south carolina department of …info2.scdot.org/currentletting/constructiondocs/05082018 notice...

74
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted on the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with all Letting related questions. The following items will be made available on April 10, 2018 unless otherwise noted: • EBS (Electronic Bidding System) files via Bid Express website • Hardcopy plans & proposals will be printed upon request only via Engineering Publications o Located in room G23 SCDOT Headquarters o Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orders o Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds) Access the Construction Extranet for the following items: • Plans • Announcements • Bids as Received • CPM Schedule Templates Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime and Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a user name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx. Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score) issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-1656. The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx Quantities shown herein are approximate for information only and should not be used for bidding purposes. The Department reserves the right to change these quantities without notice. SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING May 08, 2018 Letting Location: SCDOT Headquarters Building Conference Room 331 955 Park Street Columbia, SC

Upload: doandien

Post on 30-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.

The following items will be made available on April 10, 2018 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans & proposals will be printed upon request only via Engineering Publications

o Located in room G23 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orderso Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)

Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates

Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.

Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.

The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx

Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.

SOUTH CAROLINADEPARTMENT OF TRANSPORTATION

NOTICE TO CONTRACTORSFOR

REGULAR HIGHWAY LETTINGMay 08, 2018

Letting Location: SCDOT Headquarters Building

Conference Room 331 955 Park Street Columbia, SC

Page 2: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 010 1Page:

South Carolina Department of Transportation 3/29/2018

0125820SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Abbeville DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA RECONSTRUCTION/REHAB - FDCEMENT RECLAMATION

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.5800

P030074P030074PCN: Project No.:

P032435P032435PCN: Project No.:

P032436P032436PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 4.000 EA

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 200.000 SY

BORROW EXCAVATION 2,743.000 CY

CEMENT MODIFIED RECYCLED BASE (8" UNIFORM) 6,514.000 SY

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 48,241.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 2,390.000 TON

LIQUID ASPHALT BINDER PG64-22 462.379 TON

MILLING EXISTING ASPHALT PAVEMENT 1.75" 6,514.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,000.000 SY

MILLED-IN RUMBLE STRIP 6.360 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,281.280 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 6,450.536 TON

DRIVEWAY PAVING-SURFACE TYPE C 230.750 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,082.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 654.000 LF

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 36.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 87,693.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 28,830.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 375.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 985.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,180.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 125,364.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 198.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 24,303.000 LF

Page 3: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 010 2Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 9,610.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 125.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 46.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 299.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,520.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 36,860.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 13.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 265.000 EA

DETECTABLE WARNING MATERIAL 100.000 SF

PEDESTRIAN RAMP CONSTRUCTION 200.000 SY

SURFACE APPLIED DETECTABLE WARNING 20.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 3,325.000 LF

END TERMINAL - TYPE T 16.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 3.294 ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 30.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 510.000 LF

SILT FENCE 8,355.000 LF

REPLACE/REPAIR SILT FENCE 845.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 2,125.000 LF

Page 4: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 020 3Page:

South Carolina Department of Transportation 3/29/2018

0247500SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Aiken DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PPP - PRESERVATION OVERLAY

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

5.3000

P034751P034751PCN: Project No.:

P034752P034752PCN: Project No.:

P034753P034753PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,100.000 SY

BORROW EXCAVATION 493.000 CY

LIQUID ASPHALT BINDER PG64-22 573.900 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 44,215.000 SY

MILLED-IN RUMBLE STRIP 4.350 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 9,109.499 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,740.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6,900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 28,490.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 2,086.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,388.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 44.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 9.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA

HANDICAP SYMBOL - PERM.PVMT MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 2,060.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 65,410.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 1,108.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 28,490.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,086.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,388.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 44.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 9.000 EA

Page 5: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 020 4Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,060.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 65,410.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 430.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,108.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 357.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 20.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 570.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 60.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,020.000 LF

SAWCUT FOR LOOP DETECTOR 660.000 LF

DETECTABLE WARNING MATERIAL 550.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,100.000 SY

SURFACE APPLIED DETECTABLE WARNING 190.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 2.465 ACRE

Page 6: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 030 5Page:

South Carolina Department of Transportation 3/29/2018

1512080SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Colleton DBE Goal Percent: 0.00%

Completion Date:

Description: 2017 FA PRIMARY PROGRAM IN COLLETON- SC 64, SC 303

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

8.0300

P031748P031748PCN: Project No.:

P031987P031987PCN: Project No.:

P032565P032565PCN: Project No.:

P036895P036895PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 4.000 EA

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 993.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 355.000 LF

REMOVAL & DISPOSAL OF EXISTING CONCRETE 60.000 CY

REMOVAL OF EXIST. GUARDRAIL 237.500 LF

UNCLASSIFIED EXCAVATION 786.000 CY

BORROW EXCAVATION 2,493.000 CY

EXCAVATION FOR SHOULDER PAVING 89.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 89.000 STA

MAINTENANCE STONE 207.300 TON

HOT MIX ASPHALT BASE COURSE - TYPE A 448.800 TON

LIQUID ASPHALT BINDER PG64-22 1,354.582 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 18,180.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 17,560.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 120,760.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,300.000 SY

MILLED-IN RUMBLE STRIP 12.700 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 6,836.633 TON

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 4,829.440 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 8,044.821 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 4,287.010 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 1,116.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,728.000 SF

Page 7: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 030 6Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 1,850.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 80,260.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 882.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 648.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 21.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 19.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,390.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 69,380.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 140.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,180.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 262,930.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,270.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,840.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 33.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 33.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 7,210.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 257,420.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 400.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 140.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 169.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 15.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 869.000 EA

FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 100.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 7,800.000 LF

SAWCUT FOR LOOP DETECTOR 4,000.000 LF

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EA

24" SMOOTH WALL PIPE 96.000 LF

CATCH BASIN - TYPE 17 (TOP ONLY) 1.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 250.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 105.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 468.000 SY

DETECTABLE WARNING MATERIAL 65.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 58.000 SY

PEDESTRIAN RAMP CONSTRUCTION 150.000 SY

SURFACE APPLIED DETECTABLE WARNING 120.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 137.500 LF

STEEL BEAM GUARDRAIL (THRIE) 125.000 LF

END TERMINAL - TYPE T 8.000 EA

Page 8: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 030 7Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PERMANENT GRASSING FOR SMALL PROJECTS 7.351 ACRE

Page 9: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 040 8Page:

South Carolina Department of Transportation 3/29/2018

1591310SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Colleton DBE Goal Percent: 0.00%

Completion Date:

Description: 2016 COLLETON CTC - S-684, S-688

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$24.00

$37.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.9220

P027541P027541PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 0.817 ACRE

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 35.000 SY

SITE EXCAVATION 1.000 LS

BORROW EXCAVATION 230.000 CY

MUCK EXCAVATION 67.000 CY

FINE GRADING 4,557.000 SY

FLOWABLE FILL 150.000 CY

MAINTENANCE STONE 205.000 TON

HOT MIX ASPHALT BASE COURSE - TYPE B 572.000 TON

LIQUID ASPHALT BINDER PG64-22 171.538 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,150.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 796.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE C 1,546.633 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 957.000 TON

HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 20.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 184.000 SF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" PERM. YEL. 70.000 EA

