SmartPlant Process Safety Ray Howarth. 21-22 August 2008 Hilton Opera Hotel Hanoi, Vietnam. Operating the Plant. Integrate ALL Information ... DESIGN & PROCESS Create the SMART PLANT of the Future …. Making Plants Smarter, Safer & More Profitable By Design. October 23, 2014. – 2 –. - PowerPoint PPT PresentationTRANSCRIPT

Process, Power & Marine
SmartPlant Process Safety
Ray Howarth
21-22 August 2008
Hilton Opera Hotel
Hanoi, Vietnam

Process, Power & Marine
April 20, 2023 – 2 –
Operating the Plant
Integrate ALL Information ...
DESIGN & PROCESS
Create the SMART PLANT of the Future …
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 3 –
“The process always tells on itself.” BASF Sr. Staff Engineer.
Cuts through information overload“It’s not WHATWHAT you know, it’s WHENWHEN you know it!”
FALCONEER Listens … Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 4 –
Smart Plant of the Future - NOW
The Virtual Engineer in the Smart Process The Right Information Automatically Provided at the Right Time Cost Savings, Increased Production Improved Daily Workflow Better, More Timely Decision-Making Enhanced Safety
BENEFITS & ROI
FALCONEER™ IV - SPPID FALCONEER™IV Process Performance Solution - Making
Plants Smarter, Safer & More Profitable by Design SmartPlant Enterprise Bundle for O/O SmartPlant Enterprise (SPO) for O/O Smart Link from Control Systems to SAP
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & MarineThe Drivers/Challenges
Support of Plant Strategy Production, quality, safety, resource utilization
Reduce Operational Risks such as: Production interruption Regulatory compliance Safety Incidents Knowledgeable Workforce
Reduce Engineering Costs such as: Turnaround/Outage Planning & Execution Preventative Maintenance Planning & Execution Inspections
Reduce operational overhead cost (contractors / own staff) How to retain knowledge How to regain knowledge
Making Plants Smarter, Safer & More Profitable By Design
SMART PLANT
PERFECT PLANT
INTELLIGENT PLANT
of the FUTURE
SMART PLANT
PERFECT PLANT
INTELLIGENT PLANT
of the FUTURE

Process, Power & Marine
April 20, 2023 – 6 –
Operation at Design Operation at Capacity Instrumentation Calibration Safety Systems ISO Systems Environmental Systems
Design Validation & Operational RiskMaking Plants Smarter, Safer & More Profitable By Design

Process, Power & MarineWhat is FALCONEER™
THE VIRTUAL ENGINEERTHE VIRTUAL ENGINEERThe Right Information Automatically
Provided at the Right Time!
Process Performance Auditing & Advising Software
Real-time Process Information Management Fundamental Engineering Models-
based Patented-Pending
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 8 –
CONTROL SYSTEM• Flow
• Temperature
• Pressure
• Level
SHOULD
WORK
IS
WORKING
ADVICEOK OR PROBLEMS
Process Design and Operation Information
THE MFG PROCESS
System AuditingPoint Auditing
DIGITAL DASHBOARD
• KPI
• CHARTS
• REPORTS
• EMAILS
How Does FALCONEER™ IV Work? Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 9 –
• WHAT HAPPENED SINCE YESTERDAY?
• CHECK OPERATIONS
•CONTROL ROOM
•SPREADSHEETS
•DCS TOOLS
• PROBLEMS?
•IMMEDIATE ACTION
•ADDITIONAL RESOURCES REQUIRED
•LONGER TERM PLAN
•FORM TEAM
•GATHER INFO
•ANALYZE INFO
•ID CAUSE
•DEVELOP SOLUTIONS
•CREATE PROJECT
• DOCUMENT
•PSM
•ISO
•MOC
•OPERATION NORMAL
•PROJECT WORK
•REPORTS
•MEETINGS
•INTERRUPTIONS
•PROCESS PROBLEMS
•PROCESS OPPORTUNITIES
• IMPLEMENT SOLUTION
•FORM TEAM
•DEVELOP PLAN
•INVESTIGATE
•GATHER INFO
•ANALYZE INFO
•IDENTIFY CAUSE
•DEVELOP SOLUTIONS
•PREPARE FOR TOMORROW
at
Improved Daily Workflow & Information Management Making Plants Smarter,
Safer & More Profitable By Design

