SITE VISIT REPORT (Architectural) PROJECT DETAILS PROJECT NAME : PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAD TERMINAL (SOGT) ELEVATED ACCESS ROAD FOR PETRONAS CARIGALI SDN. BHD. PROJECT SCOPE : MAIN SECURITY BUILDING (MSB) & VISITOR TOILET (VT) DATE : 7 OCTOBER 2015 (Wednesday) TIME : 9.00 a.m. to 1.00 p.m. INTRODUCTION The objective of this site visit is to check and confirm the type of Architectural finishes on the existing Administartion Building and exisiting Security Building (External & Internal). Observation & study of space/area usage has been take into a consideration of the new design of Main Security Building (MSB) and Visitor Toilet (VT). OVERALL DESIGN In general, Architectural Image of the existing Administration Building and Security Building is Modern Architecture. External finishes mostly are using Mild Steel, brickwalls with plaster bothsides, glass panels and metal decking for the roof. Internal finishes mostly are using floor & wall tiles, painting works and glass panels. CONCLUSION We will incoorporate almost all of the existing Architectural finishes into our new building design as requested by Petronas Carigali Sdn Bhd. Some elements may follow the standards of PETRONAS Technical Standard (PTS) and Jabatan Kerja Raya (JKR) and other relevant recognised standards as stated in the Design Brief. Please refer existing building photos. PHOTOS – Existing Buildings 1

Upload: abd-halim-rajap

Post on 03-Feb-2016

54 views

Category:

Documents


2 download

DESCRIPTION

Sample of engineering/architectural site visit report prior to engineering design stage of construction.

TRANSCRIPT

Page 1: SOGT - Architectural Site Visit Report

SITE VISIT REPORT(Architectural)

PROJECT DETAILS

PROJECT NAME : PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAD TERMINAL (SOGT) ELEVATED ACCESS ROAD FOR PETRONAS CARIGALI SDN. BHD.

PROJECT SCOPE : MAIN SECURITY BUILDING (MSB) & VISITOR TOILET (VT)

DATE : 7 OCTOBER 2015 (Wednesday)

TIME : 9.00 a.m. to 1.00 p.m.

INTRODUCTION

The objective of this site visit is to check and confirm the type of Architectural finishes on the existing Administartion Building and exisiting Security Building (External & Internal). Observation & study of space/area usage has been take into a consideration of the new design of Main Security Building (MSB) and Visitor Toilet (VT).

OVERALL DESIGN

In general, Architectural Image of the existing Administration Building and Security Building is Modern Architecture. External finishes mostly are using Mild Steel, brickwalls with plaster bothsides, glass panels and metal decking for the roof. Internal finishes mostly are using floor & wall tiles, painting works and glass panels.

CONCLUSION

We will incoorporate almost all of the existing Architectural finishes into our new building design as requested by Petronas Carigali Sdn Bhd. Some elements may follow the standards of PETRONAS Technical Standard (PTS) and Jabatan Kerja Raya (JKR) and other relevant recognised standards as stated in the Design Brief.

Please refer existing building photos.

PHOTOS – Existing Buildings

1

Page 2: SOGT - Architectural Site Visit Report

Location : Administration Building (Main Lobby)

- Safety Rules Signages- (Perspects & Stickers materials)

Location : Administration Building (Main Lobby)

- Building Level Signages- (Perspects & Stickers materials)

Location : Administration Building (Female Toilet)

- Symbol Signages- (Perspects & Stickers materials)

Location : Administration Building (Female Toilet)

- Internal doors- (Cubical system)

2

Page 3: SOGT - Architectural Site Visit Report

Location : Administration Building (Female Toilet)

- Sanitary Fitting- (Johnson Suisse brand)

Location : Masjid (Ablution)- Adjustable tap- Wall tiles- Well ventilation system to maintain

dry area

Location : Masjid (Ablution)- Aluminium strip louvers- Well ventilation system to maintain

dry area

Location : Masjid (Praying Area)- Carpet Floor Finishes- No power point provided- Provide proper shelves for ‘Sejadah’

& etc

3

Page 4: SOGT - Architectural Site Visit Report

Location : Office- Workstation- Floor Tiles

Location : Office- Workstation- Floor Tiles

Location : Office- Workstation- Top Hung Windows- Suspended Ceiling- Air-cond Duct- Florecent Recess Lamp

Location : Office- Suspended Ceiling- Air-cond Duct- Florecent Recess Lamp- PA System

4

Page 5: SOGT - Architectural Site Visit Report

Location : Fire Station (Bomba)- Fire Truck

Location : Security Building- Aluminium Louvers to cover Air-cond

compressor- Exposes Roof Truss- PA System

Location : Security Building- One way view windows- Reflected Tinted Windows

Location : Security Building- Tripod Turnstile

5

Page 6: SOGT - Architectural Site Visit Report

Location : Security Building- Overall view

6