Acknowledgements First and foremost, I would like to Thank to my Professor of Project Management, Dr. Ali Ahsan for the valuable guidance and advice. He inspired us greatly to work in this project. His willingness to motivate us contributed tremendously to our project. I wish to express my cordial gratitude to the all peoples who have played a crucial role in the research for this project, without their active cooperation the preparation of this project could not have been completed within the specified limit. The next person I would like to acknowledge is my project guide Mr. Arif Mehmood who supported me throughout this project with utmost cooperation and patience. Finally, an honorable mention goes to my family and friends for their understandings and supports on me in completing this project. Without helps of the particular that mentioned above, I would face many difficulties while doing this project. 1

Upload: hagi-sahib

Post on 16-Dec-2014

8.427 views

Category:

Technology


86 download

DESCRIPTION

solar street light project report.

TRANSCRIPT

Page 1: solar street light project report

Acknowledgements

First and foremost, I would like to Thank to my Professor of Project Management, Dr. Ali Ahsan for the valuable guidance and advice. He inspired us greatly to work in this project. His willingness to motivate us contributed tremendously to our project.

I wish to express my cordial gratitude to the all peoples who have played a crucial role in the research for this project, without their active cooperation the preparation of this project could not have been completed within the specified limit.

The next person I would like to acknowledge is my project guide Mr. Arif Mehmood who supported me throughout this project with utmost cooperation and patience.

Finally, an honorable mention goes to my family and friends for their understandings and supports on me in completing this project. Without helps of the particular that mentioned above, I would face many difficulties while doing this project.

1

Page 2: solar street light project report

Executive Summary

This is a hypothetical project. The purpose of this project is to develop the project planning and initiation phase to understand how a project is carrying on, completed and what is required to complete it. The MTA Corporation (hypothetical company) is a company which produces and installs solar street lights. MTA Corporation is currently doing a project of installing solar street lights for the Government of Pakistan in the Capital city Islamabad. The whole project is developing on hypothetical assumptions. The sponsors’’ of this project are; Government of Pakistan, World Bank, UN and UNICEF.

Reasons for installing Solar Street Lights in Pakistan are; Pakistan is going through many critical problems and one of them is energy problem, which is effecting the growth and development of the economy. Pakistan has a lot of resources to produce electricity from different alternatives plans. For that reason we done analysis of the market and analyze that the people are anxious and willing to reduce the energy crisis from the country as well as the Government of Pakistan is looking/ finding ways to resolve the crisis by developing rental electric power grids program temporarily that is costly. As in the market till now no one has proposed solar street lights project to the Government of Pakistan which can help them to reduce the energy Problem. Government of Pakistan accepted the project proposed by the MTA Corporation of installing Solar Street lights in the Capital city Islamabad to cater the energy crisis.

Different plan are made to ensure that who, what, where, when, why and How will be recognize and explained.

2

Page 3: solar street light project report

Table of Content

Table of ContentsAcknowledgments…………………………………………………………………………………………………………………………………..1

Executive Summary…………………………………………………………………………………………………………………………………2

Table of Content……………………………………………………………………………………………………………………………………..3

Project Charter ………………………………………………………………………………………………………………………..……..……5

Objectives

Deliverables/ Millstones’

Stakeholders’

Assumptions

Risks

Decision Making Process

Project Cost

Project Plan………………………………………………………………………………………………………………………….………………8

General Information

Project Information

Technology

Environmental and Social Impact

Benefits of Solar Street Lights

Milestones

Costing & Budgeting

Scope Statement……………………………………………………………………………………………………………………..…….…13

Stakeholders’ Register……………………………………………………………………………………………………………………..15

Human Resource Management Plan………………………………………………………………………………………………..16

3

Page 4: solar street light project report

Communication Management Plan……………………………………………………………………………………………….……21

Procurement Management Plan………………………………………………………………………………………………………..22

Quality Management Plan…………………………………………………………………………………………………………….…...26

Risk Management Plan………………………………………………………………………………………………………………….……28

Conclusion……………………………………………………………………………………………………………………………………..…..29

4

Page 5: solar street light project report

PROJECT CHARTER

Tagline: - You pay LESS MONEY for MORE LIGHT with Solar Street Lights.