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 1,060.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 64.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 700.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 950.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,060.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 64.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 700.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 950.000 LF

Page 10: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 040 9Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 45.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 46.000 EA

18" PERF.CORR. ALUM. ALLOY PIPE-0.060"WITH FABRIC 967.000 LF

24" PERF.CORR. ALUM. ALLOY PIPE-0.060"WITH FABRIC 1,013.000 LF

15" SMOOTH WALL PIPE 26.000 LF

18" SMOOTH WALL PIPE 642.000 LF

24" SMOOTH WALL PIPE 170.000 LF

18" SMOOTH WALL PIPE 45 DEG BEND 2.000 EA

DROP INLET (24" X 36") 28.000 EA

MANHOLE WITH STANDARD 5' X 5' BOX 1.000 EA

BEVELING OF PIPE END 5.000 EA

AGGREGATE UNDERDRAIN (AGGR.NO. 57) 88.000 TON

RIP-RAP (CLASS B) 35.000 TON

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 45.000 SY

TEMPORARY BARRIER FENCE 100.000 LF

MOVING ITEM NO. 001 1.000 LS

MOVING ITEM NO. 002 1.000 LS

MOVING ITEM NO. 003 1.000 LS

PERMANENT COVER 0.817 ACRE

PERMANENT GRASSING FOR SMALL PROJECTS 0.660 ACRE

TEMPORARY COVER 1.634 ACRE

FERTILIZER (NITROGEN) 82.000 LB

FERTILIZER (PHOSPHORIC ACID) 82.000 LB

FERTILIZER (POTASH) 82.000 LB

AGRICULTURAL GRANULAR LIME 1,634.000 LB

SELECTIVE WATERING 54,300.000 GAL

MOWING 2.451 ACRE

ROOT BARRIER 525.000 LF

SODDING 2.420 MSY

HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.817 ACRE

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 576.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 576.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 119.000 LF

SILT FENCE 3,645.000 LF

REPLACE/REPAIR SILT FENCE 365.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 912.000 LF

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 11: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 050 10Page:

South Carolina Department of Transportation 3/29/2018

2325970SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Greenville DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION IN GREENVILLE

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

8.9600

P031355P031355PCN: Project No.:

P033661P033661PCN: Project No.:

P033672P033672PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 15.140 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,514.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 21.430 LaMi

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 23,370.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 33,073.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 4,562.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 30.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,380.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 50.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 38.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 15.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 9,200.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 117,289.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 46,740.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 33,073.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 5,492.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,098.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 50.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 38.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 15.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 18,400.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 234,578.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,440.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 912.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,059.000 EA

Page 12: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 050 11Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 324,610.605 SY

MICRO SURFACING SURFACE COURSE 324,610.605 SY

Page 13: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 060 12Page:

South Carolina Department of Transportation 3/29/2018

2547920SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Hampton DBE Goal Percent: 0.00%

Completion Date:

Description: HAMPTON CTC RESURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

11.1500

P029928P029928PCN: Project No.:

P030820P030820PCN: Project No.:

P030821P030821PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 183.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 20.000 LF

REMOVAL OF EXIST. GUARDRAIL 420.000 LF

BORROW EXCAVATION 2,146.000 CY

EXCAVATION FOR SHOULDER PAVING 1,133.088 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 1,133.088 STA

MAINTENANCE STONE 25.100 TON

HMA SHOULDER WIDENING COURSE 5,838.507 TON

LIQUID ASPHALT BINDER PG64-22 1,064.412 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,450.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 60.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 2,300.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,800.000 SY

MILLED-IN RUMBLE STRIP 12.916 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 3,338.533 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 9,453.050 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,264.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 530.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 116,140.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 602.000 LF

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 8,540.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 71,380.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,020.000 LF

Page 14: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 060 13Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 232,280.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,094.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 17,080.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 142,760.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 140.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 140.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 762.000 EA

ADJUST DROP INLET ADJUST D. I. 9.000 EA

CONCRETE CURB AND GUTTER (3'-0") VERTICAL FACE 20.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 8.000 SY

DETECTABLE WARNING MATERIAL 87.500 SF

PEDESTRIAN RAMP CONSTRUCTION 175.000 SY

SURFACE APPLIED DETECTABLE WARNING 60.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 800.000 LF

STEEL BEAM GUARDRAIL (THRIE) 525.000 LF

END TERMINAL - TYPE T 10.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 10.405 ACRE

TEMPORARY EROSION CONTROL BLANKET (CLASS B) 0.200 MSY

Page 15: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 070 14Page:

South Carolina Department of Transportation 3/29/2018

2846390SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Kershaw DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA CHIPSEAL KERSHAW CTY - S-87

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

2.7900

P036777P036777PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 4.000 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 400.000 SY

MILLED-IN RUMBLE STRIP 5.600 MI

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 39,283.199 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 208.000 SF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 59,500.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 53,688.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 29,750.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 500.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 26,844.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 190.000 EA

Page 16: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 080 15Page:

South Carolina Department of Transportation 3/29/2018

2846440SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Kershaw DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FED AID PMST KERSHAW COUNTY -US 1, SC 97

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

9.2800

P036775P036775PCN: Project No.:

P036776P036776PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

MAINTENANCE STONE 16.000 TON

LIQUID ASPHALT BINDER PG64-22 5.040 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 100.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,500.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 790.000 SY

HOT MIX ASPHALT SURFACE COURSE TYPE D 80.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 133,466.703 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 416.000 SF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 192,760.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 180.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 14,980.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 99,220.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 98,170.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 90.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,490.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 50,710.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 620.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 3,615.000 LF

RESET GUARDRAIL 3,005.000 LF

END TERMINAL - TYPE T 14.000 EA

RESET END TERMINAL-TYPE T 8.000 EA

Page 17: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 090 16Page:

South Carolina Department of Transportation 3/29/2018

3146610SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Lee DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FED AID PRIMARIES LEE CTY - SC 441,SC 527

11/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

1.7800

P033681P033681PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

BORROW EXCAVATION 356.000 CY

EXCAVATION FOR SHOULDER PAVING 190.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 190.000 STA

MAINTENANCE STONE 4.750 TON

HMA SHOULDER WIDENING COURSE 1,673.760 TON

LIQUID ASPHALT BINDER PG64-22 395.156 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 475.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 21,900.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 100.000 SY

MILLED-IN RUMBLE STRIP 3.600 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 2,923.947 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 2,949.947 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 100.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 805.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 660.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 56,600.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 45.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,460.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 30,000.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 220.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 18,900.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 15.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,380.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 3,600.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 130.000 EA

REMOVE AND REPLACE THRIE BEAM GUARDRAIL 160.000 LF

RESET GUARDRAIL 1,200.000 LF

Page 18: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 090 17Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

END TERMINAL - TYPE T 3.000 EA

RESET END TERMINAL-TYPE T 1.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 1.726 ACRE

Page 19: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 100 18Page:

South Carolina Department of Transportation 3/29/2018

3210440SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Lexington DBE Goal Percent: 17.50%

Completion Date:

Description: SWANSEA WEST SECOND STREET PHASE I- SC 6 - SIDEWALK IMPROVEMENTS

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$19.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.1810

