solar rooftop. the hero group - overview the hero group - overview top 10 widely recognized brand...

17
Solar Rooftop

Upload: gervase-long

Post on 28-Jan-2016

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Solar Rooftop

Page 2: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

The HERO GROUP - OVERVIEW

Top 10 widely recognized brand in India

Members among the leaders in business:

World’s largest two wheeler manufacturer with over 50 Million two wheelers sold

250 MW renewable power capacity installed across India.

Market Capitalization of over USD 6 Billion.

Global Partnership; over 5,000 business associates and Over 23,000 employees

INFRA

FINANCE

RENEWABLE

ENERGY

AUTOMOTIVE

IT/SERVICES

EDUCATION

Page 3: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

HERO FUTURE ENERGIES- OVERVIEW

Incorporated in October, 2012, Hero Future Energies Pvt. Ltd. (HFE), is the renewable energy arm of The Hero Group with a focus on Solar, Wind and Hydro.

• With “Planet Positive Power” as its vision HFE plans to develop Gigawatt scale sustainable, cost-effective Clean Power reducing carbon foot print for a greener planet.

• Over 200 MW Wind Projects installed across India within 3 years

• 30MW Plant Commissioned in Madhya Pradesh under National Solar Mission

• Total 5MW Rooftop Plant Installed in Punjab, Haryana and NCR –(2 MW under Solar Energy Corporation of India)

• Commissioned One of India’s largest Rooftop Plant 1.5 MW at HMC, Neemrana

• 12 MW Solar projects under construction

WindSolar

Page 4: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

OUR PROJECTS

Wind Under pipeline

Wind Under construction

Wind Commissioned

Solar Commissioned

Solar Under construction

Page 5: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

HFE Differentiators: We walk the talk

Experienced Team

STRENGTHS

Customized solutions

Design & Engineering

Procurement

Project Development

O & M

Reliability

HFE

Multi disciplinary team exposure in various Renewable verticals and across functions.

Ability to customize solution as per the requirement of user and state of the art performance monitoring solutions

In house team for complete design and engineering Partnership with top consultants in renewable sector

Relationship with global suppliers across technologies and value chain

O&M support for project life

Realistic site assessment

Top-notch Workmanship

Timely completion Quality execution.

Page 6: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Why Solarize?

Why Solarize?

Government Mandate:• Comply with HAREDA order for

Mandatory Solar

Good Payback Period:• Solar panel prices have dropped

in last 2 years, system cost all time low

Maintenance Friendly:• Very Low O&M cost !• No moving parts !

Easy Monitoring:• User friendly system !• Online monitoring !

Cost Saving & Cash Flow:• Save on Electricity Bill and take

advantage of “Net Metering” policy

• Free Cash Flow after breakeven

Tax Saving:• Save on taxes with

Accelerated Depreciation

Low Expenses: • Easy training !• 25 yrs module

warranty !• Fixed Insurance cost !

Risk:• Free fuel ! No commodity risk !• Module Output Guarantee !• Vendor Warranties !

Reliability:• No more grid fluctuations !• Module Performance

Guarantee!• Predictable energy

generation! Minimal Variability !

• Bank energy with battery if required !

Low Risk Technolog

y !

Low Risk Investmen

t !

Page 7: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Rooftop Grid Connected System

Shadow free space required* on RCC roof: 12-13 sq.m/ kWp (Poly crystalline module) Shadow free space Required* on industrial shed: 11 sq.m / kWp (Poly crystalline module)

• Space required can vary depending on roof profile and shadow from vicinity• In case of space constraint we can provide solutions with highly efficient modules

as well

Page 8: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

How to Start?

Site Survey by HFE and General Discussion

Submission of Techno-Commercial Proposal by HFE

Release of Work Order by Customer

Detailed Engineering

Engineering Drawing/Make Approval from customer

Material Supply/ Project Execution/Approvals & Permits

Commissioning & Testing

O&M Work

Day-1 Day-10 Day-15 Day-45 Day-55 Day-100 Day-120

Zero Day

Typical Time frame* for 100kWp system* Time frame varies based on selected equipment and system size

Consultation & Assessment Design, Engineering Installation Monitoring & Maintenance

Page 9: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

80Kwp Solar Rooftop on RCC Roof

Page 10: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

1460 KWp on Inverted Bracing Structure

Page 11: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

250KWp- Installation on Industrial Rooftop

Page 12: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

30MW Ground Mounted Solar Plant in M.P.

Page 13: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Industrial Shed at many locations is still Asbestos

• Asbestos is carcinogenic. Fumes are released when the sheet is punctured for installing clamps/structure.

• Asbestos sheds are fragile in nature so chances of sheets break during installation of panels or during

maintainence

Tilt angle in Industrial Sheds

• For achieving bet yield tilt angle should be close to the latitude of the location.

• In Industrial sheds, the tilt is the same as the inclination of the shed which is usually about 8 degrees,

less than latitude and thus decreases yield.

• Another challenge is that if we don’t keep the panels in same angle as the roof then we won’t be able to

sustain wind loads

Directions

• For achieving best yield, panel have to be installed in south facing direction, south-facing roof is not

available at most of the places.

Shadow free roof

• Shadow of tall building adjacent to the location may not allow good capacity to be installed. So planning

for solar can be difficult.

• Also people usually have HVAC, Tank on rooftop that limits the space, especially in RCC roofs.

Challenges in Rooftop

Page 14: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

For industrial sheds customers tend to go for the system phase wise

• This limits the benefit of economies of scale resulting to higher prices and also higher tariffs in RESCO

model

Lack of Net Metering policy implementation

• As most rooftop solar is for captive consumption, during holiday season when load is low the extra energy

goes to the grid, which changes the grid meter value

• To avoid this either net metering is required or one has to provide reverse current protection which

increase the system cost by at least 3 Rs/Wp.

Implementing battery-based off grid system is not very economically viable due to high cost of

batteries.

Remote monitoring system cannot be implemented in small systems less than <25 kWp as

high cost of these make it not so attractive and commercially viable.

People are waiting for government subsidies to install rooftop solar despite MNRE instructions.

The subsidy point needs to be clearly addressed.

Challenges in Rooftop

Page 15: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Key Vendors

Page 16: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

Key Clients

Page 17: Solar Rooftop. The HERO GROUP - OVERVIEW The HERO GROUP - OVERVIEW  Top 10 widely recognized brand in India  Members among the leaders in business:

THANK YOU