Mission:-

MTA Corporation aim “Towards provide alternative solar energy solutions for domestic, industrial and commercial establishments in order to mitigate the energy problems in Pakistan”.

Objectives:-

Solar energy is a very useful renewable source of energy, which may be the answer to the future for power, or energy needs, as global warming seems to pick up rapidly. So, we can all contribute to the environment by using solar energy thus erasing or trimming down various gas emissions, which can endanger earth, in turn, the millions of people in it. By installing solar street lights in the Capital city of Pakistan, it will help to reduce the energy crisis. The installation cost of Solar Street light is less than the Traditional Street lights installing and maintenance cost. So, by installing Solar Street lights, it will help to boost the economy of Pakistan.

Deliverables/ Milestones:-

Less Cost, No electric current is required, high quality solar street lights, easy to maintain, Heavy Duty 1/8 Aluminum with welded seams and rubber mats, Heavy duty front door with stainless steel hinges, gaskets and lockable, No sharp edges on enclosure door, 24 volt 10 amp controller, Field adjustable for on/off times, Settable for gel cell battery charge curve to ensure performance and autonomy, Pulse Width Modulation charge regulation, Factory mounted in battery box, Controller automatically adjusts for seasonal light changes, Extends battery life, reduces deep discharge cycling and enhances autonomy.

Stakeholders’:-

Stakeholders’ of the project are Ministry of Finance, World Bank, UNO, and UNICEF, Project team of MTA Company, CDA, and Government of Pakistan.

5

Page 6: solar street light project report

Assumptions:-

Project will be a successful one, because each stakeholder (Govt. of Pakistan, UN, World Bank) is united and putting their whole lot of efforts to make this project a successful one. Economy will be improved; investors’ will invest and so forth.

Risks:-

Solar electricity and heat are not available at night and also may not be accessible in case of bad weather conditions. So, a solar or complementary power station is required which maybe a problem for many locations.

Solar panels require a large area for installation in order to achieve a good level of efficiency. Besides the solar energy can also be influenced by the presence of water vapor, pollution etc. in the air, which may cause complexities.

Considerable amount of energy is lost when DC (direct current) has to be converted to AC (alternating current). The solar cells can only produce DC, thus the conversion by help of Grid-Tie Inverters incurs a loss of about 4-12%.

Decision Making Process:-

Decision will be taken with the agreement of the stakeholders’ and will be approved by the CEO of the company.

6

Page 7: solar street light project report

Project Cost:-

Cost of the project is determined through the documents construct in the project.

Activities:

Procurement of Required Material

Project Initiation

Define Scope

Project Schedule

Estimated Cost & Budgeting Plan

Document Project Support Plans

Project Quality

Project Human Resource Management

Develop Procurement Plans

Set Up Project Environment

Human Resource Management

Assembling of Solar lights

Installation of Solar Street Lights

Maintenance

Monitoring and Controlling

Estimated Total Cost= "Rs36, 041,827.15"

7

Page 8: solar street light project report

Project Plan

GENERAL INFORMATION

Project sponsors and partners are;

Government of Pakistan

World Bank

UN

UNICEF

Suppliers’

PROJECT INFORMATION

This is a hypothetical project. The purpose of this project is to develop the project planning and initiation phase to understand how a project is carrying on, completed and what is required to complete it. The MTA Corporation (hypothetical company) is a company which produces and installs solar street lights. MTA Corporation is currently doing a project of installing solar street lights for the Government of Pakistan in the Capital city Islamabad. The whole project is developing on hypothetical assumptions.

Pakistan is going through many critical problems and one of them is energy problem, which is effecting the growth and development of the economy. Pakistan has a lot of resources to produce electricity from different alternatives plans. For that reason we done analysis of the market and analyze that the people are anxious and willing to reduce the energy crisis from the country as well as the Government of Pakistan is looking/ finding ways to resolve the crisis by developing rental electric power grids program temporarily that is costly. As in the market till now no one has proposed solar street lights project to the Government of Pakistan which can help them to reduce the energy Problem. Government of Pakistan accepted the project proposed by the MTA Corporation of installing Solar Street lights in the Capital city Islamabad to cater the energy crisis. Project detail is given in the following Documents. The information about the Solar Street Light is explained in detail in the following topic.

