• NYS Department of Environmental Conservation Environmental Regulatory Agency

Division of Environmental Remediation

• NYS Department of Health Public Health Regulatory Agency

Bureau of Environmental Exposure Investigation

• Unisys Corporation Corporate Successor to Remington Rand Corporation

• Elmira City School District Environmental Management and Facilities Maintenance

Page 3: Soil Cleanup IRM #2 Former Sperry Remington - North

3

New York State Department of Environmental Conservation

&Department of Health Representatives

Bernette Schilling P.E., NYSDEC HWR Engineer

Tim Schneider P.E., NYSDEC Project Manager

Dawn Hettrick P.E., NYSDOH Project Manager

Unisys Corporation

Kevin Krueger, Director of Global Environmental, Safety, Health

and Security

Paul Brookner, Geosyntec Consultants

Page 4: Soil Cleanup IRM #2 Former Sperry Remington - North

4

Meeting Agenda

• Introduction

• General Overview & Historic Site Use - NYSDEC

• Previous Environmental Activities at EHS – NYSDEC

• Health Overview – NYSDOH

• Site Characterization & Response Actions at EHS– Unisys

• Proposed Interim Remedial Measure #2 - Unisys

• Next Steps – NYSDEC

• Questions and Answers - All

Page 5: Soil Cleanup IRM #2 Former Sperry Remington - North

5

General Overview Environmental Cleanup Process

• Environmental Investigation

Defines the nature and extent of contamination

• Interim Remedial Measures

Address defined contamination prior to the site remedy

• Environmental Remediation

Evaluates & implements effective cleanup & mitigation

techniques

• Site Management

Monitors and maintains the effectiveness of remedy

Page 6: Soil Cleanup IRM #2 Former Sperry Remington - North

6

Historic Background of Industrial Site Use

Morrow Manufacturing Co. from 1909-1935

Post Card rendering circa 1916Post Card rendering circa 1930

Page 7: Soil Cleanup IRM #2 Former Sperry Remington - North

7

Remington Rand Corp. from 1936-1972

Photo circa 1944-48

Historic Background of Industrial Site Use

Page 8: Soil Cleanup IRM #2 Former Sperry Remington - North

8

Elmira High School circa 1979

Southern Tier Commerce Center

Current Configuration

Page 9: Soil Cleanup IRM #2 Former Sperry Remington - North

9

July 9, 2015

Page 10: Soil Cleanup IRM #2 Former Sperry Remington - North

10

Investigation of Pipes, Structures, Sediments & Surface Waters

Drainage Pipe Culvert

Environmental Findings

at Former Sperry Remington Site #808043

Former IndustrialStructures

Former IndustrialStructure

Page 11: Soil Cleanup IRM #2 Former Sperry Remington - North

11

• 2013 - DEC Identified Areas of Environmental Concern

Environmental Studies & Response Actions

at Sperry Remington- North Portion #808022

22

2

2

2

1

3

3

86

7

7

94 3

14

12

12

13

17

16

11

5

8

15

10

Environmental Management• Maintains Protective Covers• Maintains Soil Vapor Mitigation• Reduces Exposures During

Excavation & Construction

Environmental Areas of Concern • Below Ground• Low Risk of Exposure• Response Actions Will Be Taken

to Reduce Potential Exposures

Page 12: Soil Cleanup IRM #2 Former Sperry Remington - North

12

• 2017 – Primary Contaminant of Concern – PCBs

Environmental Characterization

at Sperry Remington- North Portion #808022

PCBsin soil

PCBsin soil

PCBsin soil

VOC

VOC

PCB

PCB

Page 13: Soil Cleanup IRM #2 Former Sperry Remington - North

13

• 2017 – IRM #1 Soil Cleanup Areas

Interim Remedial Measure #1

at Sperry Remington- North Portion #C808022

2017 EHS Capital Improvements

Soil Cleanup

AreaSoil Cleanup Area

Page 14: Soil Cleanup IRM #2 Former Sperry Remington - North

14

• 2018 – IRM #2 Soil Cleanup Areas

Proposed Interim Remedial Measure #2

at Sperry Remington- North Portion #C808022

2018 EHS CapitalImprovements

Soil Cleanup

Area

Page 15: Soil Cleanup IRM #2 Former Sperry Remington - North

Role at Elmira High School

Assess how people can be exposed

to contamination at the site and

assess ways to prevent that

exposure.

