South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues in South Africa with their counterparts from previous German Host Cities and other involved institutions - Agreed in Government negotiations of 2006 - Possibilities to cover all aspects of preparations - Co-operation between the German agencies to offer holistic approach in assistance

Upload: david-foster

Post on 05-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

The Program:

- InWEnt is a German government agency dealing with capacity building worldwide

- Co-operation between colleagues in South Africa with their counterparts from previous German Host Cities and other involved institutions

- Agreed in Government negotiations of 2006- Possibilities to cover all aspects of preparations- Co-operation between the German agencies to offer

holistic approach in assistance

Page 2: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

Challenges:

• World Cup is national event, covering the whole country• 6 weeks in total with 4 weeks of tournament• 3,2 million tickets representing 600.000 to 800.000 ticket holders plus additional fans – number unpredictable• Ticket holders, FIFA family, teams and fans traveling the entire country during the whole period of tournament• Emergency response capacity in general relatively small• Great diversity in emergency response capacity in different host cities• Large number of different parties involved in preparations – co-operation essential • The world is watching

Page 3: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

Generic risks of World Cup

• Large movement of people on roads and in the air• increased risk of accidents at airports and on roads• mass events at the same time in different venues• huge crowds in cities• increased number of “normal emergencies” (average of 2 ‰ treatments in sport events – 92 per 46.000 or 180 per 90.000)• experience in Germany 2006: number of daily routine emergency responses doubled during tournament without having significant incidents• in case of major incident the number of casualties is expected to be 2 % of participants (920 per 46.000)• attacks

Page 4: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

German support to Disaster Management RSA

• provision of expertise and experiences from previous World Cup• so far:

• assessment mission in January 2008• Disaster Management Workshop Durban 02/08• assistance to NDMC for National Strategy• co-operation for National Disaster Management Workshop of NDMC in April• participation in meetings of NDMC Working Group and Steering Committee

Page 5: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

German support cont.

• further planning

• provision of 300+ expert days until end of 2009 (will be extended in 2010) in co-operation between National Treasury, InWEnt and GTZ, funded by German Government

• participation in 5 day action planning conference

• participation in risk and vulnerability assessment

• support in training and exercise

• support in operational planning in Host Cities

• further support according to needs

Page 6: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

Remarks:

• lean command and control structure

• due to existing capacity, central intervention unit to reinforce units necessary – budget implications

• several exercises in each Host City and province necessary as on national level

• all activities lead to lasting legacy

• CO-OPERATION, CO-OPERATION, CO-OPERATION

Page 7: South Africa 2010 – Germany 2006 The Program: - InWEnt is a German government agency dealing with capacity building worldwide - Co-operation between colleagues

South Africa 2010 – Germany 2006

EXPECT THE UNEXPECTED

BE PREPARED FOR THE IMPOSSIBLE

Thank you

Michael Graef

Program Coordinator

076-262 9749

[email protected]