 million • Loiseau Construction • Construction of 2 additional lanes 13.5 miles

• Earthwork • Drainage Structures • Concrete and Asphalt Pavements

• October 2014 Completion Date • Summer 2014 anticipated completion

Page 8: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

Currently in Progress US16 & US16A

Custer & Hill City ADA Upgrades

8

• $1.0 million • Stanley Johnsen Concrete • Installation of new concrete ramps for ADA

compliance • Traffic signal and pedestrian push buttons • Work in Hill City is anticipated to be

completed by mid-July 2013 • Work in Custer is anticipated to begin late

August 2013 • Completion date December 2013

Page 9: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

9

9

2014 to 2017 State Proposed Major Projects

SDDOT Rapid City Region

Roughlock

Falls

Badlands

National Park

Center of Nation

Belle Fourche

Needles Highway

Harney Peak

Page 10: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

10

2014 - Item #9; SD87 Appx 1.7 m NW of the SD89 Jct near Hood Tunnel

• Roadway Widening • Context Sensitive Barriers

$2.3 million

Page 11: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

11

2014 - Item #14; I-90 Westbound Lanes in Spearfish From Exit 10 – Exit 17

• Remove & replace concrete • Grading • Bridge modifications • Lighting at Exit 12 • Work at Exit 14 excluded

$12.8 million

Spearfish

Page 12: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

12

2014 - Item #15; US85 -Deadwood From US 385 to Cemetery St.

Reconstruction of existing 2 lane to 3 lane roadway: • Left turn lane at various locations • On-street parking at various

locations • Asphalt concrete surfacing • Curb & gutter • Storm sewer • Roadway lighting • Traffic Signals

$8.4 million

Deadwood

Page 13: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

13

2014 - Item #16; US85 – Lead Main St. from South Main St. to Washington St.

Lead • Concrete pavement • Curb & Gutter • Sidewalk • Storm Sewer • City utilities • Roadway Lighting • Pavement repair on US14A

$4.8 million

Page 14: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

14

2014 - Item #19; I-90 Eastbound Frontage Road I-90 service road west of interstate from Exit 40 - Exit 44

• Grading • Asphalt concrete surfacing • New bridge • New Culvert & I-90 Crossover (for future reconstruction of I-90)

$13.7 million

Exit 40 Tilford

Exit 44 Piedmont

Page 15: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

15

2014 - Item #20; I-90 Westbound Frontage Rd. From Exit 44 - Exit 46 east of I-90

• Elimination of the existing Frontage Rd.

• Reconstruction of existing Meade County Roads

• Construction of new roadway • Grading • Asphalt concrete surfacing • New drainage culverts

$2.7 million

Exit 44 Piedmont

Exit 46 Piedmont

Page 16: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

16

2014 - Item #21; SD34 Over Bear Butte Creek, Spring Creek, Four Mile Creek, &

Belle Fourche River

• Replace 4 structures • Grading • Curve realignment at two (2) of the structures • Asphalt concrete surfacing

$4.4 million

9 M

ile R

oad

Page 17: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #25; SD44 From US385 to Chapel Lane in Rapid City

17

• Mill • Asphalt concrete resurfacing

$4.5 million

Rapid City

Page 18: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #26; SD44 – Jackson Blvd Rapid City From Chapel Lane Rd to Rapid Creek

18

Rapid City

• Grading • Concrete surfacing • Bike lanes • Curb & Gutter • Sidewalk • Storm sewer • Traffic signals and lighting

$9.0 million

Page 19: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #27; US16– Rapid City Mt. Rushmore Rd. from Tower Rd. to Flormann St.

19

1st Phase • Grading • Concrete surfacing • Curb & gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting • Bridge work

$4.8 million

Rapid City

Page 20: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #28; SD231 – Rapid City From Sheffer Street to Sturgis Road

20

• Grading • Concrete surfacing • Curb & gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting

$10.6 million

Rapid City

Page 21: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #29; I-190– Rapid City Intersection of US16 & I-190 & West Blvd

21

Intersection Improvement • Removal of islands • Traffic signal modifications • ADA modifications

$0.7 million

Rapid City

Page 22: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2014- Item #31; Sheridan Lake Rd - Rapid City From US385 to Alberta Rd

22

• Grading • Asphalt concrete Surfacing • Curb & Gutter $8.5 million

Rapid City

Page 23: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2015- Item #64; SD18P & SD471 Near Edgemont

23

• Replace bridges • North of Edgemont on SD18P • 1.3 miles south of Edgemont on SD471

• Approach grading and surfacing $4.2 million

Edgemont

Page 24: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2015- Item #66; US85 in Buffalo and south of Buffalo

24

• ADA upgrades, asphalt concrete resurfacing in Buffalo

• Mill & asphalt concrete resurfacing 12 miles south of Buffalo $4.1 million

Buffalo

Page 25: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2015- Item #67; I-90 - Exit 14 in Spearfish

25

EXIT 14

SPEARFISH

Reconstruct Interchange: • Reconfigure crossroad, ramps, and Colorado Blvd • Traffic Signals and Lighting $21.2 million

Page 26: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

26

2015 - Item #75; I-190 – Exit 1 (Silver Street )- Rapid City From Omaha St. to north of Anamosa St.