Page 16: Soil Cleanup IRM #2 Former Sperry Remington - North

16

Potential Exposure Pathways

• Direct contact – Touching contaminated

soil, groundwater or surface water

• Ingestion – Drinking or eating

contaminated water or other substance

• Inhalation – Breathing contamination in the

form of chemical vapors or dust

Page 17: Soil Cleanup IRM #2 Former Sperry Remington - North

17

Direct Contact

• Contaminated soil is covered, therefore

direct contact is not occurring.

• Plans are in place to maintain the cover.

• Procedures are in place for proper

handling of soils that are disturbed.

Page 18: Soil Cleanup IRM #2 Former Sperry Remington - North

18

Ingestion

• Public water is supplied to the surrounding

area, therefore ingestion of contaminated

groundwater is not occurring.

Page 19: Soil Cleanup IRM #2 Former Sperry Remington - North

19

Inhalation

• Soil vapor intrusion, also know as SVI, is a process

where chemical vapor under a building move into the

building.

• The HVAC system has been adjusted to provide “positive

pressure” throughout the building.

• A sub-slab depressurization system (SSDS) has been

installed and continues to operate in portions of the

building.

• A community air monitoring plan is implemented when

there is digging into contaminated soil.

Page 20: Soil Cleanup IRM #2 Former Sperry Remington - North

20

How are potential exposures being

addressed?

• Environmental Management Plan

• Soils Management Plan

• Indoor Air Quality Action Plan

• Operation, Monitoring and Maintenance Plan

• Potential exposure pathways are re-evaluated whenever

new information become available or conditions change.

• The interim remedial measures are removing soil that is

known to be contaminated from the site.

Page 21: Soil Cleanup IRM #2 Former Sperry Remington - North

21

During construction?

• Community Air Monitoring Plan – Monitors the air for

dust and calls for measures if the levels of dust go

above our action levels.

• Engineering controls will be in place to minimize dust

generation and prevent access to the work area.

• Health and Safety Plan – Implemented to protect

workers and the school community.

Page 22: Soil Cleanup IRM #2 Former Sperry Remington - North

22

Going Foreword

• Continued maintenance of cover system,

operation and maintenance of HVAC system

and SSDS, and routine pressure monitoring.

• Implementation of any other actions necessary

to prevent exposures to staff, students and the

community

Page 23: Soil Cleanup IRM #2 Former Sperry Remington - North

Investigation and

Remediation Efforts

Through Summer 2018

2 May 2018

Former Sperry Remington Site – North Portion

(#c808022)

Page 24: Soil Cleanup IRM #2 Former Sperry Remington - North

Historic Background of Industrial Site Use

Morrow Manufacturing Co. from 1909-1935

Post Card rendering circa 1916Post Card rendering circa 1930

Page 25: Soil Cleanup IRM #2 Former Sperry Remington - North

Recent Timeline of Unisys Response Actions

• June 2013: NYSDEC contacts Unisys regarding EHS and requests Indoor Air Quality (IAQ) sampling.

• July 2013: Unisys conducts HVAC assessment and IAQ sampling.

• December 2013: Unisys conducts IAQ sampling during heating season.

• July 2014: Unisys begins Site Characterization of soil, groundwater, and former combined storm sewer.

• July 2014: Unisys conducts comprehensive indoor air and sub-slab sampling.

• August 2014: Unisys installs sub-slab depressurization system under Room-127 (F-Wing). Air monitoring performed on regular basis.

Page 26: Soil Cleanup IRM #2 Former Sperry Remington - North

Timeline of Unisys Response Actions

• March 2015: At request of NYSDEC/DOH, Unisys

installs temporary STRA to minimize potential PCB

exposure.

• July 9, 2015: NYSDEC Public Meeting.

• July 2015: Site Characterization continues.

• Spring & Summer 2016: Site Characterization

continues to address data gaps.

• January 2017: Nature of work shifts from Site

Characterization to IRM Design and

Implementation to accommodate EHS

construction.

Page 27: Soil Cleanup IRM #2 Former Sperry Remington - North

Timeline of Unisys Response Actions

• May 22, 2017: NYSDEC Public Meeting

• Winter/Spring 2017: Pre-Design Investigation for

Summer 2017 Interim Remedial Measure (IRM) #1.