8

Page 9: solar street light project report

Technology: - (Solar Light)

The solar light is a complex but useful source of light. Solar light is consisting of following component;

Photovoltaic

A stand alone so photovoltaic street lighting system comprises a compact fluorescent lamp, lead acid battery, PV module(s) control electronics, inter-connecting wires / cables, Module mounting hardware, Battery box, Operation, instruction and maintenance manual.

Duty Cycle

The system should be designed to automatically switch ON at dusk. Operate throughout the night and automatically switch OFF at the dawn.

Lamp

The lamp will be of compact fluorescent (CFL) type, either 4 - Pin or 2 Pin type, with a rating of 11W. For the 4 - Pin type CFL. Adequate pre-heating circuit must be provided. The light output from the lamp should be around 900 +5% lumens. The lamp should be housed in a weather proof assembly suitable for outdoor use, with a reflector on its back. While fixing the assembly, the lamp should be held in a base up configuration.

Battery

Electrolyte type positive tubular plate is required. Low maintenance leads acid battery. The battery will have a minimum rating of 12V 75 Ah (at C/10) discharge rate. 75 % of the rated capacity of the battery should be between fully charged & load cut off conditions.

Celectron

The inverter should be of quasi sine wave/sine wave type. With frequency in the range 20 - 35 KHz. Half-wave operation is not acceptable. The total electronic efficiency should be at least 80 %. No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes OFF is one cycle). The idle current consumption should not be more than 10 mA. Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery throughout the year. Necessary lengths of wires/cables and fuses should be provided. The PV module will be used to sense the ambient light level for switching ON and OFF the lamp.

9

Page 10: solar street light project report

PV Module (s)

The PV module(s) shall contain crystalline silicon solar cells. The power output of the module(s) under STC should be a minimum of 74 W either two modules; of minimum 37 W output each or one module of 74 W output should be used. The operating voltage corresponding to the power output mentioned above should be 16.4 V. The open circuit voltage of the PV modules under STC should be at least 21.0 Volts. The terminal box on the module should have a provision for opening for replacing the cable if required. A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side. Electronic Protections and Adequate protection is to be incorporated under no -load conditions e.g. when the lamp is removed and the system is switched ON. The system should have protection against battery overcharge and deep discharge conditions. Fuses should be provided to protect against short circuit conditions. The pole should be made of mild steel pipe with a height of 4 meters above the ground level, after grouting and final installation. The pole should have the provision to hold the water proof lamp housing it should be painted with a corrosion resistant paint. A vented, acid proof and corrosion resistant painted metallic box for outdoor use should be provided for housing the battery.

Components and parts used in the solar street lighting systems should conform to the latest BIS specifications, wherever such specifications are available and applicable.

Environment and social impact:-

Energy saving provide electric energy with solar energy photovoltaic conversion, which would never be exhausted. No pollution, no noise, no radiation. Safety No such accident as electric shock or fire at all. Convenience Simple installation, no need to erect wire or excavate ground without consideration of power shut down or power restriction. Solar Street Light has long life high technical content of the product, control system and module being of famous world brand, intelligent design, and reliable quality. Solar energy is a High quality Technical product, green energy, using units attaching importance to technology, enhancing green image and level. Solar energy is a Investment all at once, same price as AC power (sum of AC power investment from substation, power feeding, control cabinet, cable and engineering), investment all at once with long term usage. Wide application solar energy comes from nature. It can be used so long there is sunshine, especially suitable for green land sight light equipage, high grade housing and outdoor lighting, tour scenic spot and coast lighting and decoration, industrial development area, factory and enterprise street lamp, outdoor light of colleges.

10

Page 11: solar street light project report

Benefits and features of solar lights:-

Immune to power outages

Wandal resistant hardware

No trenching, no wiring

No maintenance

Stand alone, not connected to grid

Easy installation-quick connect plug

Longer lifetime (50,000 hours)

Organization, management, and training:-

Well trained employees are in MTA Corporation with a lot of experience and outstanding work. Trainings are an important part of the organization to keep employees up-to-date with the latest technology. HR Manager is responsible for the hiring, training and compensation of the employees.

Project implementation:-

Schedule for project implementation is given in detail in the MS Project file. Partners' responsibilities in implementation are MTA Corporation, Suppliers i.e. (Shi fang Company, Malik steel, A.A Company, Askari Cement, and Hino-Pak).