P029122P029122PCN: Project No.:

Description Quantity Units

MOBILIZATION 1031000 1.000 LS

BONDS AND INSURANCE 1032010 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1050800 1.000 EA

TRAFFIC CONTROL 1071000 1.000 LS

CPM PROGRESS SCHEDULE 1080300 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 2011000 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2023000 417.000 SY

REMOVAL & DISPOSAL OF EXISTING CONCRETE 2027000 2.000 CY

UNCLASSIFIED EXCAVATION 2031000 77.000 CY

BORROW EXCAVATION 2033000 53.000 CY

FLOWABLE FILL 2103000 5.000 CY

MAINTENANCE STONE 3069900 50.000 TON

LIQUID ASPHALT BINDER PG64-22 4011004 2.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 4013990 83.000 SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 4020320 20.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 4030320 20.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 6020005 426.000 SF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 6271015 445.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 6271025 74.000 LF

REMOVAL OF PAVEMENT MARKINGS 6319505 180.000 LF

FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 6510105 24.750 SF

CONC. FOR STRUCTURES - CLASS 3000(ROADWAY) 7011100 0.312 CY

18" SMOOTH WALL PIPE 7143618 48.000 LF

CLEANING EXISTING PIPE 7149999 600.000 LF

CATCH BASIN -TYPE 1 CB - TYPE 1 7191005 1.000 EA

CONCRETE CURB (9" X 15") 7201000 25.000 LF

CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 7203210 70.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 7204100 755.000 SY

DETECTABLE WARNING MATERIAL 7204900 125.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 7205000 400.000 SY

Page 20: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 100 19Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PEDESTRIAN RAMP CONSTRUCTION 7209000 250.000 SY

GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 8048205 20.000 SY

PERMANENT GRASSING FOR SMALL PROJECTS 8100101 0.172 ACRE

TEMPORARY EROSION CONTROL BLANKET (ECB) 8151110 2.480 MSY

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 8152004 100.000 LF

SILT FENCE 8153000 3,180.000 LF

REPLACE/REPAIR SILT FENCE 8153090 318.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 8154050 795.000 LF

CLEANING INLET STRUCTURE FILTERS 8156200 10.000 EA

STABILIZED CONSTRUCTION ENTRANCE 8156490 550.000 SY

Page 21: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 110 20Page:

South Carolina Department of Transportation 3/29/2018

3246450SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Lexington DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FED AID PRESERVATION LEX CTY -MICROSURFACING, CRACK SEAL

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

22.3800

P036772P036772PCN: Project No.:

P036773P036773PCN: Project No.:

P036774P036774PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 0.500 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 50.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 31.300 LaMi

MICRO SURFACING SURFACE COURSE 142,892.738 SY

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 690.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 118,817.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 272.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 120.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 7.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,130.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 136,728.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 400.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,770.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 216,779.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 172.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 110.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 12.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 6.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 17,350.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 214,064.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 730.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 660.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,908.000 EA

Page 22: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 110 21Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

SURFACE APPLIED DETECTABLE WARNING 30.000 SF

Page 23: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 120 22Page:

South Carolina Department of Transportation 3/29/2018

3412030SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Marion DBE Goal Percent: 10.50%

Completion Date:

Description: US 501 BYPASS LEFT TURN LANE MARIONCOUNTY INDUSTRIAL PARK

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$11.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.4630

P030674P030674PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS

UNCLASSIFIED EXCAVATION 77.000 CY

BORROW EXCAVATION 767.000 CY

MUCK EXCAVATION 450.000 CY

FINE GRADING 914.000 SY

HOT MIX ASPHALT BASE COURSE - TYPE A 325.000 TON

LIQUID ASPHALT BINDER PG64-22 26.000 TON

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 360.000 SY

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 85.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 121.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 392.000 SF

PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 38.000 LF

PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 38.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 502.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 700.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 407.000 LF

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 2.000 EA

PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 1.000 EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 38.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 502.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 407.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 2.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 38.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 700.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 0.292 ACRE

Page 24: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 120 23Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

SEDIMENT TUBES FOR DITCH CHECKS 75.000 LF

SILT FENCE 382.000 LF

INLET STRUCTURE FILTER - TYPE D1 1.000 EA

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 25: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 130 24Page:

South Carolina Department of Transportation 3/29/2018

3726140SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Oconee DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION IN OCONEE -MICROSURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

14.5600

P032304P032304PCN: Project No.:

P033658P033658PCN: Project No.:

P033664P033664PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 14.060 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,406.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 7.010 LaMi

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6,880.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 151,893.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 205.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 19.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 12.000 EA

WHITE WORD MESSAGE "SCHOOL" -PERM.PVMT.MARKING 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 2,420.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 152,293.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 13,760.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 152,233.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 205.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 19.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,840.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 292,016.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 308.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 34.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,060.000 EA

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 248,923.929 SY

MICRO SURFACING SURFACE COURSE 248,923.929 SY

Page 26: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 140 25Page:

South Carolina Department of Transportation 3/29/2018

3847660SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Orangeburg DBE Goal Percent: 17.50%

Completion Date:

Description: CITY OF ORANGEBURG SIDEWALKS -S-612, S-614

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$23.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

0.1000

P029840P029840PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 1.000 EA

TRAFFIC CONTROL 1.000 LS

CPM PROGRESS SCHEDULE 1.000 LS

CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 25.000 SY

UNCLASSIFIED EXCAVATION 316.000 CY

FLOWABLE FILL 25.000 CY

MAINTENANCE STONE 50.000 TON

LIQUID ASPHALT BINDER PG64-22 1.600 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 25.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 144.000 SF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 36.000 LF

18" SMOOTH WALL PIPE 100.000 LF

CATCH BASIN -TYPE 16 2.000 EA

DROP INLET (24" X 36") 1.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 30.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 426.000 SY

DETECTABLE WARNING MATERIAL 113.000 SF

CONCRETE DRIVEWAY(6" UNIFORM) 251.000 SY

PEDESTRIAN RAMP CONSTRUCTION 225.000 SY

RIGHT OF WAY MARKER(REBAR AND CAP) 10.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 0.100 ACRE

TEMPORARY COVER 0.050 ACRE

MOWING 0.300 ACRE

SODDING 0.050 MSY

INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 40.000 LF

INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 40.000 LF

SEDIMENT TUBES FOR DITCH CHECKS 50.000 LF

Page 27: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 140 26Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

SILT FENCE 156.000 LF

SILT BASINS 50.000 CY

STABILIZED CONSTRUCTION ENTRANCE 550.000 SY

Page 28: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 150 27Page:

South Carolina Department of Transportation 3/29/2018

3925930SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Pickens DBE Goal Percent: 0.00%

Completion Date:

Description: FDP AND CRACK SEALING - US 123, SC 133

4/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

14.5500

P034690P034690PCN: Project No.:

P034693P034693PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 14.100 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,410.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 34.700 LaMi

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,000.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 1,000.000 LF

Page 29: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 160 28Page:

South Carolina Department of Transportation 3/29/2018

3925940SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Pickens DBE Goal Percent: 0.00%

Completion Date:

Description: 2018FA PRESERVATION PICKENS COUNTY- MICROSURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

