solar power plant procurements

18
Solar Power Plant Procurement's

Upload: sunrator-technologies-llp

Post on 13-Apr-2017

490 views

Category:

Environment


1 download

TRANSCRIPT

Solar Power Plant Procurement's

COMPLETE PROCESS OF PROJECT EXECUTION

KEY PARAMETER FOR EFFECTIVE SOURCING

• Experienced Team – Should have experienced professionals. The management team is constituted by a highly experienced leadership team.

• Engineering Excellence – Focus on value based engineering, design and planning. • Quality Focus - Well-defined and stringent quality standards for supplier selection. Existing relationship with the tier 1 supplier

helps in ensuring the quality and timely execution of the projects.• Engineering – Re-engineering of complex processes in the most economical manner

– Resulting in increase in output and reduction in losses– Resulting in minimal cost over-run– Resulting in cost savings during execution

• Effective procurement – Procurement strategy driven by a deep understanding of vendors / contractors network in India and abroad.

– Ordering with established vendors to facilitate cost effectiveness & standardization– Explore & develop vendors for contingency– Efficient time management in finalizing, ordering & tracking of supplies

• Demonstrated capability in systems integration: An in-depth knowledge of PV plant design and optimization techniques for a wide spectrum of PV technologies.

STRATEGY OF PROCUREMENT

PROCUREMENT

New supplieridentification

Optimally ratedequipment chosen

Quality and Certifiedproducts

Tie-ups & SLA withreputed vendors

Experienced procurementteam

Strategicpaymentterms for

critical itemsfor long

termview

Pre-Bid tie up

and SLA

Vendor base and

Geographiclocation ofprojects ismapped

RequirementConsolidation

GLOBAL SOURCING TIE UP

STRATEGY FOR SOURCING

Tie-ups with Major OEM’s,Vendors

Strong Focus on Quality andCertification of products

Strong SLAs with majorvendors for dedicated O&Mpractice

Procuring ElectricalEquipment for more than 8decades

Pre Quality audit ofmanufacturing facility ofvendors

EHS process validation

Modules Inverters Cables Transformers

CENTRALIZED PROCUREMENT

Leverage Buying Power and Optimize System CostDeploy best practiced procurement teams to establish broad connections with world famous solar suppliers and are professional in both quality control and cost optimization.

Advantages Ensuring the Success of Project- Robust, agile supply chain with a global network, strong purchasing power, and timely delivery- Integrated planning, scheduling, and execution system- Significant improvements in cost reduction and installationspeed- Ideal partner with leadership, experience, and technicalexpertise- Globally centralized supply chain management- Selection of the best components and equipment withrespect to quality, price-performance ratio, and harmonization- Key components of the highest quality from premiumbankable suppliers- Cost control and security through strict cooperationagreements- Leverage buying power and optimize project cost- Significant cost-reduction improvements

EFFICIENT LOGISTICS & LOGISTIC DIFFERENTIATOR

Single window for all

Centralized CHAand freightforwarder

Finalization

B.O.E,Advance

reconciliations

LC Remittance

CentralizedLC, TT &Advancereleases

Advantages:

verticalsSingle window for allbank liasonningPost export documentstraceability

• Deploying of freight forwarders for material movement at vendors premises

• Tracking of shipments on daily basis to ensure timely deliveries at sites

• Planning and co-ordination for Road permits and MNRE documents for excise exemption – Teams formed to ensure smooth movement of material to site

• HSS, B/L retrieval from bank ,clearing of containers at port and local freight seamlessly completed within 4 days of shipment docking

• Planning and distribution of resources allocated to this ensure vital element and monitored by Head SCM

• Co-ordination with site team to ensure minimum turnover time of containers evacuation.

S

O

LONG TERM RELATIONSHIP WITH SUPPLIERS

•••••

Identifying and developing new vendors with auditPeriodic vendor evaluationsGetting differential rates in the marketEstablishing Rate contracts both annual and monthlyStrategic Purchase decision involving Top personnel of suppliers

ANNUAL RATECONTRACTS WITHVENDORS WHICH

HELPS INCOMPETITIVE

RATESAND STOCKS

DISPOSAL ONCEPROJECT SITES ARE

OVER.

