Contract No. : GE / 2006/35 Slope No. & Location: Feature 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island Sheet No.____________ Soil Nail No. C8 120 20˚ Y25 / 4 13/12/08 45.26 84.1 14 13/12/08 C10 120 20˚ Y25 / 4 13/12/08 45.26 83 13 13/12/08 C11 120 20˚ Y25 / 4 13/12/08 45.26 85.4 13 13/12/08 C12 120 20˚ Y25 / 3 13/12/08 33.94 51.6 10 13/12/08 C13 120 20˚ Y25 / 3 13/12/08 33.94 52.4 9 13/12/08 C14 120 20˚ Y25 / 3 13/12/08 33.94 54.2 10 13/12/08 B10 120 20˚ Y25 / 4 13/12/08 45.26 8 13 13/12/08 B11 120 20˚ Y25 / 4 13/12/08 45.26 50.4 14 13/12/08 B4 120 20˚ Y25 / 3 13/12/08 33.94 50.8 7 13/12/08 B5 120 20˚ Y25 / 3 13/12/08 33.94 53.3 7 13/12/08 Name, Post and Specimen Signature of Contractor's supervisory personnel : Au Yeung Wai Shun Name, Post and Specimen Signature of the Engineer's site staff : ________________________________________________ Submitted by: (Name and Signature) Contractor's Site Representative Works Order No. + : GE/2006/35/64/BCR114/01 Soil Nails Installation and Grouting Record (to be completed by the Contractor) Diameter of Drillhole Inclination of Drillhole Diameter and Total Length of Steel Bar inserted (m) Date of Insertion of Steel Bar Theoretical Volume of Grout Required (litres) (Note 1) Vol. of grout used for grouting the drillhole (litres) Vol. of Grout refilled to drillhole after grout settlement (litres) Date of Grouting Contractor's supervisory personnel (Signature & Date) Checked by the Engineer's site staff (Signature & Date) Remarks (Anomalies observed during nail installation and grouting) Note 1 : No need to deduct the volume of the steel bar and other components forming the soil nail. Legend : + For schedule of rates contracts only. Date : _____________

Upload: terence-cheung

Post on 02-Dec-2014

31 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SN Final Full Record

Contract No. : GE / 2006/35

Slope No. & Location: Feature No. 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Sheet No.____________

Soil Nail No. Date of Grouting

C8 120 20˚ Y25 / 4 13/12/08 45.26 84.1 14 13/12/08

C10 120 20˚ Y25 / 4 13/12/08 45.26 83 13 13/12/08

C11 120 20˚ Y25 / 4 13/12/08 45.26 85.4 13 13/12/08

C12 120 20˚ Y25 / 3 13/12/08 33.94 51.6 10 13/12/08

C13 120 20˚ Y25 / 3 13/12/08 33.94 52.4 9 13/12/08

C14 120 20˚ Y25 / 3 13/12/08 33.94 54.2 10 13/12/08

B10 120 20˚ Y25 / 4 13/12/08 45.26 8 13 13/12/08

B11 120 20˚ Y25 / 4 13/12/08 45.26 50.4 14 13/12/08

B4 120 20˚ Y25 / 3 13/12/08 33.94 50.8 7 13/12/08

B5 120 20˚ Y25 / 3 13/12/08 33.94 53.3 7 13/12/08

Name, Post and Specimen Signatureof Contractor's supervisory personnel : __________________ Au Yeung Wai Shun

Name, Post and Specimen Signatureof the Engineer's site staff : ________________________________________________ Submitted by: (Name and Signature)

Contractor's Site Representative

Works Order No.+ : GE/2006/35/64/BCR114/01

Soil Nails Installation and Grouting Record (to be completed by the Contractor)

Diameter of Drillhole

Inclination of Drillhole

Diameter andTotal Length of

Steel Bar inserted (m)

Date of Insertion of Steel Bar

Theoretical Volume of Grout Required

(litres) (Note 1)

Vol. of grout used for grouting the drillhole

(litres)

Vol. of Grout refilled to drillhole aftergrout settlement

(litres)

Contractor's supervisory personnel(Signature & Date)

Checked by the Engineer's site staff

(Signature & Date)

Remarks(Anomalies observed duringnail installation and grouting)

Note 1 : No need to deduct the volume of the steel bar and other components forming the soil nail.Legend : + For schedule of rates contracts only.

Date : _____________

Page 2: SN Final Full Record

Contract No.: GE/2006/35 Page No.:

Feature No.: 14NE-B/CR114 Sub Contractor's Name:

Location: No. 11-13, Tai Shan East, Lamma Island Prepared By:

Description Hole No. Date of Drilling Date of Grouting

Minutes/MetreC8 10-Dec-08 13-Dec-08 4 120 25

6 6 6 5 5 5 5 5

Soil/Rock/Concrete S S S S S S S S

Minutes/MetreC10 10-Dec-08 13-Dec-08 4 120 25

5 5 6 6 5 5 5 5

Soil/Rock/Concrete S S S S S S S S

Minutes/MetreC11 08-Dec-08 13-Dec-08 4 120 25

4 5 5 6 5 5 5 5

Soil/Rock/Concrete S S S S S S S S

Minutes/MetreC12 08-Dec-08 13-Dec-08 3 120 25

5 5 5 6 6 5

Soil/Rock/Concrete S S S S S S

Minutes/MetreC13 09-Dec-09 13-Dec-08 3 120 25

4 4 5 5 5 5

Soil/Rock/Concrete S S S S S S

Minutes/MetreC14 09-Dec-09 13-Dec-08 3 120 25

5 5 5 5 5 5

Soil/Rock/Concrete S S S S S S

Minutes/MetreB10 09-Dec-09 13-Dec-08 4 120 25

14 5 5 5 6 6 5 5

Soil/Rock/Concrete CS S S S S S S S

Minutes/MetreB11 09-Dec-09 13-Dec-08 4 120 25

15 5 5 5 5 5 6 6

Soil/Rock/Concrete CS S S S S S S S

Minutes/MetreB4 10-Dec-09 13-Dec-08 3 120 25

4 5 5 6 5 5

Soil/Rock/Concrete S S S S S S

Minutes/MetreB5 10-Dec-09 13-Dec-08 3 120 25

5 6 6 5 5 5

Soil/Rock/Concrete S S S S S S

Checked By: Initial Record For Drilling Works Witness / Checked By:

Site In-charge [Soil Nailing / Rock Dowel / Raking Drain] Supervisor

Consultant Office

Grout Length (m)

Hole Dia (mm)

Bar Dia (mm)

Grouting Time (min)

0.5 m

1 m

1.5 m

2 m

2.5 m

3 m

3.5 m

4 m

4.5 m

5 m

5.5 m

Page 3: SN Final Full Record
Page 4: SN Final Full Record

Page No.:

Sub Contractor's Name:

Prepared By:

6 m 6.5m 7.5m 8.5m 9.5m 10m

Witness / Checked By:

Supervisor

Consultant Office

7 m

8 m

9 m

Page 5: SN Final Full Record
Page 6: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C8

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 4 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 4 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 10-Dec-08

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 45.26 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35 40 45 50

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 7: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C10

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 4 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 4 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 10-Dec-08

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 45.26 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35 40 45

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 8: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C11

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 4 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 4 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 08-Dec-08

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 45.26 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35 40 45

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 9: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C12

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 3 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 3 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 08-Dec-08

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 33.94 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 10: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C13

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 3 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 3 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 09-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 33.94 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 11: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: C14

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 3 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 3 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 09-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 33.94 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

GEO/CA/13-1 (05/95)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 12: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.:

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 4 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 4 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 09-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 45.26 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 10 20 30 40 50 60

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 13: SN Final Full Record

GEO/CA/13-1 (05/95)

Page 14: SN Final Full Record

14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: B10

Checked By:

(Name, Rank, Signature & Date)

0 10 20 30 40 50 60

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 15: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.:

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 4 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 4 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 09-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 45.26 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 10 20 30 40 50 60

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 16: SN Final Full Record

GEO/CA/13-1 (05/95)

Page 17: SN Final Full Record

14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: B11

Checked By:

(Name, Rank, Signature & Date)

0 10 20 30 40 50 60

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 18: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.:

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 3 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 3 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 10-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 33.94 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 19: SN Final Full Record

GEO/CA/13-1 (05/95)

Page 20: SN Final Full Record

14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: B4

Checked By:

(Name, Rank, Signature & Date)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 21: SN Final Full Record

Contractor: Ming Hing Waterworks Engineering Co., Ltd.

Contract No.: GE/2006/35

Slope No. & Location : 14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.:

GENERAL RECORD

N

Co-ordinates of Head E

mPD

Bar Length ( L ) 3 m

Bar Diameter ( mm ) 25 mm

Bar Steel Grade 460

Grout Length ( G ) 3 m

m

Slope Angle 70 0

Bar Inclination ( i ) 20 0

Design Workload (WL) kN

DRILLING RECORDS

Hole Diameter 120 mm

Date Drilled 10-Dec-09

Drilling Method Percussion

Flushing Medium Air

GROUTING RECORD

Date of Grouting 13-Dec-08

Grout Mix Cement

Water Cement Ratio 0.4

Time of Efflux from

Flow Cone Test 16.22 Secs.

28 day

Cube Strength MPA

Grouting Pressure 400-600 kPa

Calculated Grout Volume 33.94 L DRILLING RECORD

Prepared By (Sheets 1 to 3): Received By: Checked By:

(Contractor's Representative) (Name, Rank, Signature & Date) (Name, Rank, Signature & Date)

Soil Nail Record (Drilling and Grouting)

Depth of Mid Point of Grouted Length (Z)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)

Page 22: SN Final Full Record

GEO/CA/13-1 (05/95)

Page 23: SN Final Full Record

14NE-B/CR114, No. 11-13 Tai Shan East, Lamma Island

Soil Nail Ref. No.: B5

Checked By:

(Name, Rank, Signature & Date)

0 5 10 15 20 25 30 35

0

0.5

1

1.5

2

2.5

3

3.5

Accumulated Drilling Time (min)

De

pth

(m

)