solving of energy problems

26
ENERGY MANAGEMENT IN SAVINJSKA, ŠALEŠKA AND KOROŠKA REGION Boštjan KRAJNC Energy Agency KSSENA Bratislava 20th of June, 2011

Upload: ovidio

Post on 15-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

ENERGY MANAGEMENT IN SAVINJSKA, ŠALEŠKA AND KOROŠKA REGION Boštjan KRAJNC Energy Agency KSSENA Bratislava 2 0th of June, 2011. Solving of energy problems. Reducing the impact of Climate Changes : Rational use of energy Renewable energy sources Energy management. Municipality Commitment. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Solving of energy problems

ENERGY MANAGEMENT IN SAVINJSKA, ŠALEŠKA AND KOROŠKA REGION

Boštjan KRAJNCEnergy Agency KSSENA

Bratislava 20th of June, 2011

Page 2: Solving of energy problems

Solving of energy problems

Reducing the impact of Climate Changes:

•Rational use of energy

•Renewable energy sources

•Energy management

Page 3: Solving of energy problems

Municipality Commitment

Commitment of municipality:

To create adequate administrative structures in municipalities:

Page 4: Solving of energy problems

Definition of Energy goals

• Reduction of costs and energy use in public sector• Reduction of green-house-gas (GHG) emissions • Development and implementation of innovative products

and services• Implementation of pilot or demonstrative projects• Gain of non-refundable funds• Stimulate the private and industrial sector to increase RES

and RUE• Encouragements for inflow of capital for investment

projects• Rise of energy culture of general and expert public• Rise the awareness on energy issue

Page 5: Solving of energy problems

Development of Energy Management

Adequate administrative structures in municipality:

•Energy manager (internal or external expert organization; Energy manager has specific hierarchic position)

•Direct link with decision makers: Mayor, Head of Department of Works and Services, Head of Mayor‘s office, etc;

•Cooperation with Department of Economy and Finance (possibilities of investments, budget, etc);

Page 6: Solving of energy problems

The role of the energy manager

Role of the energy manager – full time:•Analyses of energy supply, consumption and costs (Secure, stabile and quality of energy supply);•Preparation of RES and RUE measures (Energy Action plan – Energy concept);•Communication between decision makers and maintainers, accouters, etc;•Energy audits•Measurements of the Environmental impacts;•To create long-term strategy on energy management;•Monitoring - Energy bookkeeping•Education, motivate and raise the awareness of all employees;

Page 7: Solving of energy problems

Sharing of local/regional energy agency with other cities

Local or regional Energy Agency:

-Many similar action;

-Sharing of costs;

-Transfer of know – how between municipalities;

-Exchange of experiences

Page 8: Solving of energy problems

Financial mechanisms to facilitate energy management in public sector

- Own resources (budget)

- Private – public partnership

- Credit (Commercial banks, Eko sklad, etc)

- ESCO model – (Energy Performance Contracting EPC) problem of Municipalities‘ volume of borrowing

- National and EU founds (ELENA, IEE, IPA, Objective 3, Cohesion founds, etc)

Page 9: Solving of energy problems

Motivation of employees on energy issue

• Seminars, workshops;• Energy certificate;• Energy bookkeeping;• Energy stickers• Brochures, leaflets, etc

Page 10: Solving of energy problems

Energy Strategy

Municipality with no strategy:

-Action plan not-created or created but weak execution

-No specific plans (in general only – like more implementation of RES);

-No sequence of action (reconstruction of heating system before of general adaptation);

-No responsible person or department for measures of RES and RUE

-The lack of founding the projects

Municipality with strategy :

-Energy Programs are sustainable and efficient: public lightening, public buildings and public transport;

-Many weak points identified during the implementation;

-Many actions done to reduce energy consumption;

-Many pilot projects (PV street lights; CHP in public buildings, PV power plant in public buildings, etc)

Page 11: Solving of energy problems

Energy strategy

Benchmarking analyses of 3 municipalities with different strategies

Page 12: Solving of energy problems

Energy Act

- All public buildings with over 500 m2 of netto heat surface

ENERGY BOOKKEEPING

MAIN FUNCTIONS:- mangers recognize their consumption;

invoice management (advanced energy bookkeeping),- energy and financial data management,- analysis,- financial and energy planning,- energy and financial reports,- financial and energetic planning for energy efficient measures,- monitoring,- all your buildings connected in one comprehensive energy- informational system.

