Luckey Site Cleanup Formerly Utilized Sites Remedial Action Program Luckey, Ohio Phone: 1-800-833-6390 (Option 4) . Email: [email protected] Web: http://www.lrb.usace.army.mil/Missions/HTRW/FUSRAP/Luckey-Site/ The U.S. Army Corps of Engineers Buffalo District is excavating soils contaminated with beryllium, radium-226, thorium-230, uranium-234, uranium-238, and lead from the Luckey, Ohio, site under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Corps of Engineers’ highest priority during cleanup activities at the site is to be protective of human health and the environment, ensure that work is conducted in a safe and efficient manner, and prevent the spread of contamination. The information below summarizes the progress made at the site as of the date above. These infographics are posted to the Luckey Site website on a weekly basis. Soil Excavated to Date Soil Disposed = (Totals include materials disposed during site setup.) (*983,782 additional gallons of water were transported for off-site treatment.) One Trip to Disposal Facility = 72.5 miles Transported for Disposal Gilbert Road Luckey Road % Excavation Complete % Restoration Complete Phase 5 Phase 4 Phase 3 Phase 2 36,593 Tons 39,440 Cubic yards 2, 220 Truckloads 2, 220 Truckloads 24 % Site Excavation Complete SEPTEMBER 13 Data through 9/13/19 1,165,911 Gallons Water Treated* 32% Reused 68% Released 0 0 5 9 0 6 1 92 % Complete Phase 1

Upload: others

Post on 16-Oct-2021

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Soil Soil Disposed Excavated to Date 36,593

Luckey Site CleanupFormerly Utilized Sites Remedial Action Program

Luckey, Ohio

Phone: 1-800-833-6390 (Option 4) . Email: [email protected] Web: http://www.lrb.usace.army.mil/Missions/HTRW/FUSRAP/Luckey-Site/

The U.S. Army Corps of Engineers Buffalo District is excavating soils contaminated with beryllium, radium-226, thorium-230, uranium-234, uranium-238, and lead from the Luckey, Ohio, site under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Corps of Engineers’ highest priority during cleanup activities at the site is to be protective of human health and the environment, ensure that work is conducted in a safe and efficient manner, and prevent the spread of contamination. The information below summarizes the progress made at the site as of the date above. These infographics are posted to the Luckey Site website on a weekly basis.

Cubic Yards Excavated to Date

6,864

Soil Excavated to Date

Soil Disposed

=

(Totals include materials disposed during site setup.)

(*983,782 additional gallons of water were transported for off-site treatment.)

One Trip to Disposal Facility = 72.5 miles

Transported for Disposal

Gilbert Road

Luck

ey R

oad

% Excavation Complete

% Restoration Complete

Phase 5

Phase 4

Phase 3

Phase 2

36,593Tons

39,440Cubic yards

2,220Truckloads

2,220Truckloads

24% Site Excavation Complete

SEPTEMBER13

Data through 9/13/19

1,165,911Gallons Water Treated*

32% Reused

68% Released

0059061

Percentage3 x 92% is 2.76

92%CompletePhase 1