Shi Fang Company:-

Lamps, Batteries’, PV Module(s), controlling device

Mechanical equipment

Electronic accessories

Malik Steel:-

Stainless steel poles, water prove box

11

Page 12: solar street light project report

AA Company:-

Procure Bricks for installing the pole holder.

Askari Cement:-

Procure Cement to make holder of the street light pole.

Hino-Pak Company:-

Procure trucks to transport street lights to the designated places.

Milestones:-

Sr.No Task

1 Budget approval from the organization

2 Inspection Team Report/Survey Report

3 Purchase of Materials

4 Purchase of Vehicles

5 Installation of Solar Street Lights to the designated locations

6 Final Report

12

Page 13: solar street light project report

Costing & Budgeting:-

Budget =Rs. 50,000,000

Total Estimated Cost= "Rs36, 041,827.15"

Scope Statement

Project Justification:-

There is a lot of Shortage of electricity in Pakistan. Pakistan Government is looking forward to produce energy from other available resources in Pakistan. Solar energy is one important way to produce electricity other than traditional way of producing electricity. It is a onetime cost project which benefits for future.

Project Product:-

Solar Street Lights is the Project Product.

Project Deliverables:-

Solar Street Lights

Project Objective:-

Solar energy is a very useful renewable source of energy, which may be the answer to the future for power, or energy needs, as global warming seems to pick up rapidly. So, we can all contribute to the environment by using solar energy thus erasing or trimming down various gas emissions, which can endanger earth, in turn, the millions of people in it. By installing solar street lights in the Capital city Islamabad of Pakistan, it will help to reduce the energy problem in some way. The installation cost of Solar Street light is less than the Traditional Street light. So, by installing Solar Street lights, it will definitely play a pivotal role to stabilize the economy of Pakistan.

13

Page 14: solar street light project report

Assumptions/Limitations:-

One time cost but beneficial, less emission of energy that effect ozone layer or help to reduce global warming, better working then the traditional or previous ones. Cost is one factor, Accessibility, Literacy rate, technology, experts.

Overall Project Priority:-

High

Medium

Low

Comments: -

This project is going to help in the growth of Pakistan’s economy because right now Pakistan is going through a lot of major issues and electricity is one of them, so by planting solar street lights it will reduce the consumption of electricity on traditional street lights and the supply of electricity will be more likely be equal to the demand of the people.

14

Page 15: solar street light project report

Stakeholders’ Register

15

Page 16: solar street light project report

Sr.No Name of Stake holders

Designation Department Role in project

Type of communication

Expectation Interest Power

1 M Tanveer Ahmed

Project Manager Overall To assure all the activities are being done as scheduled

Face to Face and daily meetings

Successfully installing the solar street lights in Islamabad

High High

2 Government of Pakistan

Financing body Nil To finance the project

Reports and meetings on monthly basis

Fully support to make project successful

High High

3 World Bank

Financing body Nil --as above--

--as above-- --as above-- High High

4 Labor Work Force Operations To produce solar street lights and plant in the Islamabad

Meetings and Face to Face

Salary on time Low Low

5 Suppliers Nil Nil To provide the best available material to build the solar street lights

Written and meetings

Contracts High Low

16

Page 17: solar street light project report

17

Page 18: solar street light project report

Human Resource Management Plan

Roles and Responsibilities’:-

18

CEOCEO

FINANCE MANAGER

FINANCE MANAGER

HUMAN RESOURCE MANGER

HUMAN RESOURCE MANGER

MARKETING MANAGER

MARKETING MANAGER

PROCUREMENT MANAGER

PROCUREMENT MANAGER

QUALITY MANAGER

QUALITY MANAGER

PROJECT MANAGER

PROJECT MANAGER

ASSISTANT MANAGER

ASSISTANT MANAGER

ASSISTANT MANAGER

ASSISTANT MANAGER

ASSISTANT MANAGER

ASSISTANT MANAGER

TEAMTEAM ASSISTANT MANAGER

ASSISTANT MANAGER

TEAMTEAM

TECHNICAL EMPLOYEES

TECHNICAL EMPLOYEES

MARTKETING RESEARCHER

MARTKETING RESEARCHER

TEAMTEAM

TECHNICAL EMPLOYEES

TECHNICAL EMPLOYEES

TRAINERSTRAINERS

TEAMTEAM

ACCOUNTANTSACCOUNTANTS

AUDITORSAUDITORS

TEAMTEAM

ANALYTICAL SKILLED

EMPLYEES

ANALYTICAL SKILLED

EMPLYEES

Page 19: solar street light project report

Designation Roles & Responsibilities’

