Head Loss Calculation Design Discharge 5.72  m³/s Normal Water Level at Weir 833.249 m Tailrace level 744.905 m Gross Head 88.344 m SN Description Units Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 1 FrictionLoss Discharge,Q m³/s 2.36 1.98 1.75 1.78 2.43 7.50 7.50 7.50 7.50 7.50 4.10 2.65 Number of Turbine operation 1.00 1.00 1.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 2.00 Diameter of pipe, D m 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 No. of pipes, N No. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Velocity m/s 1.17 0.98 0.87 0.89 1.21 3.73 3.73 3.73 3.73 3.73 2.04 1.32 Pipe length, L m 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 Head Loss m 0.22 0.16 0.12 0.13 0.24 2.26 2.26 2.26 2.26 2.26 0.68 0.28 To t al Fr i c t i on L oss m 0.22 0.16 0.12 0.13 0.24 2.26 2.26 2.26 2.26 2.26 0.68 0.28  2 Tur bul ence Loss 2. 1 Entr ance Loss Loss coeff. 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 Head Loss m 0.01 0.01 0.01 0.01 0.01 0.14 0.14 0.14 0.14 0.14 0.04 0.02 2.2 Bend Loss Radius of bend, r m 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 r/d 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 Bend angle (avg) deg 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Loss coeff. 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 No. of Bends 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Head Loss m 0.01 0.01 0.01 0.01 0.01 0.14 0.14 0.14 0.14 0.14 0.04 0.02 2.4 Va lve Los s Loss coeff. 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 Head Loss m 0.02 0.01 0.01 0.01 0.02 0.18 0.18 0.18 0.18 0.18 0.05 0.02 2.5 Exi t/Draft Tube Loss Loss coeff. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Head Loss 0.07 0.05 0.04 0.04 0.07 0.71 0.71 0.71 0.71 0.71 0.21 0.09 To t al Tu r b u l en ce L o s s es m 0.12 0.08 0.06 0.07 0.12 1.17 1.17 1.17 1.17 1.17 0.35 0.15  Head L oss b ef o r e Head Pon d m 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39  Total Head Loss 1.73 1.63 1.58 1.58 1.75 4.82 4.82 4.82 4.82 4.82 2.41 1.82 Net Head 86.61 86.71 86.77 86.76 86.59 83.52 83.52 83.52 83.52 83.52 85.93 86.53

Upload: vpamatya

Post on 13-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 1/14

Head Loss Calculation

Design Discharge 5.72  m³/s

Normal Water Level at Weir 833.249 m

Tailrace level 744.905 m

Gross Head 88.344 m

SN Description Units Jan Feb Mar Apr May June July Aug Sept Oct

1 FrictionLossDischarge,Q m³/s 2.36 1.98 1.75 1.78 2.43 7.50 7.50 7.50 7.50 7.50

Number of Turbine operation 1.00 1.00 1.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00

Diameter of pipe, D m 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60

No. of pipes, N No. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Velocity m/s 1.17 0.98 0.87 0.89 1.21 3.73 3.73 3.73 3.73 3.73

Pipe length, L m 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00 340.00

Head Loss m 0.22 0.16 0.12 0.13 0.24 2.26 2.26 2.26 2.26 2.26

Total Fric t ion Loss m 0.22 0.16 0.12 0.13 0.24 2.26 2.26 2.26 2.26 2.26

2 Turbulence Loss

2.1 Entrance Loss

Loss coeff. 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

Head Loss m 0.01 0.01 0.01 0.01 0.01 0.14 0.14 0.14 0.14 0.14

2.2 Bend Loss

Radius of bend, r m 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

r/d 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13 3.13Bend angle (avg) deg 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

Loss coeff. 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

No. of Bends 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

Head Loss m 0.01 0.01 0.01 0.01 0.01 0.14 0.14 0.14 0.14 0.14

2.4 Valve Loss

Loss coeff. 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25

Head Loss m 0.02 0.01 0.01 0.01 0.02 0.18 0.18 0.18 0.18 0.18

2.5 Exit/Draft Tube Loss

Loss coeff. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Head Loss 0.07 0.05 0.04 0.04 0.07 0.71 0.71 0.71 0.71 0.71

Total Turbu lence Losses m 0.12 0.08 0.06 0.07 0.12 1.17 1.17 1.17 1.17 1.17

Head Loss befo re Head Pond m 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39

