sns bl-13b npdgamma experimentlh2targ/npdg/supporting documents... · sns bl-13b npdgamma...

19
SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System Design Review April 7, 2010 C-156 9:00 – 10:30 PM

Upload: trinhkhanh

Post on 02-Feb-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

SNS BL-13B NPDGammaExperiment

Hydrogen Supply to Cryogenic Target , Relief and Vent System Design Review

April 7, 2010C-1569:00 – 10:30 PM

Page 2: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

2 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Hydrogen System Block Diagram

Diagram of Major System Components

Page 3: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

3 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Hydrogen System Schematic

Page 4: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

4 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

H2 Cylinder Storage Cabinet Shared w/ BL-11A

Page 5: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

5 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

BL-13 Cave w/Shielding In-Place

Vent Stack

Vent Isolation Box

Cryo Coolers

Page 6: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

6 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Overview Showing Target Vent from Cave to Vent Isolation Box and Vent Line Outside Building

Vent Stack

Vent Isolation Box

Target Hydrogen Vent

Page 7: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

7 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Target Vent Going Over Beamstop

Target Hydrogen Vent

Page 8: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

8 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Vent Isolation Box Just North of Cave

Vent Isolation Box

Page 9: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

9 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Vent Isolation Box on Platform Outside Cave Above Vent Isolation Cabinet

Vent Isolation Platform

Vent Isolation Cabinet

Page 10: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

10 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Vent Isolation Box Internals

Box & Cabinet Vent Line

Relief Vent Line

Relief Valves and Rupture Discs

Vacuum Turbo Pumps

Page 11: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

11 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Vent Stack from Vent Isolation Box Leaving Building

Box & Cabinet Vent Line

Relief Vent Line

Page 12: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

12 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Hydrogen System Major Equipment

• HYDROGEN, ARGON, HELIUM GAS CYLINDERS• TRANSFER TUBING 0.25-INCH x 0.035” WALL• GAS PANEL CABINET• HYDROGEN FILL TUBE 1.5-INCH X 0.065” WALL• LH2 VESSEL / VACUUM CHAMBER• DOUBLE WALL HYDROGEN VENT TUBING

– INNER HYDROGEN VENT TUBE 1.5-INCH X 0.065” WALL– OUTER VACUUM / VENT TUBE 6.0-INCH” X 0.083” WALL– METAL BELLOWS

• VENT ISOLATION CABINET• VENT ISOLATION BOX 10” NPS , Sch. 10• HYDROGEN VENTS TO ATMOSPHERE 6” NPS, Sch 5 & 8” NPS

Page 13: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

13 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Safety Considerations• SEISMIC INTERACTION ( PC 0 OVER PC 2 ) • DESIGN / CONFIGURATION CONTROL• ACCIDENT MITIGATION• OVERPRESSURE PROTECTION• ARGON UTILIZATION• HYDROGEN DEFLAGRATION / DETONATION• LOSS OF VACUUM IN 6-INCH LINE• RUPTURE OF 1.5-INCH LINE• FIRE IN TARGET BUILDING• MATERIAL EMBRITTLEMENT

– CRYOGENIC– HYDROGEN

Page 14: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

14 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Codes and Standards

• DOE-STD-1020• DOE-STD-1021• ASME B 31.3, “Process Piping”• ASME B 31.12-2008, “Hydrogen Piping and Pipelines”• CGA S-1.3, “Pressure Relief Device Standards-Part 3-

Compressed Gas Stationary Storage Containers”• CGA G-5.5 – 2004, “Hydrogen Vent Systems”• EJMA, “Expansion Joint Manufacture Association”

Page 15: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

15 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Design Loadings• DEADWEIGHT SPANS PER MSS SP 69• NORMAL OPERATING PRESSURE• POSTULATED OVERPRESSURE EVENTS • THERMAL EXPANSION / CONTRACTION• SEISMIC

– IBC-2007– PERFORMANCE CATEGORY 2– SITE CLASS D– IMPORTANCE FACTOR = 1.5

• WIND / TORNADO• DEFLAGRATION / DETONATION • THRUST LOADINGS• BELLOWS• VENT DISCHARGE

Page 16: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

16 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

Hydrogen Vents to Atmosphere

• 6-INCH FROM VENT ISOLATION BOX• 8-INCH FROM GAS PANEL CABINET & VENT ISOLATION CABINET• WELDED VERSUS VICTAULIC• AUSTENETIC STAINLESS ( TP 304 ) MATERIAL • MINIMIZE ( L / D ) RATIO • L / D > 60 BUT < 100 DEFLAGRATION• L / D > 100 DETONATION• DISCHARGE HEIGHT• 10-FEET ABOVE GRADE

• TOP OF ROOF• WIND / TORNADO / MISSLES• LOW POINT DRAIN

Page 17: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

17 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

H2 Bottle Rack Shared with BL-11A

Page 18: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

18 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

ALLOWABLE WORKING PRESSURELH2 VESSEL / MAIN VACUUM CHAMBER

• LH2 Vessel– Internal pressure: (1) Cylindrical Shell Pint = 279 psi

(2) Entrance Window Pint = 132 psi(3) Exit Window Pint = 207 psi

– External pressure: (1) Cylindrical Shell Pext = 81 psi(2) Entrance Window Pext = 16 psi(3) Exit Window Pext = 296 psi

• Main Vacuum Chamber– Internal pressure: (1) Cylindrical Shell Pint = 399 psi

(2) Entrance Window Pint = 32 psi(3) Exit Window Pint = 90 psi(4) Rectangular Box Pint = 99 psi

– External pressure: (1) Cylindrical Shell Pint = 134 psi(2) Entrance Window Pint = 134 psi(3) Exit Window Pint = 208 psi(4) Rectangular Box Pint = 99 psi

Page 19: SNS BL-13B NPDGamma Experimentlh2targ/NPDG/Supporting Documents... · SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target , Relief and Vent System ... • ASME B 31.12-2008,

19 Managed by UT-Battellefor the U.S. Department of Energy NPDGamma H2 System Design Review

VICTAULIC COUPLING CAPACITY