Page 13: Solving of energy problems

Energy certification - Comparison of CO2 emissions between 2008 and 2010

Page 14: Solving of energy problems

Energy certification

Total energy savings -1,03 %

Page 15: Solving of energy problems

Energy management of Velenje, Celje and Slovenj Gradec municiplities

• 2004: Energy concept of MO Velenje, Celje and Slovenj Gradec;• 2006: Establishing of Energy Agency KSSENA, within the framework of

Intelligent Energy Europe (IEE);• Number of employees: 6• Founders: Municipality of Velenje (MOV), Municipality of Celje (MOC),

Municipality of Slovenj Gradec (MOSG) and Public utilities company (KPV);• 2007 – 2011:

- Operational plan for energy reconstruction of public lightening in MO Velenje and Slovenj Gradec;

- Energy audits, analyses, energy bookkeeping, energy reports (consumption and costs), etc;

- Action planned for RES and RUE;- Implementation of RES and RUE process.

Page 16: Solving of energy problems

Working fields of KSSENA

Page 17: Solving of energy problems

ENERGY RECONSTRUCTION OF PC RUDARSKI DOM

Investment: € 2,117,514European Regional Development Fund: € 1,603,355 (75%)Own funds Velenje: € 514,159 (25%)

Page 18: Solving of energy problems

CHP OF POŠ ŠKALE

- BeforePreliminary heating: Fuel oil (consumption over 20.000 l)

Obsolete and outdated boilerEnergy number :> 200kWh/m2 (in 2007)

- Reconstruction of heating systemImplementation of cogeneration of heat and power system

2 units (5.5 kWe and 12.5 kWh)

Other Reconstructions:Replacement windowsReplacing the doorReplace blinds

Page 19: Solving of energy problems

PV power plant: Municipality of Velenje

Installed Power: 17.4 kWpEstimated annual electricity production: 17.4 MWhEstimated annual production in EUR: € 6,600The completion of works: July 2010

Strojnica

56 sq m

Zidak

1 sq m

Zidak

1 sq m

Zidak

1 sq m

zidaki

1 sq m

27

00

0,0

0

14800,00

Page 20: Solving of energy problems

PV power plant: Primary school Livada

Installed Power: 49.68 kWpEstimated annual electricity production: 50 MWhEstimated annual production in EUR: € 19,000The completion of works: December 2010

Page 21: Solving of energy problems

MFE na Gustava Šiliha

Installed Power: 46 kWpEstimated annual electricity production: 46 MWhEstimated annual production in EUR: € 18,000The completion of works: December 2010

Page 22: Solving of energy problems

Street lighting:DEMO PROJECT „Energy self-sufficient STREET LIGHTING

5 street lights with PV and wind energy supply5 street lights with PV and wind energy supply

Created by: Uroš Cerkovnik

Page 23: Solving of energy problems

Street lighting :PV lights

Illuminating the pavement, where the power is regulated by photovoltaic panelsLength of route: 450 mNumber of lamps: 3Lamp: LED LSL 30Pillar height h = 7 mRechargeable Batteries: 2x40 AhPhotovoltaic Panel: 85 WpInverter power: 75 W

Page 24: Solving of energy problems

Municipality of Velenje and Covenant of Mayors

• March 2010: presentation of Action plan to Mayor of Velenje

• April 2010: presentation of Covenant of Mayors and Action plan to Velenje City Council

• May 2010: Signature of covenant of Mayors in Brussels

• June 2011: SEAP confirmed by City council

Page 25: Solving of energy problems

On – going EU projects: Cyber Display (IEE)

RegCEP (IEE)

EnergyCity (CE)

EuroNET 50/50 (IEE)

MOVE (SI-AT )

Prometheus (IEE)

Page 26: Solving of energy problems

Tel.: +386 3 8961 520Fax.: +386 3 8961522

[email protected]

THANK YOU

[email protected]