CEO

Its role is more like a leader and visionary person. She/he advises the Board and supports motivation of employees in organization products/programs and operations. He ensures staff and Board have sufficient and up-to-date information, looks to the future for change opportunities and interfaces between Board and employees, and organization and community.

Marketing Manager

To develop, establish and maintain marketing strategies to meet organizational objectives. She/he manages and coordinates all marketing, advertising and promotional staff and activities. Conduct market research to determine market requirements for existing and future products. Analysis of customer research, current market conditions and competitor information, develop and implement marketing plans and projects for new and existing products. Manage the productivity of the marketing plans and projects. Monitor, review and report on all marketing activity and results. Determine and manage the marketing budget. Develop pricing strategy and liaison with media and advertising.

19

Page 20: solar street light project report

Human Resource Manager

Maintaining and develop HR policies, ensuring compliance and to contribute the development of corporate HR policies. She/ he develop the HR team, to ensure the provision of a professional HR service to the organization. Manage a team of staff. She/ he are Responsible for mentoring, guiding and developing them as a second line to the current position. To ensure timely recruitment of required level / quality of Management staff, other business lines staff, including non-billable staff with appropriate global approvals, in order to meet business needs, focusing on Employee Retention and key Employee Identification initiatives. Prepare information and input for the salary budgets. Ensure compliance to the approved salary budget; give focus on pay for performance and salary benchmarks where available. Ensure adherence to corporate guideline on salary adjustments and promotions. Coordinate increments and promotions of all staff. HR manager develop the HR business plan and ensure appropriate communication at all staff levels.

Finance Manager She/he coordinates the approval and rejection of, lines of credit and commercial, real estate, and personal loans. Develop and analyze information to assess the current and future financial status of firms. Establish procedures for custody and control of assets, records, loan collateral, and securities, in order to ensure safekeeping. Evaluate data pertaining to costs in order to plan budgets. Evaluate financial reporting systems, accounting and collection procedures, and investment activities, and make recommendations for changes to procedures, operating systems, budgets, and other financial control functions. Oversee the flow of cash and financial instruments. Plan, direct, and coordinate risk and insurance programs of establishments to control risks and losses. Prepare financial and regulatory reports required by laws, regulations, and boards of directors. Prepare operational and risk reports for management analysis. Communicate with stockholders and other investors to provide information, and to raise capital.

20

Page 21: solar street light project report

Procurement Manager

Quality Manager

Implement procurement strategy and policies. Forecast procurement needs. Create and implement KPI’s. Continually develop expertise to support growth for new projects. Monitor macro trends in supplier and contract base and implement plans to react. Build and develop relationships with key suppliers and customers. Lead the procurement group in all phases. Identify and develop training opportunities. She/ he order materials and services as per negotiated and appropriately approved. Review quotations. Prepare purchase requisitions, approve and issues purchase orders in accordance with company policy and negotiated terms and conditions. Maintain procurement files. Track Purchasing activity and measurements. Discuss defective or unacceptable new goods or services with users, vendors and others to determine cause of problem and take corrective and preventative action. Ensure supplier compliance with site and company requirements for safety. Manage vendor relationships and assist in building effective partnerships.

Aims to ensure that the product or service an organization provides is fit for purpose and meets both external and internal requirements, including legal compliance and customer expectations. A quality manager, sometimes called a quality assurance manager, coordinates the activities required to meet quality standards. She/he also monitors and advice on the performance of the quality management system and produces data and report on performance, measuring against set indicators. They liaise with other managers and staff throughout the organization to ensure that the QA system is functioning properly. Where appropriate, the quality manager advises on changes and their implementation and provides training, tools and techniques to enable others to achieve quality.