Total Head Loss 1.73 1.63 1.58 1.58 1.75 4.82 4.82 4.82 4.82 4.82

Net Head 86.61 86.71 86.77 86.76 86.59 83.52 83.52 83.52 83.52 83.52

Page 2: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 2/14

Installed Capacity, kW 9,500 Rated Efficiencies

7.50  Generator

10% of minimum flow 0.195  Turbine

5% Transformer

160 Combined

Julian

Calendar 

No of

days

River

Discharg

e

Reparia

n Flow

Available

Flow

Plant

Flow

Net

Head

Combi

ned

Efficie

ncy Power  

Dry

season

energy

Wet season

energy Total Energy Outa

(m /s) (m /s) (m /s) (m /s) (m) % (kW) (kWh) (kWh) (kWh) (kW

Jan 31.00 2.55 0.19 2.36 2.36 151.00 85.54% 2,987 2,222,537 2,222,537 111

Feb 28.00 2.17 0.19 1.98 1.98 151.00 85.54% 2,509 1,685,809 1,685,809 84

Mar 31.00 1.95 0.19 1.75 1.75 151.00 85.54% 2,223 1,653,709 1,653,709 82

 Apr 30.00 1.98 0.19 1.78 1.78 151.00 85.54% 2,260 813,427 813,427 1,626,853 81

May 31.00 2.63 0.19 2.43 2.43 151.00 85.54% 3,084 2,294,156 2,294,156 114

Jun 30.00 8.25 0.19 8.06 7.50 151.00 85.54% 9,500 6,840,000 6,840,000 342

July 31.00 25.42 0.19 25.23 7.50 151.00 85.54% 9,500 7,068,000 7,068,000 353

 Aug 31.00 30.60 0.19 30.41 7.50 151.00 85.54% 9,500 7,068,000 7,068,000 353

Sept 30.00 23.27 0.19 23.07 7.50 151.00 85.54% 9,500 6,840,000 6,840,000 342

Oct 31.00 10.38 0.19 10.18 7.50 151.00 85.54% 9,500 7,068,000 7,068,000 353

Nov 30.00 4.29 0.19 4.10 4.10 151.00 85.54% 5,194 3,739,578 3,739,578 186

Dec 31.00 2.84 0.19 2.65 2.65 151.00 85.54% 3,352 1,247,106 1,247,106 2,494,211 124

365.00 9.70 Total 7,622,586 42,978,266 50,600,852 2,530

Plant FaDry season energy

Wet season energy

POWER AND ENERGY GENERATION

Sorun Khola Hydropow er Project 

7,241,457

40,829,352

Design discharge, m3/s

D/s release, m3/s

Total Annual Energy 48,070,809

Gross Head,m

Outage and Losses

Page 3: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 3/14

Summary of Flows by various Method

SN Month

WECS

Method

MHSP

Method MIP Method

 Adopted

 Average Flow

1 2 3 4 5 6

1 January 1.76  2.19  1.75  1.90 

2 February 1.50  1.79  1.32  1.54 

3 March 1.34  1.64  1.04  1.34 

4 April 1.36  1.97  0.78  1.37 

5 May 1.81  1.38  0.94  1.38 

6 June 5.69  6.29  5.66  5.88 

7 July 17.53  17.59  14.16  16.43 

8 August 21.11  21.39  21.25  21.25 

9 September 16.05  16.77  15.73  16.18 

10 October 7.16  8.06  7.08  7.43 

11 November 2.96  3.91  4.41  3.76 

12 December 1.96  2.54  2.36  2.29 

Adopted Flow = Average of (1,2,3)

Time Exceedence of Monthly Discharges at weir site

N Month Month

%

exceedence

Flow in the

river (cumec)

%

exceedenc

e

Reparian Flow

(cumec)

Flow Available

for Diversion

(Cumec)