VENDOR FINANCINGSCHEME : VENDORS

GET THEIR PAYMENTWITHIN 30-45 DAYS

THROUGH RTGSIMPROVING THEIRWORKING CAPITAL

REQUIREMENTS

WORKING WITHVENDORS FROM PRE

TENDER STAGE ANDGETTING THEMENLISTED FOR

PROJECTS PROVIDESDIFFERTIAL PRICES T

SECURE ORDERS

PROVIDING LASTCHANCE OF REFUSAL

TO VENDORS WHOHAVE SUPPORTED IN

TENDER STAGE

ty and HS pliance

ost

BASIS FOR SELECTING OF VENDORS

Time

C

Quali Supplier pastE performance

Com and reliability

• There should be a proccess for audit and to have strong and long term strategic tie up

• Involve in process improvement of vendors andsuppliers

• Standardization of engineering design toprocure material/ equipment's from regularvendors in time

• Bulk buying to get the benefit of economies• Selection of Freight forwarded for carrying the

material at competitive prices• Supplier past performance and reliability

ensures delivering the right quality st theproject

``````` ``` QUALITY CONTROLQUALITY IS OUR MOTTO

Activity

ITP (Inspection Test Plan)

For Procured Materials atFactory

Activity Owner Documentation

Incoming Material Inspection ReportIn-Process Inspection ReportsFinal Inspection ReportsPerformance Witness

Performed by: Vendors

Checked by: SWL QMC Team, Third Party & Project Owner

Installation Inspection

Method StatementInstallation ChecklistInspection Records

FQP (Field Quality Plan)

For Physical Installation ofSystem

Performed by: SWL

Checked by: SWL QMC Team,Project Owner

•••

Integrated Testing Plan

Pre-Commissioning Checklist Individual Test Records System Test RecordsData Inputs/ Outputs

Certificate of Conformance

ATP (Acceptance Test Plan)

Integrated PerformanceTest

Performed by: SWL

Checked by: Project Owner•••••

SELECTION OF PV MODULES

KEY PARAMETERS FOR SELCTION OF PV MODULES:

1. Module shall be 320 Wp or higher with linear degradation.2. It should be PID resistant3. It should have 4 sq. mm cable with atleast 1200 mm length4. Current sorting shall be available for +_5% per pallet.5. Serial defect should not be present in the modules6. Have good reference in INDIA 7. It should have backing from Insurance co. such as Munich, RE8. It should have anti reflecting coating glass of 3.2 mm thickness.9. Power coefficient shall be low.10. Junction box shall have at least 3 bypass diodes and output cable shall be compatible with MC4 or MC4

compatible connectors.11. It should have 4 BB

SELECTION OF PV MODULES

KEY PARAMETERS FOR SELCTION OF PV MODULES:Validity of the documents including Certificates.- Compliance of the product (including Bill of Materials) with the required certifications designated by the manufacturer.- Compliance of the product with other related certificates required by the client, including but not limited to IEC62804 (PID). -IV test and curve analysis, including:Equipment validation | Annual calibration | Maintenance records | First and Second Reference Module validationTesting Procedure | Standard Operating Procedure validation | Frequency of calibration and recordsTest Results | Pmax (to be within the tolerance) | All electrical parameters including fill factor | IV curve- Electro-luminescence inspection- Visual InspectionWorkmanship defectsVerification of components visually and from manufacturer’s internal systemPackaging--BOM Verification as per agreed and certified specifications.

Module losses generally

account for major losses in

the system

PRICING TREND IN SOLAR PV

CURRENT PRICE OF ROOFTOP MARKET

ROOFTOP MARKET:

• Prices vary from 52 RS/ Wp to 60 Rs. / Wp • Prices depends on the following:

size of the roof. Evacuation Voltage Type of roof ( Trapezoidal/ high seam/ RCC) Inverter selection Module configuration Misc. requirement

In the range of 42-44 USD Cents/ Wp

Modules

String Inverter approx. 6 Rs/ Wp without tax.

Inverter

RCC ROOF: Approx 3-4 Rs/ Wp, metallic roof approx. 2 Rs/ Wp

Structures

TREND OF SOLAR PV PRICING

WHAT ARE THE REASON FOR THE DROP IN SOLAR SYTEM PRICING?

Rohit Bhandari

REASONS OF LOWERING OF SOLAR PV PRICING

1. Drop in Module Price.2. Optimization of Engineering i.e. DC: AC ratio3. Entry of New manufacturers in the market4. Customized solutions5. Increase in Size of the project6. Reduction in BOS price due to higher

efficiency of Modules7. Reduction in structure weight due to better

material like ZAM/ Galvalume

Rohit Bhandari

TYPICAL SOLAR PLANT

[email protected]

Rohit Bhandari THANK YOU