21

Page 22: solar street light project report

Project Manager

Assistant Manager

She/he is responsible for managing and accomplishing the project objectives within the constraints of the project. She/he is responsible for the outcome (success or failure) of the project. Project Manager is involved with the planning, controlling and monitoring, and also managing and directing the assigned project resources to best meet project objectives. She/he controls and monitors “triple constraints”—project scope, time and cost (quality also)—in managing competing project requirements. Project Manager examines the organizational culture and determines whether project management is recognized as a valid role with accountability and authority for managing the project. Project Manager collects metrics data (such as baseline, actual values for costs, schedule, work in progress, and work completed) & reports on project progress and other project specific information to stakeholders. Project Manager is responsible to the project stakeholders for delivering a project’s objectives within scope, schedule, cost, and quality.

Looking after the policies and procedures as per the company norms, attrition control, target meeting, roster management, and leave tracker management, one on one with the team members could be on monthly basis, daily reporting, escalating issues to other officials’ an members of the leadership.

22

Page 23: solar street light project report

Communication Management Plan

23

Page 24: solar street light project report

Message Owner Recipient Delivery

Vehicle

Notification Medium

Frequency Cycle

Project Status Project Manager Project Sponsor and Key Stakeholders

Project Status Report

Word Document sent via e-mail

Monthly

Meeting Discussion, Decisions, Action Items

Meeting Facilitator Meeting Participants

Meeting Notes

Word Document sent via e-mail

As often as meetings are held

Informational updates on issues, schedules, task assignments that must be communicated before the next status meeting

Project Manager Project Sponsor and Key Stakeholders as needed

Message E-Mail with attachments as needed

On an as needed basis when information becomes available

Status updates on Tasks

All team members

Project Manager

Task Updates

EPM Task Reporting

When a team member has a task due during the current week

Executive Presentation

Project Manager with Project Sponsor

Executive Sponsor and Key Stakeholders

Slide Presentation or Report

PowerPoint or Word document

As often as needed for  Stakeholder involvement and commitment

Project Steering

Project Manager, Project Sponsor

Project Steering

Steering Committee

In person – with

Every 3 – 4 weeks per

24

Page 25: solar street light project report

Committee

Meetings

Committee Meeting PowerPoint, Word document, or Project deliverables

meeting schedule

25

Page 26: solar street light project report

Procurement Management Plan

Procurement Statement:-

MTA Corporation is producing a premium product so we require a premium supplier. So MTA Corporation requires a high quality product from the suppliers for their customers.

Estimated Cost:-

Total Estimated Cost = Rs.17, 680,260 +/- 20%

Procurement Definition:-

For making the premium product i.e. Solar Street Lights, MTA Corporation requires the following parts according to their specifications;

Procurement of Stainless Steel Poles

Procurement of Material

Bricks

Cement

Lamp

Battery

Controlling device

Celectron

PV Module(s)

Electronic Protection Materials

Mechanical Hardware

26

Page 27: solar street light project report

Electronic Accessories

Vehicles (Trucks)

Specifications:-

Highly efficient mono crystal or multi crystal silicon solar panels for power supply.

Working Voltage: 12 / 24V DC

Lighting Time: 8 to 12 hours per day depending on the season

Advanced charging, discharging and lighting control circuit with reliable Performance

High lighting efficiency, great brightness

Easy installation

Safe, reliable, energy saving, economical, environmental protection

Lamp specifications:-

Lamp technology: LVD (Induction light)

Power Rating: 40W

Life span: > 100,000 hours

Mean lumen: 6,800

Mean pupil lumen: 11,000

CRI > 80

Color temperature: 2700, 2500 or 4100K (based on client’s decision for type of color)

Lamp fixture specifications:-

Different lamp fixture designs can be proposed. The fixture must include the following components:

- Reflector

27

Page 28: solar street light project report

- Closed housing

- Electronic Ballast

- Mounting brackets

Details of the proposed fixtures should be submitted with both clear designs, cut sheets and photometric performances.