1 8 August 8% 20.30 8% 0.12  20.18

2 7 July 17% 15.66 17% 0.12  15.54

3 9 September 25% 15.52 25% 0.12  15.40

4 10 October 33% 7.07 33% 0.12  6.95

5 6 June 42% 5.53 42% 0.12  5.41

6 11 November 50% 3.65 50% 0.12  3.53

7 12 December 58% 2.20 58% 0.12  2.08

8 1 January 67% 1.68 67% 0.12  1.56

9 2 February 75% 1.36 75% 0.12  1.24

10 5 May 83% 1.18 83% 0.12  1.06

11 3 March 92% 1.17 92% 0.12  1.05

12 4 April 100% 1.17 100% 0.12  1.05

5.84  cumecs

5.72  cumecs

5.72  cumecs

Flow in the river with 40% exceedence

Flow available for diversion with 40% exceedence

Flow to be diverted

Page 4: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 4/14

 -

 5.00

 10.00

 15.00

 20.00

 25.00

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Flow Duration Curve

Flow Duration Curve

Page 5: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 5/14

Flow Estimation Using WECS 1990 Method

Mean Flow at Weir Axis

Total Catchment Area 137.22  sqkm

Catchment Area Below 5000m 137.08  sqkm

Monsoon Index at Centroid 1,000 mm factor  

Mean Monthly Flows 1.45

Jan 1.76  cum/s 2.552576486

Feb 1.50  cum/s 2.17482054

Mar 1.34  cum/s 1.949165134

 Apr 1.36  cum/s 1.978202292

May 1.81  cum/s 2.628549266

Jun 5.69  cum/s 8.250738956Jul 17.53  cum/s 25.42447484

 Aug 21.11  cum/s 30.60410761

Sep 16.05  cum/s 23.26732504

Oct 7.16  cum/s 10.3767693

Nov 2.96  cum/s 4.294079663

Dec 1.96  cum/s 2.840767579

 -

 5.00

 10.00

 15.00

 20.00

 25.00

   M  e  a  n   F   l  o  w

   (  c  u  m   /  s   )

Months

Page 6: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 6/14

Medium Hydropower Study Project (NEA 1997) Method

Mean Flow at Weir Axis

137.22  Km2

1,000 mm

Far Western

MHSP prediction equation constants for mean flow

Month C A1 A2

Jan 2.19 m3/s January 0.03117 0.8644 0

Feb 1.79 m3/s February 0.02417 0.8752 0

Mar  1.64 m3/s March 0.02053 0.8902 0

Apr  1.97 m3/s April 0.01783 0.9558 0

May 1.38 m3/s May 0.01193 0.9657 0

Jun 6.29 m3/s June 0.01135 0.9466 0

Jul 17.59 m3/s July 0.01641 0.9216 0

Aug 21.39 m3/s August 0.02592 0.9095 0

Sep 16.77 m3/s Septrmber  0.02206 0.8963 0

Oct 8.06 m3/s October  0.01504 0.8772 0

Nov 3.91 m3/s November  0.00792 0.8804 0

Dec 2.54 m3/s December  0.00538 0.8890 0

Mean monthly flow analysis

Catchment area

Mean monsoon precipitation

Region

0.00

5.00

10.00

15.00

20.00

25.00

   M  e  a  n   F   l  o  w

   (  c  u  m   /  s   )

Months

Page 7: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 7/14

Flow Estimation Using MIP Method for Correlation

Mean Flow at Weir Axis

Total Catchment Area 137.22  sqkm

MIP Region 2 

Mean Monthly Flows

Jan 1.7451  cum/s

Feb 1.3244  cum/s

Mar 1.0362  cum/s

 Apr 0.7791  cum/s

May 0.9427  cum/s

Jun 5.6639  cum/sJul 14.1637  cum/s

 Aug 21.2455  cum/s

Sep 15.7296  cum/s

Oct 7.0818  cum/s

Nov 4.4070  cum/s

Dec 2.3606  cum/s

 -

 5.0000

 10.0000

 15.0000

 20.0000

 25.0000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

   M  e  a  n   F   l  o  w

   (  c  u  m   /  s   )

Months

Page 8: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 8/14

Summary of Floods by Various MethodSn Return Period High Flood Value Adopted Design

MHSP WECS Flood

1 2 Q2 142.26 142.26

2 5 Q5 142.84 231.36 231.363 10 Q10 298.30 298.30

4 20 Q20 216.81 367.88 367.88

5 50 Q50 271.61 465.91 465.91

6 100 Q100 318.46 545.17 545.17

7 200 Q200 629.85 629.85

8 500 Q500 749.88 749.88

9 1000 Q1000 508.90

10 10000 Q10000 764.73

Method

545.17

Page 9: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 9/14

Medium Hydropower Study Project (NEA 1997) Method

Inputs are

137.22  Km2

1,000   mm

western

Regression coefficients for regional analysis of flood peaks

Analysis of flood

Q5year   142.84   m3/s

Q20year   216.81   m3/s k b k b

Q50year   271.61   m3/s   5 2.0409 0.8632 1.6762

Q100year   318.46   m3/s   20 3.2895 0.8510 3.2303

Q1000year   508.90   m3/s   50 4.2570 0.8444 4.6090

Q10000year   764.73   m3/s   100 5.2225 0.8352 5.9865

1000 9.2270 0.8148 12.6603

  10000 14.4580 0.8063 24.6431

Catchment area

Mean monsoon precipitation

Region

Return period

Regio

Western Cent

Page 10: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 10/14

Birendranagar Water Supply and Sanitation Project

Estimation of Flood Discharge

River 

Locat ion :

1) Water and Energy Commission Secretar ia t Method (WECS 1990 Method) 

Catchment Area Below 3000m A = 137.08 Sqkm

Two Year Flood Q2 1.8767(A+1).

