A Presentation on Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION LIMITED 28 January 2020

Upload: others

Post on 31-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

A Presentation on

“Solarization of Modhera Sun Temple & Town”Pre-bid conference

By:

GUJARAT POWER CORPORATION LIMITED

28 January 2020

Page 2: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Objectives of the Proposed Project

► To make Sun Temple Town of Modhera, a model town drawing its energy requirements completely from Solar Power.

► Develop Modhera into an ‘Energy-Resilient’ and ‘Net Solar Energy Positive’ - potentially using Solar Energy based Technology

► To Demonstrate next-generation and relevant energy technologies to visitors.►Use of solar photovoltaic (PV)

►Utility-scale energy storage mainly Solar Energy

► Electrical Vehicle Charging Station based on Solar Energy

►Micro-grid and Smart Energy Center (i.e. smart metering, grid balancing, real-time demand-side management, etc.)

2Solarization of Modhera Sun Temple & Town,

Page 3: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

GEOGRAPHICAL LOCATION

3

Mehsana

Gujarat

MODHERA SUN TEMPLE & TOWN

Solarization of Modhera Sun Temple & Town,

Distances

Ahmedabad – 100 kMGandhinagar – 88 kMMehsana -- 24 kMAirport -- 94 kM

Page 4: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Modhera – Historical Iconic Town

4

► The Sun Temple is a Temple dedicated to the solar deity “SURYA”.

►An iconic Symbol of “Solar Energy”

► Location:

►Village: Modhera Village

► Taluka: Becharaji

►District: Mehsana

► State: Gujarat

► Coordinates:

►N 23˚35’0.47”

► E 72˚08’ 33”

Solarization of Modhera Sun Temple & Town, 20 Nov. 2019.

Page 5: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Modhera – An Airal View

5Solarization of Modhera Sun Temple & Town, 20 Nov. 2019.

2011 Census Code 509572

Postal Code 384212

Total Area 2436 Ha.

Total Populations 6373 Nos.

Nos. of Households 1372 Nos.

Primary School 4 Nos.

Secondary School 1 No

Higher Sec. School 1 No

PHC 1 No

PHS 1 No

Dispensory 1 No

Page 6: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

Energy & Petrochemicals Department

2 No x 3 MW SPP and 2 Nos x 7.5 MWh BESS

Located at Village Sujanpura

50 kW + 150 kWh SOLAR CHARGING STATION

-CUM- SMART ENERGY CENTERLocated Nr. Modhera Temple

11 KV External Grid

Remote RMU located in 66/11/Modhera S/S(Considered as Part of Feederupgradation )

Modhera Solarisation Project Objective – Technical Target

LOAD

Modhera

11 kV 230/400 Volt

Page 7: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

Energy & Petrochemicals Department

(1) Psolar + Pbess ≥ Lmodhera

(2) Isolar + Ibess + Igrid ≥ Imodhera where Igrid ≤ 0

(3) isolar + ibess + igrid ≥ imodhera where igrid ≤ 0

Project Technical Objective

Modhera Solarisation Project Objective – Technical Target

(4) isolar + ibess = imodhera where igrid = 0, vgrid = 0,

tilla) Grid is revived/restored ORb) Psolar + PBESS sustain the load, which ever is earlier

Psolar = Power generated by Solar Systems

Pbess = Power Discharged by Battery

Energy Storage System

Lmodhera = Non Agriculture (NA) plus

Agriculture (AG) Load of Modhera Village

Isolar = Current from Solar System,

Ibess = Current from BESS

Igrid = Current from 11KV Busbar ( If

supplied to P&T JGY feeder, then +VE)

where Vgrid = Voltage ( At 11 kV busbar)

For this project, Bidder have option to comply the condition

(A) Round the clock i.e within 24 Hrs

Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA + AG

OR

(B) Day Time & Night time

Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA + AG ( Day time)

Psolar + Pbess ≥ Lmodhera Where Lmodhera = NA ( Night Time)

Page 8: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Modhera : Load ( Electricity ) Profile

Name of sub station 66 KV

MODHERA S/S

Nos & Name of Villages connected MODHERA

Length of HT Line Main + tap 5KM

Length of LT Line 9KM

Name of the 11 kV feeder on which 6 MW

+15 MWh BESS is connected

Modhera P&T JGY Feeder

Connected Load on Modhera P&T Feeder 3192 KW

2/3/2020 8

Load CategoryNos of

ConsumersLoad (KW)

Non- Agricultural 1709 3192

Agricultural 67 2751

HT 3 1500 *

EHT 2 13275 *

Total 1781 20718

* Not considered for this project

Page 9: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Modhera P & T JGY Feeder -Electricity Load Curve

0

50

100

150

200

250

300

350

400

450

500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

kW

Daily Load curve

14/05/2016

25/08/2016

07/11/2016

30/01/2017

2/3/2020 9

Page 10: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

2 KM

PRESENT POWER DISTRIBUTION SYSTEM (HVDS)

66/11 MODHERA KV S/S

Conventional Meter

Residential/Commercial Consumer

Modhera :Present Distribution System

Page 11: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

MODHERA SOLARISATION PROJECT : Technical Presentation

WEATHER

STATION

2 KM

SMT MTR

ROOFTOP SOLAR

66/11 KV S/S

BESS

SOLAR PROJECT

SMART ENERGY CENTER CUM CHARGING STATION

Remote controlled Switching RMU S/S

400 Volt cable/s

( N+1) theory11 kV P&T JGY FEEDER

Page 12: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Distance & Area Details