PV module spec:-

Type: Multi or Mono crystalline technology

Conversion Efficiency: > to 15%

Manufacturing tolerance on rated power: ≤ 3%

Module Voltage: 12V

Environment: See general description for environment requirements

Connector type: Multi Contact type possibility

Total weight: ≤ 20 KG

Cell protection: The cells should be protected by a tempered glace

Batteries spec:-

The following are the minimum requirements for the battery(s):

Maintenance free

Gel type batteries

No leakage

12V type Deep discharge capacity

Expected life span over 8 years in normal operating condition

Charger controller specification:-

28

Page 29: solar street light project report

The charger controller should be located close to the battery(s) and it should need minimum maintenance. This unit can include the automatic dusk/down switch and the dimmer/timer module. The controller should have the following protections:

Overcharging

Over discharging

Overload

Selection Process & Criteria:-

RFP will be floated then identify the suppliers, evaluating the suppliers, selection of supplier, alternative supplier, review. The criteria will be the terms and conditions of contract. According to the specifications and required quality of the products that are to be procured.

Project Procurement Team:-

Sr.No Designation Procurement Role

1 Project Manager He/ She are Responsible for overall procurement activities.

2 Procurement manager

Assist the procurement manager and make it sure that required product is procured.

3 Procurement manager’s team

Check and balance of all the activities of procurement. Ensure that right product and required quantity of product is acquired

29

Page 30: solar street light project report

Vendor Management:-

Procurement manager and his team will manage the relationship with supplier and ensure that they provide the right parts on the time as per requirement.

Quality Management Plan

Project Scope:-

MTA Corporation aim “Towards provide alternative solar energy solutions for domestic, industrial and commercial establishments in order to mitigate the energy problems in Pakistan”.

Deliverable Description:-

The main deliverable of project is Solar Street Light. The other somewhat related to product deliverables are; Less Cost, No electric current is required, high quality solar street lights, easy to maintain, Heavy Duty 1/8 Aluminum with welded seams and rubber mats, Heavy duty front door with stainless steel hinges, gaskets and lockable, No sharp edges on enclosure door, 24 volt 10 amp controller, Field adjustable for on/off times, Settable for gel cell battery charge curve to ensure performance and autonomy, Pulse Width Modulation charge regulation, Factory mounted in battery box, Controller automatically adjusts for seasonal light changes, Extends battery life, reduces deep discharge cycling and enhances autonomy.

Acceptance Criteria:-

The product will only be accepted if it completes all the activities as per requirement and fulfills the required mentioned quality in the project plan by the customer and the MTA Corporation then it will be accepted otherwise, Quality manager will manage the problem and make the product up to the set standard.

Quality Assurance Activities:-

30

Page 31: solar street light project report

Quality manager will monitor the project and its activities throughout the entire project and ensure the quality according to the requirement and schedule.

Project Monitoring and Control:-

Monitoring and controlling will be done throughout the entire project by the quality and Monitoring & controlling department on daily routine.

Project Team Quality Responsibilities:-

Quality team will be responsible for the overall all products acceptance. Pre-test will be done by the team, audit and see the quality time to time throughout the project and checklist will be made by project manager according to which quality team will ensure that all the requirements’ of the product meets. In short project team quality is responsible for the end product.

Risk Management Plan

31

Page 32: solar street light project report

Statement of Risk

Backup power station is required which may not be possible for some locations.

Solar energy is influenced by the presence of water vapor, pollution etc. in the air, which may cause complexities

Considerable amount of energy is lost when DC has to be converted to AC

Inflation

Stakeholder Affected

Cost will be higher

Project Failure

Medium affect

Cost will increase, High

Priority

Medium

High

Medium

Medium

Probability/ Likelihood

40%

50%

70%

30%

Certainty

Medium

High

High

High

Possible Causes

Bad Weather

Air Pollution, Water vapors

Conversion of DC into AC

Increase of Currency, Unstable economy

Possible Consequences

Will stop solar street light to work

Will disturb the working of solar street lights

Will affect the effectiveness of solar street light

Will affect the costing and budgeting of the project.

Mitigation Strategy

By increasing the Battery duration and backup storage.

By placing in the dry areas, or by protecting shield.

Conversion period can be reduced to when it is needed.

By stopping the unnecessary conversion of DC into AC.

Forecasting’s will be made in and rates are pre-determined with the supplier.

32

Page 33: solar street light project report

Conclusion:-

Energy can be produced by many sources but now a days the traditional way of producing energy is becoming more and more costly as well as there is no reserves of water through which energy can be generated, so by using the alternative and new technology to generate electricity is through solar energy, which is costly but not more than the traditional one and gives long-term benefits. Overall the project is going to be complete in short time span with the best outcomes.

33