= 142.26 cum/s

Hundred Year Flood Q100 14.63(A+1)0.7342

= 545.17 cum/s

Standard Deviation of Natural Log s ln (Q100/Q2)/2.326 = 0.57758

Return

Periods

(T)

2 Q2 QR=exp(lnQ2+s*s) 142.26

5 Q5 QR=exp(lnQ2+s*s) 231.36

10 Q10 QR=exp(lnQ2+s*s) 298.30

20 Q20 QR=exp(lnQ2+s*s) 367.8850 Q50 QR=exp(lnQ2+s*s) 465.91

100 Q100 QR=exp(lnQ2+s*s) 545.17

200 Q200 QR=exp(lnQ2+s*s) 629.85

500 Q500 QR=exp(lnQ2+s*s) 749.88

2.054

2.326

2.576

2.878

Flood Flows (QR)

Standardiz

normal Varia

0.000

0.842

1.282

1.645

Page 11: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 11/14

Rating Curve

Weir Axis

Depth Elevation A P R S n V Q

(m) (m) (sqm) (m) (m) (m/s)

(cum/s)

x1000

8.000  1199.845 198.540  49.120  4.0419 0.0595 0.0740 8.369 1.66

7.000  1198.845 156.770  42.890  3.6552 0.0595 0.0740 7.827 1.23

6.000  1197.845 124.010  33.470  3.7051 0.0595 0.0740 7.898 0.98

5.000  1196.845 95.190  30.650  3.1057 0.0595 0.0740 7.021 0.67

4.000  1195.845 68.170  27.890  2.4442 0.0595 0.0740 5.985 0.408

3.000  1194.845 43.570  23.740  1.8353 0.0595 0.0740 4.944 0.22

2.000  1193.845 23.150  18.610  1.2440 0.0595 0.0740 3.815 0.09

1.000  1192.845 7.850  12.380  0.6341 0.0595 0.0740 2.434 0.02

-  1191.845 0.00

1191

1192

1193

1194

1195

1196

1197

1198

1199

1200

1201

0.0 0.5 1.0 1.5 2.0

   E   l  e  v  a   t   i  o  n   (  m   )

Discharge (cum/s x1000)

Rating Curve (Weir)

Page 12: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 12/14

Rating Curve

Powerhouse Axis

Depth Elevation A P R S n V Q

(m) (m) (sqm) (m) (m) (m/s)

(cum/s)

x1000

4.000  550.215 1,394.580 414.340 3.3658 0.0097 0.0400 5.5299 7.71

3.000  549.215 985.180  411.660 2.3932 0.0097 0.0400 4.4053 4.34

2.000  548.215 577.100  408.980 1.4111 0.0097 0.0400 3.0976 1.79

1.000  547.215 182.090  339.630 0.5361 0.0097 0.0400 1.6250 0.30

-  546.215 0.00

546

547

548

549

550

551

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0

   E   l  e  v  a   t   i  o  n   (  m   )

Discharge (cum/s x1000)

Rating Curve (Powerhouse)

Page 13: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 13/14

River Hydrology(River Flow Calculation) WECS Method

Low Flow Calculation

Return

Period

(Years)

Duration

(Days)

Constant

(Coeffi-

cient)

Coeffi-cientof Indepen-

dent

Varibals

CatchmentArea below

5000m

(Sqkm)

Discharge

(m3 /sec)

Discharge

(lps)

Period (Days) Coefficeint f Independent Area (m3/s) (lps)

(Years) variable (Sqkm)

20 Monthly 0.03059 0.08284 137.22  1.009 1009

10 Monthly 0.07490 0.08480 137.22 1.149 1149

2 Monthly 0.09299 0.09269 137.22 1.399 1399

Page 14: Sorun Hydrology

7/27/2019 Sorun Hydrology

http://slidepdf.com/reader/full/sorun-hydrology 14/14

Prediction of Sediment

Himalayan Sediment Yield (HSY) Technique (Galay, 1987)

Yield (Specific)

SN Physiographic Zone Elevation

SpecificSediment Yield

(ton/km2/year   Area sqkm Zsy

1 High Himalayas Above 6000m 500 4.21 2105

2 High Mountain 3500-6000 2500 145 362500

3 Middle Mountain 1000-3500 5000 444.86 2224300

4 Siwalik 500-1000 7500 39 292500

Total Sediment yield,Sy 2881405

Total Sediment yield/sqkm 4551.479299 ton/sqkm/year