• June-September 2017: IRM #1 implemented – soil

excavated at tennis courts, main parking lot area, and

football field coordinating with EHS capital

improvements.

• Winter/Spring 2018: Pre-Design Investigation for IRM

#2.

• May 2, 2018: NYSDEC Public Meeting

• June-September 2018: IRM #2 planned in rear parking

lot and coordinate with EHS capital improvements.

Page 28: Soil Cleanup IRM #2 Former Sperry Remington - North

Indoor Air Quality at EHS: Air

Monitoring and Mitigation

Page 29: Soil Cleanup IRM #2 Former Sperry Remington - North

Approach to Protect Indoor Air at EHS

• The potential risk: vapor

intrusion of organic

compounds into indoor air

• The approach:

– July 2013: Assess HVAC effectiveness to prevent vapor intrusion and IAQ sampling

– December 2013: IAQ sampling

– July 2014: Comprehensive air quality monitoring

– August 2014: Sub-slab depressurization

Vapor intrusion

Page 30: Soil Cleanup IRM #2 Former Sperry Remington - North

June 2013: Existing HVAC System Is Protective

• Building investigation study indicates that when the

HVAC system is operating, the building is positively

pressurized preventing sub slab vapors from

entering the school.

• Study repeated in July 2014 – similar results.

Page 31: Soil Cleanup IRM #2 Former Sperry Remington - North

HVAC Pressure Differential Data

Placeholder graphic – will update

and improve

Page 32: Soil Cleanup IRM #2 Former Sperry Remington - North

July 2014: Unisys Conducts Comprehensive Air Sampling

Indoor Air Sampling Location

Sub-Slab Vapor Sampling

Location

Summa® canister apparatus

used for air sampling

23 indoor air and 23

sub-slab samples:

All indoor air below

NYSDOH criteria

Page 33: Soil Cleanup IRM #2 Former Sperry Remington - North

August 2014: Unisys Installs SSD System

Conceptual diagram of SSD

system.

Pre-Existing

SSD Area

Pre-Existing

SSD Area

Pre-Existing

SSD Area

2014 SSD Area

Page 34: Soil Cleanup IRM #2 Former Sperry Remington - North

SSD System Improves Indoor Air at EHS

NYSDOH Indoor Air Criteria

(Before August 2015)

NYSDOH Indoor Air Criteria

(After August 2015)

SSD System Operational

TCE Concentrations in Indoor

Air: Room 127 (F-Wing)

Page 35: Soil Cleanup IRM #2 Former Sperry Remington - North

Soils at EHS: Investigation and

Remedial Measures

Page 36: Soil Cleanup IRM #2 Former Sperry Remington - North

A Comprehensive Soil Sampling Program

• 1,083 Borings, 2,658 Samples for PCBs, Metals, SVOCs, Pesticides/Herbicides, and VOCs

• Overall strategy: grid pattern to survey, bias sampling to historic industrial operations, dense sampling when compounds of concern found.

Page 37: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Strategy

• ESH Environmental Management Plan (EMP)– Cover inspection– Soil disturbance program

• Mitigate potential exposure pathways while a permanent remedy is established– Mulch bed STRA– Shallow soil excavation in FB field– IRMs as Source Removal Strategy will be proposed as part of the final

remedy

• Complete a comprehensive site investigation

• Work with stakeholders to develop a final remedial action program

Page 38: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Protect Human Health

• Adequate cover between contaminated soil and surface is protective– EMP inspection program

– Asphalt

– Concrete

– Well-established turf

• Minimize potential PCB exposure route via direct contact

• March 2015, Unisys installed mulch beds w/ geotextile in areas without well-established turf. Mulch refreshed annually at a minimum

Mulch bed to prevent direct

contact between people and soil

Page 39: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Protect Human Health

• In August 2017, surface soil

excavated in south portion

of FB field as further

protective measure

• Turf restored following

excavation

• Minimizes potential PCB

exposure route via direct

contact

Page 40: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Protect Human Health

STRA areas

Surface Soil Excavation

and Backfill

Summer 2015 September 2018

Page 41: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Longer-Term Solutions

Page 42: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Longer-Term Solutions