3.3700

P034692P034692PCN: Project No.:

P034703P034703PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 150.000 SY

MAINTENANCE STONE 17.500 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,200.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 550.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 7.840 LaMi

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 1,100.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 27,773.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 4,530.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 160.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 23.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 820.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 36,354.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,200.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 27,773.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 4,530.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 160.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 23.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,640.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 72,708.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 51.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 82.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 426.000 EA

DETECTABLE WARNING MATERIAL 75.000 SF

PEDESTRIAN RAMP CONSTRUCTION 150.000 SY

Page 30: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 160 29Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

SURFACE APPLIED DETECTABLE WARNING 30.000 SF

MICRO SURFACING SURFACE COURSE 62,215.000 SY

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 62,215.000 SY

Page 31: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 170 30Page:

South Carolina Department of Transportation 3/29/2018

4225640SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Spartanburg DBE Goal Percent: 0.00%

Completion Date:

Description: 2018FA PRESERVATION IN SPARTANBURG- SC 295, CRACK SEAL

5/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

6.3500

P033602P033602PCN: Project No.:

P033655P033655PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 75.000 SY

MAINTENANCE STONE 57.800 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,780.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 32.010 LaMi

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 4,000.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,000.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 4,000.000 LF

DETECTABLE WARNING MATERIAL 37.500 SF

PEDESTRIAN RAMP CONSTRUCTION 75.000 SY

Page 32: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 180 31Page:

South Carolina Department of Transportation 3/29/2018

4225650SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Spartanburg DBE Goal Percent: 0.00%

Completion Date:

Description: 2018FA PRESERVATION IN SPARTANBURG- MICROSURFACING

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

16.7000

P033617P033617PCN: Project No.:

P033659P033659PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

MAINTENANCE STONE 5.000 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 500.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 15.830 LaMi

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 1,190.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 95,888.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 81,840.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 430.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 287.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 16.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 3,080.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 168,082.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,380.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 95,888.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 81,840.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 430.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 287.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 16.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,160.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 336,164.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 124.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 10.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,299.000 EA

MICRO SURFACING SURFACE COURSE 286,354.000 SY

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 286,354.000 SY

Page 33: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 190 32Page:

South Carolina Department of Transportation 3/29/2018

4625890SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: York DBE Goal Percent: 0.00%

Completion Date:

Description: SLD PAVING, FDP, MILL, CHIP, STB

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

4.4300

P033601P033601PCN: Project No.:

P033620P033620PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE 7.180 CY

REMOVAL OF EXIST. GUARDRAIL 300.000 LF

BORROW EXCAVATION 1,101.000 CY

EXCAVATION FOR SHOULDER PAVING 935.616 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 935.616 STA

MAINTENANCE STONE 475.000 TON

HMA SHOULDER WIDENING COURSE 6,237.440 TON

LIQUID ASPHALT BINDER PG64-22 1,182.723 TON

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 10,900.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 7,775.000 SY

MILLED-IN RUMBLE STRIP 17.720 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 16,234.026 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 174.125 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 145,540.233 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 890.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 25,920.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 93,644.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 900.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 560.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 16.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 14.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 2,082.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 93,644.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 12,960.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 46,822.000 LF

Page 34: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 190 33Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 900.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 380.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 10.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 5.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 1,041.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 46,822.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 591.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 8,650.000 LF

END ANCHOR-TYPE B 17.000 EA

END TERMINAL - TYPE T 23.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 9.050 ACRE

Page 35: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 200 34Page:

South Carolina Department of Transportation 3/29/2018

5425870SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Chester Fairfield DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL, OVERLAY

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

10.3800

P032497P032497PCN: Project No.:

P033596P033596PCN: Project No.:

P033650P033650PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING CONCRETE 4.000 CY

REMOVAL OF EXIST. GUARDRAIL 500.000 LF

BORROW EXCAVATION 3,676.000 CY

STATION GRADING 15.312 STA

EXCAVATION FOR SHOULDER PAVING 878.592 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 878.592 STA

MAINTENANCE STONE 100.000 TON

HMA SHOULDER WIDENING COURSE 5,358.960 TON

LIQUID ASPHALT BINDER PG64-22 1,503.857 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,875.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 13,200.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 400.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 15,460.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 6,400.000 SY

MILLED-IN RUMBLE STRIP 20.620 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,150.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 16,492.053 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 3,978.375 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 750.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,832.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 14,834.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 194,002.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,186.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 66.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 52.000 EA

Page 36: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 200 35Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,760.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 155,020.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 7,402.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 111,216.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 28.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 602.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 32.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 25.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,380.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 92,430.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 365.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 415.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 480.000 LF

SAWCUT FOR LOOP DETECTOR 160.000 LF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,675.000 LF

END TERMINAL - TYPE T 24.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 12.136 ACRE

Page 37: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 210 36Page:

South Carolina Department of Transportation 3/29/2018

5425880SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: ChesterfieldLancaster

DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL, RESURFACE

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

11.5200

P032498P032498PCN: Project No.:

P033597P033597PCN: Project No.:

P033649P033649PCN: Project No.:

P033651P033651PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,900.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 375.000 LF

REMOVAL & DISPOSAL OF EXISTING CONCRETE 92.500 CY

REMOVAL OF EXIST. GUARDRAIL 350.000 LF

BORROW EXCAVATION 1,286.000 CY

EXCAVATION FOR SHOULDER PAVING 679.008 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 679.008 STA

MAINTENANCE STONE 40.000 TON

HMA SHOULDER WIDENING COURSE 2,812.480 TON

LIQUID ASPHALT BINDER PG64-22 1,797.866 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,700.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 12,900.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 179,634.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 20,125.000 SY

MILLED-IN RUMBLE STRIP 12.860 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 21,887.388 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,501.220 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 2,571.360 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,140.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 30,716.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 137,091.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 4,960.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 6,844.000 LF

Page 38: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 210 37Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 174.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 94.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 16.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 8,400.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 323,730.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 15,358.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 66,433.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,120.000 LF

24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 20.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 3,422.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 89.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 48.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 8.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,200.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 134,865.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 857.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 170.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,436.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 27,930.000 LF

SAWCUT FOR LOOP DETECTOR 9,310.000 LF

ADJUST CATCH BASIN 8.000 EA

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 375.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 20.000 SY

DETECTABLE WARNING MATERIAL 950.000 SF

PEDESTRIAN RAMP CONSTRUCTION 1,900.000 SY

SURFACE APPLIED DETECTABLE WARNING 240.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 50.000 LF

END TERMINAL - TYPE T 9.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 4.722 ACRE

Page 39: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 220 38Page:

South Carolina Department of Transportation 3/29/2018

5425900SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Cherokee ChesterLancaster York

DBE Goal Percent: 0.00%

Completion Date:

Description: CMRB AND RESURFACING

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

14.2300

P030049P030049PCN: Project No.:

P033647P033647PCN: Project No.:

P033648P033648PCN: Project No.:

P033653P033653PCN: Project No.:

P034704P034704PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 1,750.000 LF