Interchange Replacement • Grading • Asphalt and concrete

surfacing • New bridges at Silver Street • Storm sewer • Curb and gutter • Traffic signal $16.2 million

Rapid City

Page 27: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

27

2015 - Item #76; SD240 From Wall south to Badlands National Park

• Shoulder widening • Mill & asphalt concrete resurfacing

$5.6 million

i90

i90

Wall

Page 28: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

28

2015 - Item #77; US16 – Rapid City Mt Rushmore Rd. from Flormann St. to St James St.

2nd Phase • Grading • Concrete surfacing • Curb & Gutter • Sidewalk • Storm Sewer • Traffic Signals and Lighting

$5.2 million

Rapid City

Page 29: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

29

2015 - Item #78; Anamosa St - Rapid City From Midway St. to Milwaukee St.

• Grading • Concrete surfacing • Curb & Gutter • Sidewalk • Storm Sewer • Intersection Improvement • Traffic Signals and Lighting $3.1 million

Rapid City

Page 30: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

30

2015 - Item #79; East Blvd- Rapid City East Blvd & East North St. from St Joseph St. to Herman St.

• Grading • Concrete surfacing • Curb & Gutter • Sidewalk • Storm Sewer • Intersection Improvement • Traffic Signals and Lighting $5.9 million

Rapid City

Page 31: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2015- Item #82; South Rochford Rd. from Rochford southwest to Deerfield Rd.

31

Reconstruction of existing 2 lane roadway: • Grading • Drainage Structures • Asphalt Surfacing

$10.0 million

Rochford

Mystic

Hill City

Page 32: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

32

2015 - Item #83; SD73 Bridges northwest of Faith over Flint Rock Creek and

Moreau River

• Replace 2 bridges • Approach Grading • Asphalt surfacing $3.1 million

Faith

Page 33: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

33

2015 - Item #85; US18 & SD391 US18 from Pine Ridge east 17 miles then south on SD391

to Nebraska State Line

Pine Ridge

• Shoulder Widening • Mill & asphalt concrete

resurfacing • New box culverts

$20.2 million

Page 34: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

34

2016 - Item #114; I-90 I-90 eastbound and westbound lanes between

Exits 40 & 44 and Exit 44 Interchange

• Reconstruct Interstate • Concrete Pavement • Reconstruct interchange at Exit 44 • New bridges at Elk Creek and Little

Elk Creek

$31.4 million

Exit 40 Tilford

Exit 44 Piedmont

Page 35: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

35

2016 - Item #115; Main Street in Sturgis From Middle Street to Fourth Street

• Grading • Asphalt concrete Surfacing • Curb & Gutter • Sidewalk • Storm Sewer

$1.5 million

Sturgis

Page 36: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

36

2016 - Item #121; US16 in Rapid City Mt Rushmore Rd. from St James St. to Omaha St.

3rd Phase Reconstruct roadway from St. James St. to Kansas City St. • Grading • Concrete surfacing • Curb & gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting Minor surface repair from Kansas City St. to Omaha St.

$4.0 million

Page 37: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2016- Item #122; SD231 & SD44 in Rapid City West Chicago St. from Sheffer St. to Deadwood Ave.

and Omaha St. from Deadwood Ave. to 12th St.

37

• Grading • Concrete surfacing • Curb and gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting • Structure repair

$11.8 million

Rapid City

Page 38: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

2016- Item #127; SD73 & US12 SD73 from the Grand River to the Jct of US12 near

Lemmon; US12 from ND State Line to Lemmon

38

Rural areas on SD73 & US12 • Shoulder Widening • Replace box culvert

In Lemmon • Roadway Lighting

Intersection of US12 & SD73 • Roadway Lighting • Widening for turn lane

$8.0 million

Lemmon

Page 39: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

39

2017 - Item #151; US18 Fm Jct with US385 to southeast city limits of Hot Springs

• Grading • Concrete surfacing • Curb & gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting

$6.4 million

Page 40: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

40

2017 - Item #155; I-90 east of Wall Westbound lanes from Exit 112 East to

Exit 131 (Cactus Flats)

Wall

• Mill • Asphalt Surfacing

$5.6 million

Page 41: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

41

2017 - Item #158; SD34 – East of Sturgis From 0.2 east of SD79 East 8 miles

Safety Improvement • Shoulder widening • Inslope flattening • Asphalt surfacing

$4.7 million

Page 42: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

42

2017 - Item #159; County Rd 14-16 in Box Elder From Exit 63 east to east of Ellsworth Rd

Reconstruction – convert divided section to a 3 lane section • Grading • Storm sewer • Asphalt concrete

$3.4 million

Box Elder

Page 43: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

43

2017 - Item #160; US385 From North of Pactola Dam to 4 Miles North of SD44 Jct

Shoulder Widening $8.4 million

Pactola

Reservoir

Page 44: SOUTH DAKOTA 2014-2017 TRANSPORTATION IMPROVEMENT PROGRAM (TENTATIVE)

44

2017 - Item #164; Sheridan Lake Rd. in Rapid City From Canyon Lake Dr. north to West Main St.

• Grading • Concrete pavement • Curb & Gutter • Sidewalk • Storm sewer • Traffic Signals and Lighting

$3.0 million

Rapid City