Excavation Areas

Summer 2017 - Approximately 4,000 tons of soil excavated and transported off-site for disposal; excavations were backfilled for tennis court and parking lot construction and site restoration

Page 43: Soil Cleanup IRM #2 Former Sperry Remington - North

PCBs in Soil: Continue Site Investigation

• 190 borings already collected in 2018

• Sampling will continue as needed to refine delineation and complete remedial design

• Excavation is a precise process – dense sampling needed to guide dig

Page 44: Soil Cleanup IRM #2 Former Sperry Remington - North

Other Investigations at EHS

Page 45: Soil Cleanup IRM #2 Former Sperry Remington - North

Groundwater Investigation is Ongoing

Groundwater investigation is ongoing - 138 samples collected

Temporary

Well

Monitoring

Well

Page 46: Soil Cleanup IRM #2 Former Sperry Remington - North

Investigation of Site Sewers is Ongoing

• Sewer investigation is ongoing - samples collected

from inside sewer, multiple camera surveys

• Soil borings adjacent to suspected sewer line

breaks

Former Combined

Industrial Sewer

Current EHS

Storm Water

Sewer

Page 47: Soil Cleanup IRM #2 Former Sperry Remington - North

Summer 2018 IRM

Page 48: Soil Cleanup IRM #2 Former Sperry Remington - North

Protective Measures During Excavation

Security fencing and signageWorker PPE: Safety

glasses, hard hat, steel

toe boots, gloves, high-

viz, training

All equipment is covered &

decontaminated before leaving site

Worker and

Community Safety is

Priority Number One

Traffic control on/off

Main Street

Page 49: Soil Cleanup IRM #2 Former Sperry Remington - North

Protective Measures During Excavation

Excavated soil is covered prior to

disposalDust control and

multiple air/dust

monitoring points

Storm sewers protected from

debris during construction

Worker and Community Safety is Priority

Number One

Page 50: Soil Cleanup IRM #2 Former Sperry Remington - North

Rear Parking Lot Excavation

2

ft

4

ft

6

ft 8

ft

10

ft

12 ft

Summer 2018 - Approximately 28,000 tons of soil estimated to be excavated and transported off-site for disposal; excavation will be backfilled for parking lot construction and site restoration

Page 51: Soil Cleanup IRM #2 Former Sperry Remington - North

Rear Parking Lot Excavation

Haul Roads mid-June through the end of August:

EHS to MSA - 30-40 loads per day

Offsite Transport and Disposal - 35 loads per day

MSA

Page 52: Soil Cleanup IRM #2 Former Sperry Remington - North

Sheet Piling Used as Needed

Piling will be used to protect

structures and ensure soil

removal to design limits

Page 53: Soil Cleanup IRM #2 Former Sperry Remington - North

Schedule for Summer 2018

t

Site Culvert

Page 54: Soil Cleanup IRM #2 Former Sperry Remington - North

54

Next StepsIRM #2 Work Plan

• DEC approves soil cleanup work plan

• Summer 2018 Cleanup Work :

Starts in June and will be completed by end of August

DEC will provide oversight of activities

Unisys will have full-time qualified environmental staff on-site to:

• Manage soil excavation, storage, disposal and site restoration

• Monitor dust / air quality and take actions to mitigate issues

• Manage health and safety protocols

Page 55: Soil Cleanup IRM #2 Former Sperry Remington - North

55

To Stay Informed

List-Serv Signup

www.dec.ny.gov/chemical/61092.html

NYSDEC Project Webpage

https://www.dec.ny.gov/chemical/102390.html

Document Repository

Elmira Steele Memorial Library

101 East Church Street

Elmira, NY 14901

Phone (607) 733-9175

Page 56: Soil Cleanup IRM #2 Former Sperry Remington - North

56

CONTACT INFORMATION

Tim Schneider, NYSDEC

6274 East Avon-Lima Road

Avon, New York 14414

585-226-5480

[email protected]

Dawn Hettrick, NYSDOH

Empire State Plaza, Corning Tower Rm #1787

Albany, NY 12237

518-402-7860

[email protected]

Page 57: Soil Cleanup IRM #2 Former Sperry Remington - North

57

CONTACT INFORMATION

Kevin Krueger, Unisys Corporation

651-212-7273

[email protected]

Page 58: Soil Cleanup IRM #2 Former Sperry Remington - North

58

QUESTIONS?