UNCLASSIFIED EXCAVATION 2,444.000 CY

BORROW EXCAVATION 5,500.000 CY

STATION GRADING 27.984 STA

CEMENT MODIFIED RECYCLED BASE (12" UNIFORM) 179,896.000 SY

PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 6,801.066 TON

MAINTENANCE STONE 300.000 TON

LIQUID ASPHALT BINDER PG64-22 960.268 TON

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 750.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 8,200.000 SY

MILLED-IN RUMBLE STRIP 13.700 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 4,300.000 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,626.120 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 5,416.647 TON

DRIVEWAY PAVING-SURFACE TYPE B 283.000 TON

DRIVEWAY PAVING-SURFACE TYPE C 462.000 TON

ASPHALT SURFACE TREATMENT(SINGLE TREATMENT) 164,803.196 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,038.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,326.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 450,921.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,966.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 45.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 14.000 EA

Page 40: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 220 39Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,390.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 393,132.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 300.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 922.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 150,307.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,322.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 15.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 14.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,130.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 148,927.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 300.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 25.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,157.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 5,525.000 LF

END TERMINAL - TYPE T 26.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 350.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 14.032 ACRE

SEDIMENT TUBES FOR DITCH CHECKS 600.000 LF

SILT FENCE 1,400.000 LF

Page 41: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 230 40Page:

South Carolina Department of Transportation 3/29/2018

5446280SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Cherokee Union DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, PMST

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

12.0300

P032477P032477PCN: Project No.:

P032480P032480PCN: Project No.:

P032482P032482PCN: Project No.:

P032487P032487PCN: Project No.:

P032506P032506PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 600.000 LF

LIQUID ASPHALT BINDER PG64-22 56.875 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 750.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,400.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 1,500.000 SY

MILLED-IN RUMBLE STRIP 19.960 MI

HOT MIX ASPHALT SURFACE COURSE TYPE E 875.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 186,583.463 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,366.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,292.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 254,120.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 400.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 16.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,920.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 193,620.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,146.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 127,060.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 200.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 10.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 5,460.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 98,925.000 LF

Page 42: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 230 41Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 24.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 54.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 941.000 EA

END TERMINAL - TYPE T 12.000 EA

Page 43: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 240 42Page:

South Carolina Department of Transportation 3/29/2018

5446290SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Chester Fairfield DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, PMST

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

7.2300

P032473P032473PCN: Project No.:

P032479P032479PCN: Project No.:

P032483P032483PCN: Project No.:

P032485P032485PCN: Project No.:

P034748P034748PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 350.000 LF

LIQUID ASPHALT BINDER PG64-22 30.875 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,200.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 4,250.000 SY

MILLED-IN RUMBLE STRIP 9.180 MI

HOT MIX ASPHALT SURFACE COURSE TYPE E 475.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 148,394.133 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 772.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12,028.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 152,732.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 598.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 52.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 68.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,180.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 133,164.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,014.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 76,366.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 299.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 36.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 34.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,090.000 LF

Page 44: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 240 43Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 66,582.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 358.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 479.000 EA

END TERMINAL - TYPE T 7.000 EA

Page 45: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 250 44Page:

South Carolina Department of Transportation 3/29/2018

5446300SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: ChesterfieldLancaster

DBE Goal Percent: 0.00%

Completion Date:

Description: FDP, PMST - SC 151, US 521

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

6.7700

P032474P032474PCN: Project No.:

P032475P032475PCN: Project No.:

P032478P032478PCN: Project No.:

P034750P034750PCN: Project No.:

P036786P036786PCN: Project No.:

P036794P036794PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 300.000 LF

LIQUID ASPHALT BINDER PG64-22 65.000 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 650.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,000.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 4,850.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,500.000 SY

MILLED-IN RUMBLE STRIP 7.760 MI

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,000.000 TON

PREVENTATIVE MAINTENANCE SURFACE TREATMENT 184,031.799 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,408.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 26,452.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 151,060.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 2,000.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 6,030.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 154.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 76.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 360.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 143,060.000 LF

WHITE WORD MESSAGE "STOP"-FAST DRY PAINT 2.000 EA

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 13,226.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 75,530.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,000.000 LF

Page 46: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 250 45Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 3,015.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 78.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 39.000 EA

WHITE WORD MESSAGE "STOP AHEAD" -THERMOPLASTIC - 125 MIL. 2.000 EA

WHITE WORD MESSAGE "STOP" -THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 180.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 71,530.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 792.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 194.000 EA

SURFACE APPLIED DETECTABLE WARNING 30.000 SF

END TERMINAL - TYPE T 6.000 EA

Page 47: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 260 46Page:

South Carolina Department of Transportation 3/29/2018

5447720SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Cherokee Union DBE Goal Percent: 0.00%

Completion Date:

Description: SHLD PAVING, FDP, MILL OVERLAY

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

13.1600

P032496P032496PCN: Project No.:

P033595P033595PCN: Project No.:

P033600P033600PCN: Project No.:

P033652P033652PCN: Project No.:

P033654P033654PCN: Project No.:

P034720P034720PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 475.000 SY

REMOVAL & DISPOSAL OF EXISTING CURB 150.000 LF

REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 250.000 SY

REMOVAL & DISPOSAL OF EXISTING CONCRETE 5.000 CY

BORROW EXCAVATION 2,528.000 CY

STATION GRADING 4.750 STA

EXCAVATION FOR SHOULDER PAVING 768.768 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 768.768 STA

MAINTENANCE STONE 410.000 TON

HMA SHOULDER WIDENING COURSE 5,125.120 TON

LIQUID ASPHALT BINDER PG64-22 1,737.093 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 6,600.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 15,825.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 3,400.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 54,586.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 13,702.000 SY

MILLED-IN RUMBLE STRIP 23.240 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3,564.600 TON

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 81.250 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 9,866.480 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 10,826.935 TON

HOT MIX ASPHALT SURFACE COURSE TYPE E 1,886.160 TON

Page 48: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 260 47Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,356.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12,832.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 254,682.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,100.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,888.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 9,596.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 144,977.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,454.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 112,981.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 920.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,956.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 8.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 6.000 EA

WHITE WORD MESSAGE "SCHOOL" -THERMOPLASTIC - 125 MIL. 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,908.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 90,731.000 LF

24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 550.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 304.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 647.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,875.000 LF

SAWCUT FOR LOOP DETECTOR 625.000 LF

CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 150.000 LF

CONCRETE SIDEWALK(4" UNIFORM) 200.000 SY

DETECTABLE WARNING MATERIAL 237.500 SF

PEDESTRIAN RAMP CONSTRUCTION 475.000 SY

STEEL BEAM GUARDRAIL STEEL BEAM GR. 550.000 LF

END TERMINAL - TYPE T 4.000 EA

GUARDRAIL W-BEAM CURVED SYSTEM 50.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 15.836 ACRE

SILT FENCE 2,000.000 LF

REPLACE/REPAIR SILT FENCE 1,000.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 1,000.000 LF

Page 49: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 270 48Page:

South Carolina Department of Transportation 3/29/2018

5547000SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Darlington Marlboro DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION - OVERLAY,CRACK SEAL

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

36.1600

P033622P033622PCN: Project No.:

P033628P033628PCN: Project No.:

P033630P033630PCN: Project No.:

P033636P033636PCN: Project No.:

P033638P033638PCN: Project No.:

P033644P033644PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 750.000 SY

BORROW EXCAVATION 2,316.000 CY

MAINTENANCE STONE 17.300 TON

LIQUID ASPHALT BINDER PG64-22 1,072.033 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 280.000 SY

FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 1,450.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 35,206.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 45.040 LaMi

MILLED-IN RUMBLE STRIP 24.080 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 17,016.374 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,550.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 23,960.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 257,940.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 800.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,460.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 42.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 36.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 8.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 19,240.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 165,700.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 1,000.000 LF

6/30/2019

Page 50: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 270 49Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 14,940.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 1,370.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 4,000.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 11,980.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 119,120.000 LF

8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 400.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 730.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 22.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 18.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 9,620.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 82,850.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 560.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 710.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 580.000 EA

REMOVAL OF PAVEMENT MARKINGS 196,250.000 LF

FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 700.000 LF

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 3,700.000 LF

SAWCUT FOR LOOP DETECTOR 2,100.000 LF

DETECTABLE WARNING MATERIAL 375.000 SF

PEDESTRIAN RAMP CONSTRUCTION 750.000 SY

SURFACE APPLIED DETECTABLE WARNING 150.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 11.230 ACRE

Page 51: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 280 50Page:

South Carolina Department of Transportation 3/29/2018

5547030SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: FlorenceWilliamsburg

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION - OVERLAY,CRACK SEAL

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

67.9700

P033624P033624PCN: Project No.:

P033629P033629PCN: Project No.:

P033632P033632PCN: Project No.:

P033637P033637PCN: Project No.:

P033640P033640PCN: Project No.:

P033645P033645PCN: Project No.:

P037025P037025PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 100.000 SY

BORROW EXCAVATION 3,287.000 CY

MAINTENANCE STONE 56.700 TON

LIQUID ASPHALT BINDER PG64-22 1,442.838 TON

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 800.000 SY

FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 4,870.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 1,200.000 SY

CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 219.520 LaMi

MILLED-IN RUMBLE STRIP 35.110 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 22,924.866 TON

WARM MIX ASPHALT SURFACE COURSE TYPE D 70.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,892.000 SF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 28,140.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 355,000.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,146.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 28.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 10.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,450.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 264,000.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 500.000 LF

Page 52: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 280 51Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,870.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 178,100.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,058.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 28.000 EA

WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 10.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)THERMO-125MIL 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 14,400.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 156,900.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 404.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 575.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,425.000 EA

REMOVAL OF PAVEMENT MARKINGS 332,500.000 LF

DETECTABLE WARNING MATERIAL 50.000 SF

PEDESTRIAN RAMP CONSTRUCTION 100.000 SY

SURFACE APPLIED DETECTABLE WARNING 120.000 SF

PERMANENT GRASSING FOR SMALL PROJECTS 15.933 ACRE

Page 53: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 290 52Page:

South Carolina Department of Transportation 3/29/2018

5547890SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: DISTRICT5 DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 RPMS ON PRIMARY AND SECONDARYROUTES - DISTRICT 5

10/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

1,000.0000

P037178P037178PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 27,835.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 11,900.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 89,975.000 EA

Page 54: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 300 53Page:

South Carolina Department of Transportation 3/29/2018

5646600SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Beaufort Jasper DBE Goal Percent: 0.00%

Completion Date:

Description: RESURFACING IN BEAUFORT/JASPER

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

7.2900

P032536P032536PCN: Project No.:

P033671P033671PCN: Project No.:

P033685P033685PCN: Project No.:

P034691P034691PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 4.000 EA

TRAFFIC CONTROL 1.000 LS

REMOVAL OF EXIST. GUARDRAIL 4,202.500 LF

BORROW EXCAVATION 1,674.000 CY

EXCAVATION FOR SHOULDER PAVING 189.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 189.000 STA

MAINTENANCE STONE 159.500 TON

HMA SHOULDER WIDENING COURSE 1,019.040 TON

LIQUID ASPHALT BINDER PG64-22 1,305.396 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,100.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 14,850.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 30,680.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 108,160.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,470.000 SY

MILLED-IN RUMBLE STRIP 12.420 MI

HOT MIX ASPHALT SURFACE COURSE TYPE B 21,178.150 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 2,200.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,466.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 6,900.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 67,580.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 1,275.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 13.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,135.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 35.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 30.000 EA

Page 55: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 300 54Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4,350.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 57,710.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 915.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 20,470.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 164,000.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 3,825.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,245.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 75.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 60.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 6,940.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 151,500.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,334.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 1,960.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 526.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 871.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 4,160.000 LF

SAWCUT FOR LOOP DETECTOR 1,680.000 LF

F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 4.000 EA

STEEL BEAM GUARDRAIL STEEL BEAM GR. 4,102.500 LF

END TERMINAL - TYPE T 6.000 EA

SEQUENTIAL KINKING TERMINAL - 350 1.000 EA

THRIE BEAM G.R.BRIDGE CONN. 5.000 EA

THRIE BEAM GUARDRAIL BRACKET CONNECTION 3.000 EA

PERMANENT GRASSING FOR SMALL PROJECTS 7.068 ACRE

ROOT BARRIER 1,500.000 LF

Page 56: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 310 55Page:

South Carolina Department of Transportation 3/29/2018

5647820SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Berkeley Charleston DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION -MICROSURFACING

7/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

43.4200

P037044P037044PCN: Project No.:

P037096P037096PCN: Project No.:

P037143P037143PCN: Project No.:

P037144P037144PCN: Project No.:

P037147P037147PCN: Project No.:

P037162P037162PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 10.000 SY

MAINTENANCE STONE 95.350 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 9,535.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 6,300.000 SY

MILLED-IN RUMBLE STRIP 66.020 MI

MICRO SURFACING SURFACE COURSE 939,074.395 SY

MICRO SURFACING LEVELING 20.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 6,717.000 SF

PAVE. MARK.(TEMP-PAINT)12INX18IN WHITE TRIANGLE YIELD BAR 48.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 35,750.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 331,015.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 25,190.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 3,391.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 44.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 2,822.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 113.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 106.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 12.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 5.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 49,890.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 278,990.000 LF

6" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 730.000 LF

Page 57: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 310 56Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 160.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 70,120.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 700,562.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 50,380.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 7,000.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5,754.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 226.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 212.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 24.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 10.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 98,410.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 552,470.000 LF

6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 1,460.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 12,210.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 610.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,705.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 1,466.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 5,929.000 EA

DETECTABLE WARNING MATERIAL 15.000 SF

PEDESTRIAN RAMP CONSTRUCTION 10.000 SY

SURFACE APPLIED DETECTABLE WARNING 140.000 SF

Page 58: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 320 57Page:

South Carolina Department of Transportation 3/29/2018

5647830SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Colleton Dorchester DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION -MICROSURFACING

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

12.2000

P037139P037139PCN: Project No.:

P037140P037140PCN: Project No.:

P037141P037141PCN: Project No.:

P037171P037171PCN: Project No.:

P037172P037172PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 220.000 SY

UNCLASSIFIED EXCAVATION 12.000 CY

BORROW EXCAVATION 12.000 CY

MAINTENANCE STONE 103.150 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 10,423.000 SY

