2
Quality • 144,144 Yingli kristalline modules • 39 SMA central inverters • Approx. 500 km cabel trays • GehrTec ® Base mounting system with approx. 25,000 posts • Separate expandable 110 kV transformer station • At times the site employed up to 120 installers Environment • Expected electricity output: 33,000,000 kWh per year • Approx. 32,000 tons CO 2 savings per year (compared to conventional power generation) • Provides about 9,300 households with clean energy* • 26 hectares are designated compensation areas and serve as a habitat for many meadow breeding birds *Three person-households in Germany with a yearly energy use of 3,500 kWh Solar power plant Perleberg Capacity: 35 MWp Area: 90 ha Date: June 2012 Solar power plant Perleberg www.gehrlicher.com

Upload: hatu

Post on 15-Mar-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Solar power plant Perleberg - Gehrlicher Solar – Imagine …gehrlicher.com/.../Factsheets/Factsheet_Perleberg_A4_en.pdfThe solar park was built on the grounds of the former military

Quality

•144,144Yinglikristallinemodules•39SMAcentralinverters•Approx.500kmcabeltrays•GehrTec®Basemountingsystemwithapprox.25,000posts•Separateexpandable110kVtransformerstation•Attimesthesiteemployedupto120installers

Environment

•Expectedelectricityoutput:33,000,000kWhperyear•Approx.32,000tonsCO2savingsperyear(comparedtoconventionalpowergeneration)

•Providesabout9,300householdswithcleanenergy*•26hectaresaredesignatedcompensationareasandserveasahabitatformanymeadowbreedingbirds

*Threeperson-householdsinGermanywithayearlyenergyuseof3,500kWh

SolarpowerplantPerlebergCapacity:35MWpArea:90haDate:June2012

Solar power plant Perleberg

www.gehrlicher.com

Page 2: Solar power plant Perleberg - Gehrlicher Solar – Imagine …gehrlicher.com/.../Factsheets/Factsheet_Perleberg_A4_en.pdfThe solar park was built on the grounds of the former military

09.12

Gehrlicher Solar AGGehrlicher Solar AG Munich Germany [email protected]

Coburg Germany [email protected]

Brazil(Salvador)CzechRepublic(Prague)France(Paris)Fuerteventura(LasPalmas)

GreatBritain(Birmingham)India(Mumbai)Italy(Milan)Romania(Bucharest)

Wereservetherighttomakechanges

Spain(Madrid,Murcia)SouthAfrica(EastLondon)Turkey(Istanbul)USA(Springfield)

GehrlicherSolarAGsuccessfullycompleteditsPerlebergsolarparkthatislocatedhalfwaybetweenHamburgandBerlininrecordtimeafterjusttwoandahalfmonthsofconstruction.Duetothesolarpark‘shighcapacityof35MWpnominalcapacity,thecompanyalsobuiltaseparateexpandable110kVtransformerstation,whichservestoconnectthesolarparktothegrid.

ThesolarparkwasbuiltonthegroundsoftheformermilitaryairportPerlebergandcomprises90hectares,anoverallareacorrespondingtothesizeofapprox.125soccerfields.Moreoverthesolarparkisanexampleofasensibleuseoffallowterrain,whichwasonceusedformilitarypurposes.

Afterthecomplexundertakingofmunitionsremoval144,144modulesmanufacturedbyYingli,39invertersbymarketleaderSMAandabout500kmofcablewereusedinthisprojecton64hectares.Attimesthesiteemployedupto120installers.TheGehrTec®Basesubstructuredevelopedin-house,forwhichapprox.25,000postswererammedintothegroundservesasthebasisforthecrystallinemodules.Theremaining26hectaresaredesignatedcompensationareasandserveasahabitatformanymeadowbreedingbirds.

TheparkwassoldtotwoinvestmentfundsofKGALGmbH&Co.KGlocatedinGrünwaldnearMunichspecializinginrenewableenergies:InfraClassEnergie6,aclosed-endfundopentothegeneralpublicpurchasedthewesternpart,whiletheeasternpartwasacquiredbytheEuropeanSustainablePowerFund2forinstitutionalinvestors.

Solar power plant Perleberg

Factsheet