smec's experince in water sector
DESCRIPTION
This provides a broad picture of SMEC's recent experince in Water sector.TRANSCRIPT
SMEC PowerPoint presentation template
National Master Plan for Wastewater, Botswana (2003)
Project ScopeEvaluate wastewater generation and disposalAssess sanitation facilities and their impacts on environmentDevelop strategies for wastewater management Develop a master plan for planning horizon up to 2027 Contract value US$ 1.35m
Our RoleAssessment of flows and loadsReview of national wastewater guidelines and design criteriaReview of legislation on industrial effluent and trade wastePreparation of draft Wastewater and Sanitation ActReview of institutional framework Development of master plan and preparation of staged 25-year implementation schedule
Lower Ruvu and Morogoro Water Supply, Tanzania (2009-2011)
Project ScopeExpand Lower Ruvu WTP capacityImprove and extend water supply services in Dar es Salaam Upgrade Morogoro water supply system WTP, pump station, transmission pipelines, water storage resevoirsContract value US$ 2.2m
Our RoleDesign and bidding documentsTopographic survey ands oil investigationHydraulic modelling, hydraulic testing and surveyEconomic and financial analysisEnvironmental and social impact assessment Updating of engineering designPreparation of pre-qual and tender documents
2Chimoio, Manica & Gondola Water Supply, Mozambique (2009-2012)
Project ScopeDesign review and construction supervision of Water intake extension, new water treatment plant, pump stations, water storage tanks and water transmission, distribution and reticulation systems for 3 cities
Our RoleReview of contractors design , drawings and equipments Management of design programme Assessment of environmental and social impactsMonitoring of construction progressQuality control and assurance Review of contractors interim payment statementsManagement of testing and commissioningAssistance to client during defects and liability period
Lilongwe Water Supply, Malawi (2013-2016)
Project ScopeInception study; Detailed Design of Raw Water Conveyance System (intake weir, sedimentation basin, 12km pipeline, etc)Construction SupervisionAdditional work included; Training of counterparts in hydraulic modelling.
Our Role / ServicesHydrology;Engineering;Geotechnical;Assistance to Client during Bidding ProcessConstruction Supervision;Project Management and client liaison
Nairobi Water & Sewerage Capacity Building, Kenya (07-08)
Project ScopeAssist in the institutional development aimed towards a modern, efficient and effective organization Establish modern management systemsProvide training and capacity buildingContract value US$ 1.4m
Our RoleManagement of institutional development activitiesOversight of implementation of financial management moduleAssistance in financial forecasting and budgetingEstablishment of environmental management plansProvision of training and transfer of knowledgeAssistance in management of the whole project procurement cycle
Integrated Catchment Management Project, Lesotho (2005-2010)
Project ScopeEstablish catchment management authorities for 5 catchmentsPrepare a natural resources inventoryDevelop integrated catchment management plansImplementation of the management plan on pilot areasContract value US$ 3.1m
Our RoleReview of organisational arrangement of stakeholders and recommendation of institutional structuresPreparation of resources inventories and GIS mappingPreparation of social/community development plansDevelopment of integrated catchment management plans and implementation of monitoring programmeProject management and reporting
6Integrated WRM&D Study for Pangani Basin, Tanzania (2012-2013)
Project ScopeConduct studies and prepare integrated water resources management and development plan for the Pangani BasinOur RoleHydrological studies and modelingGroundwater and conjunctive use studies and modelingRiver health and social/ environmental needs assessmentWater quality studies and modelingSector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc)Flood and irrigation studiesArusha future water supply studyIntegrated Water Resources Management Basin PlanWater Resources Information Management SystemDecision Support SystemTransboundary Water ManagementClimate change assessmentInstitutional and legal frameworkCapacity building and training
7Integrated WRM&D Study for Lake Tanganyika Basin, Tanzania (2012-2013)
Project ScopeConduct studies and prepare integrated water resources management and development plan for the Lake Tanganyika BasinOur RoleHydrological studies and modelingGroundwater and conjunctive use studies and modelingRiver health and social/ environmental needs assessmentWater quality studies and modelingSector water plans (Hydropower, Irrigation, Mining, Livestock, Rural Water Supply, Urban Water Supply, etc)Lake Tanganyika Water Balance AssessmentIntegrated Water Resources Management Basin PlanWater Resources Information Management SystemDecision Support SystemTransboundary Water ManagementClimate change assessmentInstitutional and legal frameworkCapacity building and training
8Rajasthan Urban Water Supply Upgrading, India (10-12)
Project ScopeAssess performance and operational status of all 222 urban water supply schemes in Rajasthan to facilitate policy decision making for improvement in service delivery through judicious deployment of scarce resourcesPrepare Roadmap and investment plan for year 2045.
Our RolePreparation of web-based GIS water supply asset mapsHydraulic modelling of all 222 towns water supply systemEnergy audit of 650 pump stationsNRW assessmentConjunctive water use assessment including reuse of wastewaterDevelop time bound roadmap for meeting water demand in 2045
Increasing domestic, commercial and environmental water demandKuwait Stormwater Drainage Master Plan (07-10)
Phase 1: Data Collection and MappingPhase 2: Hydraulic ModellingPhase 3: Preparation of Master PlanTypical Project: Preparation of Basin Plans for Ghaghra Gomti System, Uttar Pradesh
Bhuwalpur Mr.Kishanpur Mr.
Developed Decision Support System Modelling of current/future scenarios Stakeholder consultation
Major Water Supply Projects in Australia
Sydney
2007 2010 250ML/d Independent Verifier Melbourne
2009 2012 550ML/d Proof Engineering Adelaide
2009 2012 275ML/d Designer
Thank YouChart1 (3)8554.86464201019779.31188134719904.4310798682
Gross Margin (Rs/per Ha CA)
Chart1 (2)21095.336843705522399.260843559622355.6316402953
Gross Margin (Rs/per Ha CA)
Chart18554.86464201019779.31188134719904.431079868211024.7984892451
Gross Margin (Rs/per Ha Sown Area)
Sheet1do nothing351703317738555main canal desilting402042180419779whole system desilting407186018349904whole system lining45324600309.060111025proposedmain canal desilting8672609406521095whole system desilting9208672121722399whole system lining9190735501822356net sown area- current411115ha65.1%net sown area - proposed411115ha76.1%
Sheet2