MILLED-IN RUMBLE STRIP 9.640 MI

MICRO SURFACING SURFACE COURSE 240,901.574 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,388.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 5,148.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 112,467.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 344.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 451.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 49.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 49.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 5.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 5,155.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 97,451.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 10,276.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 224,714.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 878.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 902.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 98.000 EA

Page 59: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 320 58Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 98.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 10.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 2.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 10,310.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 195,992.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 141.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,115.000 EA

CONCRETE SIDEWALK(4" UNIFORM) 50.000 SY

CONCRETE MEDIAN 90.000 SY

SURFACE APPLIED DETECTABLE WARNING 392.000 SF

Page 60: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 330 59Page:

South Carolina Department of Transportation 3/29/2018

5647840SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Beaufort Jasper DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PRESERVATION -MICROSURFACING

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

14.4600

P037064P037064PCN: Project No.:

P037065P037065PCN: Project No.:

P037066P037066PCN: Project No.:

P037159P037159PCN: Project No.:

P037165P037165PCN: Project No.:

P037170P037170PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 350.000 SY

MAINTENANCE STONE 81.500 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 8,150.000 SY

SURFACE PLANE ASPHALT PAVEMENT - VARIABLE 7,760.000 SY

MILLED-IN RUMBLE STRIP 5.980 MI

MICRO SURFACING SURFACE COURSE 381,735.933 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,883.000 SF

PAVE. MARK.(TEMP-PAINT)12INX18IN WHITE TRIANGLE YIELD BAR 24.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 24,220.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 318.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 129,180.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 14,535.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 8,900.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 12.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 2,736.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 107.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 96.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 6,550.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 113,950.000 LF

24" YELLOW SOLID LINES - PERM.PVMT.MARKING 630.000 LF

Page 61: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 330 60Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 48,440.000 LF

6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 402.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 262,600.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 29,190.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 16,600.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,780.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 214.000 EA

WHITE SINGLE BIKE LANE ARROW (LT, STRAIGHT, RT)-FAST DRY PAINT 27.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 192.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 8.000 EA

BIKE LANE SYMBOL - FAST DRY PAINT 14.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 13,100.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 227,900.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 5,070.000 LF

24" YELLOW DIAGONAL LINES - FAST DRY PAINT 970.000 LF

BIKE LANE SYMBOL -PREFORMED THERMO - 90MIL 14.000 EA

BIKE LANE ARROW - PREFORMED THERMO - 90MIL 27.000 EA

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,451.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 90.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,821.000 EA

FURNISH & INSTALL EPOXY TUBES 45.000 EA

FURNISH EPOXY APPLICATOR 45.000 EA

INSTALL FLUSH MOUNTED WIRELESS SENSOR 45.000 EA

REMOVE FLUSH MOUNTED WIRELESS SENSOR 45.000 EA

DETECTABLE WARNING MATERIAL 120.000 SF

PEDESTRIAN RAMP CONSTRUCTION 300.000 SY

Page 62: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 340 61Page:

South Carolina Department of Transportation 3/29/2018

5647900SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: DISTRICT6 DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 RPMS ON PRIMARY AND SECONDARYROUTES - DISTRICT 6

11/30/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

710.0000

P037179P037179PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 18,710.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 8,430.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 65,835.000 EA

Page 63: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 350 62Page:

South Carolina Department of Transportation 3/29/2018

5647980SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Colleton Dorchester DBE Goal Percent: 0.00%

Completion Date:

Description: COLLETON/DORCHESTER FA RESURF 2018- REHAB, MILL, OVERLAY

8/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

6.6300

P032526P032526PCN: Project No.:

P033686P033686PCN: Project No.:

P033688P033688PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

CONSTRUCTION STAKES, LINES & GRADES 3.000 EA

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 45.000 SY

REMOVAL OF EXIST. GUARDRAIL 200.000 LF

UNCLASSIFIED EXCAVATION 368.000 CY

BORROW EXCAVATION 1,820.000 CY

EXCAVATION FOR SHOULDER PAVING 268.000 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 268.000 STA

MAINTENANCE STONE 118.000 TON

HMA SHOULDER WIDENING COURSE 1,335.840 TON

LIQUID ASPHALT BINDER PG64-22 1,077.812 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 5,500.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 4,300.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 30,740.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,350.000 SY

MILLED-IN RUMBLE STRIP 12.260 MI

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3,234.160 TON

HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 6,581.893 TON

HOT MIX ASPHALT SURFACE COURSE TYPE B 2,921.140 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 5,835.407 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 400.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 960.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 370.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 69,880.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 194.000 LF

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 4,470.000 LF

Page 64: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 350 63Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 40,570.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 740.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 190,565.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 388.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,260.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 137,756.000 LF

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 442.000 EA

CONCRETE CURB (TRANSITION) 40.000 LF

DETECTABLE WARNING MATERIAL 10.000 SF

PEDESTRIAN RAMP CONSTRUCTION 25.000 SY

STEEL BEAM GUARDRAIL STEEL BEAM GR. 2,475.000 LF

END TERMINAL - TYPE T 8.000 EA

THRIE BEAM G.R.BRIDGE CONN. 4.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 1,200.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 6.428 ACRE

TEMPORARY EROSION CONTROL BLANKET (CLASS A) 3.330 MSY

SILT FENCE 6,000.000 LF

REPLACE/REPAIR SILT FENCE 600.000 LF

REMOVAL OF SILT RETAINED BY SILT FENCE 1,500.000 LF

Page 65: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 360 64Page:

South Carolina Department of Transportation 3/29/2018

5746410SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Allendale BambergBarnwell Hampton

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PIP - REHAB, MILL OVERLAY

10/31/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

29.2200

P034723P034723PCN: Project No.:

P035753P035753PCN: Project No.:

P036753P036753PCN: Project No.:

P036756P036756PCN: Project No.:

P036757P036757PCN: Project No.:

P036765P036765PCN: Project No.:

P036795P036795PCN: Project No.:

P036797P036797PCN: Project No.:

P036801P036801PCN: Project No.:

P036812P036812PCN: Project No.:

P036836P036836PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 875.000 SY

REMOVAL OF EXIST. GUARDRAIL 790.000 LF

BORROW EXCAVATION 4,114.000 CY

EXCAVATION FOR SHOULDER PAVING 2,148.432 STA

HAULING OF EXCAVATED SHOULDER MATERIAL 2,148.432 STA

FLOWABLE FILL 150.000 CY

MAINTENANCE STONE 165.510 TON

HMA SHOULDER WIDENING COURSE 14,263.186 TON

LIQUID ASPHALT BINDER PG64-22 3,928.832 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 14,078.000 SY

FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 2,473.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.5" 7,700.000 SY

MILLING EXISTING ASPHALT PAVEMENT 1.75" 27,950.000 SY

MILLING EXISTING ASPHALT PAVEMENT 2.0" 27,100.000 SY

MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 22,400.000 SY

MILLED-IN RUMBLE STRIP 34.334 MI

Page 66: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 360 65Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

HOT MIX ASPHALT SURFACE COURSE TYPE B 10,220.507 TON

HOT MIX ASPHALT SURFACE COURSE TYPE C 33,038.484 TON

HOT MIX ASPHALT SURFACE COURSE TYPE D 10,978.920 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 5,304.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 7,305.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 193,336.000 LF