12Solarisation of Modhera Temple and Town Date : 28-01-2020

Sujanpura Village

Modhera Village

Sun Temple

66/11 kV Modhera S/S

2 x 3 MW SPP x 7.5 MWh Project site

Cable Route -1: 5 KM

Cable Route -2: 8 KM

S.N. Particulars

1 Village Name : SUJANPURA

2 Survey Numbers Selected : 499 & 500

3 Area Available : 23.91Ha(499) &20.09Ha(500)

4 Distance from ModheraSubstation

: 3.9 km

5 Location Coordinates : 23⁰33’09.0” N

72⁰08’18.0” E

Page 13: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Smart Energy Center –cum- Solar Charging Station

13Solarisation of Modhera Temple and Town Date : 28-01-2020

Charging Station to be connected with nearest Distribution Transformer at 230/400 V level with sufficient protection system. Maximum Distance is 200 Mtr

Page 14: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

Remote Switching System : Configuration

14Solarisation of Modhera Temple and Town Date : 28-01-2020

Existing 11 KV Busbar of 66/11 KV Modhera S/S

Existing 11 KV Modhera P& T Feeder

P &T JGY Modhera

Feeder

2 x 3 MW SPP x 7.5 MWh BESS

Remote controlled Switching Ring Main

Unit within premise of 66 KV/11

Modhera S/S, with provision of Interlock,

Vacuum breakers, isolators, Controlling

& Measuring CT & PT, all protection

system like overload, over voltage, fault

current protection bypass locking etc,

Having Communication and control

point , with all weather enclosure and

complying to relevant Indian

Standard/s

Page 15: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

“Solarisation of Modhera Sun Temple & Town”Major Project Components

15

Sl. No. Type and Capacity of RE Installation Proposed by MNRE

1 6 MW ground-mounted solar PV power plant

2 271 nos. x 1KW Rooftop Solar PV Systems

3 100 kW aggregate capacity of Rooftop Solar PV Systems on Govt. Buildings

4 15 MWh, 6MW, Battery Energy Storage System (BESS)

5 --------

6 304 nos. of Solar Street Lights ( Retrofitting of 12 Watt LED)

7 Smart Energy Components• Advanced metering infrastructure (AMI) and distribution automation

(Establishment of Smart meters at about 1600 Connections & Setting SEC)• Solar Based EV Charging Station - Solar charging station at 230/400 Volt level)• Modhera Grid Up-gradation and Modernization ( Establishment of RMU at GETCO

S/S and Smartmeter at Distribution Transformer level )

8 ----------

Solarization of Modhera Sun Temple & Town, .

Page 16: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

“Solarisation of Modhera Sun Temple & Town”Major Project Components

16

Sl. No. Component Requirement

1 6 MW ground-mounted solar PV

power plant

- State of the art, efficient, ergonomicallygood looking 2 x 3 MW SPP as specified intender

2 271 nos. x 1KW Rooftop Solar PV

Systems

- Establishment of 271 Nos Rooftop SolarPV system with strong data communicationsystem

3 100 kW aggregate capacity of

Rooftop Solar PV Systems on

Govt. Buildings

- Establishment of 100 kW Nos of RooftopSolar PV system on Govt. Building

4 15 MWh, 6MW, Battery Energy

Storage System (BESS)

- State of the Art, efficient, long lasting 2 x7.5 MWh BESS

5 --------

6 304 nos. of Solar Street Lights

( Retrofitting of 12 Watt LED)

- Retrofitting of existing Tubelights

Solarization of Modhera Sun Temple & Town, .

Page 17: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

03-02-2020

“Solarisation of Modhera Sun Temple & Town”Major Project Components

17

Sl. No. Component Requirement

7 Smart Energy Components

(a) Advanced metering

infrastructure (AMI) and

distribution automation

Establishment of Smartmeter on every connection ( aprox. 1700 Nos. ) with strong and efficient data communication system

Establishment of Smart Energy Center (SEC) to monitor all components of entire projects at single location as well as to display important parameters to Public at a large in vernacular language ( Hindi, Gujarati & English)

(B) Solar Based EV Charging

Station

Establishment of State-of the Art Charging Station with Solar Panels

(C) Modhera Grid Up-

gradation and

Modernization

Establishment of Remote controlled Switching unit , with provision of VAR Controller, within 66/11 kV S/S under compliance of Indian Electricity Codes, in consolation with GETCO

Note :(1) The building of Solar Charging Station and Smart Energy Center may be one only. SEC may/may not do controlling activity but

it must accumulate all information from all components of the project .(2) There must be one large display screen( Not less then 8” x 6” ) for public at a large for information(3) The data communication amongst all equipments is very important. Successful EPC Contractor must develop strong data

communication system with necessary back up.(4) All visible structure / building must have good Architectural design, good ergonomic view complying to all relevant standard.

Solarization of Modhera Sun Temple & Town, .

Page 18: Solarization of Modhera Sun Temple & Town” Pre-bid conference · A Presentation on “Solarization of Modhera Sun Temple & Town” Pre-bid conference By: GUJARAT POWER CORPORATION

Thanks and End of A Presentation on