8" WHITE SOLID LINES PERM.PVMT.MARKINGS 415.000 LF

12" WHITE SOLID LINES - PERM.PVMT.MARKINGS 540.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)PERM.PVMT.MARK 13.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 1,808.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 15.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 5.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 4.000 EA

WHITE LANE DROP ARROW(LT.OR RT.)PERM.PVMT.MARKING 2.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 3.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 15,375.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 119,105.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 14,025.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 344,700.000 LF

8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 830.000 LF

12" WHITE SOLID LINES - FAST DRY PAINT 910.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,240.000 LF

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 20.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 5.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 4.000 EA

WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 4.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 4.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 28,790.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 235,170.000 LF

6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,220.000 LF

6"YEL SOLID LINES ON 6"CONC.CURB(TOP&SIDE)-FAST DRY PNT 280.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 610.000 LF

4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 210.000 LF

6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 215.000 LF

6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 91,800.000 LF

12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 12.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 397.000 LF

RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,780.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 41,830.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 347.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 14.000 EA

Page 67: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 360 66Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,696.000 EA

FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5,100.000 LF

SAWCUT FOR LOOP DETECTOR 1,850.000 LF

ADJUST DROP INLET ADJUST D. I. 7.000 EA

DETECTABLE WARNING MATERIAL 437.500 SF

PEDESTRIAN RAMP CONSTRUCTION 875.000 SY

SURFACE APPLIED DETECTABLE WARNING 775.000 SF

STEEL BEAM GUARDRAIL STEEL BEAM GR. 3,425.000 LF

GUARDRAIL W-BEAM WITH BASE PLATE 6.25’ POST SPACING 50.000 LF

GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 985.000 LF

STEEL BEAM GUARDRAIL (THRIE) 575.000 LF

END ANCHOR-TYPE B 2.000 EA

END TERMINAL - TYPE T 34.000 EA

ADDITIONAL LENGTH GUARDRAIL POST 60.000 LF

PERMANENT GRASSING FOR SMALL PROJECTS 19.947 ACRE

Page 68: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 370 67Page:

South Carolina Department of Transportation 3/29/2018

5747510SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Allendale BambergBarnwell Hampton

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PPP (MICROSURFACING) -PRESERVATION

9/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

35.3400

P036923P036923PCN: Project No.:

P036926P036926PCN: Project No.:

P036948P036948PCN: Project No.:

P036950P036950PCN: Project No.:

P036952P036952PCN: Project No.:

P036967P036967PCN: Project No.:

P037000P037000PCN: Project No.:

P037004P037004PCN: Project No.:

P037008P037008PCN: Project No.:

P037010P037010PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 275.000 SY

MAINTENANCE STONE 7.500 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 750.000 SY

MILLED-IN RUMBLE STRIP 69.064 MI

MICRO SURFACING SURFACE COURSE 622,199.714 SY

MICRO SURFACING LEVELING 280.000 TON

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,376.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 18,094.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 362,730.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 351.000 LF

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 24,880.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 226,330.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 33,320.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 362,690.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 351.000 LF

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 1.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 47,890.000 LF

Page 69: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 370 68Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 386,970.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 835.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,931.000 EA

DETECTABLE WARNING MATERIAL 137.500 SF

PEDESTRIAN RAMP CONSTRUCTION 275.000 SY

SURFACE APPLIED DETECTABLE WARNING 160.000 SF

Page 70: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 380 69Page:

South Carolina Department of Transportation 3/29/2018

5747530SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: Calhoun ClarendonOrangeburg

DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 FA PPP (MICROSURFACING) -PRESERVATION

6/30/2019

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

25.0100

P037011P037011PCN: Project No.:

P037012P037012PCN: Project No.:

P037043P037043PCN: Project No.:

P037048P037048PCN: Project No.:

P037049P037049PCN: Project No.:

P037052P037052PCN: Project No.:

P037058P037058PCN: Project No.:

P037063P037063PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

REMOVAL & DISPOSAL OF EXISTING PAVEMENT 100.000 SY

MAINTENANCE STONE 11.260 TON

LIQUID ASPHALT BINDER PG64-22 8.820 TON

FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,126.000 SY

MILLED-IN RUMBLE STRIP 39.540 MI

HOT MIX ASPHALT SURFACE COURSE TYPE D 140.000 TON

MICRO SURFACING SURFACE COURSE 592,733.302 SY

PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 3,416.000 SF

4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 26,700.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 218,960.000 LF

24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 189.000 LF

WHITE SINGLE ARROWS (LT, STRGHT, RT) PERM.PVMT.MARKING 12.000 EA

WHITE WORD MESSAGE "ONLY" -PERM.PVMT.MARKING 1.000 EA

WHITE COMBINATION ARROWS(STR&RT.OR STR&LT)PERM.PVMT.MARKING 1.000 EA

RAILROAD CROSSING SYMBOLS - PERM.PVMT.MARKING 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC)PERM.PVMT.MARKING 29,360.000 LF

4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 210,470.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 52,340.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 220,030.000 LF

24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 189.000 LF

Page 71: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 380 70Page:

South Carolina Department of Transportation 3/29/2018

Description Quantity Units

WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA

WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 1.000 EA

WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 1.000 EA

RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA

4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 45,530.000 LF

4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 420,940.000 LF

4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 470.000 LF

4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 1,860.000 LF

4" YELLOW BROKEN LINES(GAPS EXC) EPOXY PAINT 470.000 LF

4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 1,860.000 LF

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,448.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 2,030.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 3,643.000 EA

DETECTABLE WARNING MATERIAL 50.000 SF

PEDESTRIAN RAMP CONSTRUCTION 100.000 SY

SURFACE APPLIED DETECTABLE WARNING 60.000 SF

Page 72: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

Call No.: 390 71Page:

South Carolina Department of Transportation 3/29/2018

5747910SC File NO(S).:

May 08, 2018

02:00 PM

Letting Date: CO(S).: DISTRICT7 DBE Goal Percent: 0.00%

Completion Date:

Description: 2018 RPMS ON PRIMARY AND SECONDARYROUTES - DISTRICT 7

10/31/2018

Cost of Road Plans:

Cost of X-Sections:

Cost of Proposal:

$0.00

$0.00

$15.00

Approx. Length (miles):

ITEMS OF WORK INCLUDE THE FOLLOWING:

Cost of BridgePlans: $0.00

Letting Time:

900.0000

P037180P037180PCN: Project No.:

Description Quantity Units

MOBILIZATION 1.000 LS

BONDS AND INSURANCE 1.000 LS

TRAFFIC CONTROL 1.000 LS

PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 15,015.000 EA

PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 6,875.000 EA

PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 75,075.000 EA

Page 73: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.

1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service.

2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice.

PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.

STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.

MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.

In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:

Page 74: SOUTH CAROLINA DEPARTMENT OF …info2.scdot.org/currentletting/ConstructionDocs/05082018 Notice to... · pcn: p030074 project no.: p030074 pcn: p032435 project no.: ... white combination

TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.

Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.

THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.

IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.

Prepared by L. Stuckey

Issued by:

J.Brian Parnell

Contract Administrator