Process, Power & MarineREAL BENEFITS!!
Global Industry Benchmarks (BASF, FMC, PPG, Taiwan, India) Prevented unscheduled shutdown
saving >$200,000 per day Improved Power Generation
Revenue >$200,000 per year $30,000 Savings with One Alert on
Steam System Steam Reconciliation Savings of
$50,000 in 6 months Raw Material Savings of >$40,000
per Quarter Energy Savings Opportunities
> $70,000 per Month w/ Natural Gas > $100,000 per year Pumps & Blowers
The real value of right information at the right time!
Making Plants Smarter, Safer & More Profitable By Design
A former Foxboro manager appreciates our approach as: “being rigorous enough to identify the problems without being too complex or expensive, combined with being easy enough to configure and maintain.”
“Compared to other approaches, FALCONEER is more fundamental with easily configurable and understandable equations and logic”, according to FMC

Process, Power & MarineREAL BENEFITS!!
Global Industry Benchmarks (BASF, FMC, PPG, Taiwan, India) Prevented unscheduled shutdown
saving >$200,000 per day Improved Power Generation
Revenue >$200,000 per year $30,000 Savings with One Alert on
Steam System Steam Reconciliation Savings of
$50,000 in 6 months Raw Material Savings of >$40,000
per Quarter Energy Savings Opportunities
> $70,000 per Month w/ Natural Gas > $100,000 per year Pumps & Blowers
Savings per Cost of Production
Low(cents / $)
High(cents / $)
Operating Costs Reduction 0.1 2.0 Maintenance Costs Reduction 0.1 0.5 Improved Efficiencies 0.3 1.0 Addl Product Sales 1.0 2.0 Reduced Energy Usage 0.1 0.5 OVERALL ANNUAL COST SAVINGS POTENTIAL
1.6 6.0
% UNIT COST Improvement 1.6% 6.0%
+ IMPROVED SAFETY+ IMPROVED SAFETY
The real value of right information at the right time!
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
FALCONEER THE FUTURE I S NOW!
FALCONEER IS SAP’S & INTERGRAPH’S DIRECT LINK TO THE PLANT FLOOR AND CONTROL SYSTEM.
Benefits of adding the FALCONEER business package to your SPO Core solution:
PLANT OPTIMIZATION ASSISTANT
ENGINEERING ASSISTANT FOR RELIABILITY
Virtual Engineer Mass & Energy Balance Engine Statistical & Model Based Trending Save Hundreds of Thousands of $$$
Real-time Sensor & Process Validation Soft & Inferential Sensors for Reliability Abnormal Condition & Fault Detection Prevent Downtime, Accidents, Releases
The SmartPlant® Enterprise for Owner Operators (SPO) Operating Plant Solution builds upon the SPO Core Solution and provides business packages such as FALCONEER to support common, critical work processes for the operating plant.

Process, Power & Marine
April 20, 2023 – 13 –
OO Bundle Solution Components
Engineering tasks that made up the solution: SmartPlant P&ID
Rule and asset based intelligent P&ID solution SmartPlant Process Safety
Knowledgebase HAZOP analysis solution SmartPlant Isometrics (formerly I-Sketch)
Specification driven Isometric solutionFALCONEER Process Performance
Validation, Abnormal Condition Detection & Optimization
Functionality Out-of-the-Box capabilities
Flexibility to be configured to meet specific user demands
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 14 –
Design to Operations Business Cases
Add Monitoring System for Compliance Automating HAZOP Process Correcting Equipment PerformanceCorrecting Equipment Performance
Support Systems•PID
•Equipment Spec
•Instrument Specs
•Predictive / Preventive Maintenance
•Simulations
•Excel
•Pilot Study Reports
•SOPS
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 15 –
Intelligent
P&ID’s
Existing
P&ID’s
Implement
Project
Develop Solution
1) Design Modification
2) Process Change
DCS
Historian
Data Consolidation
Specifications
Controls
Piping
Other
Correcting PerformanceEquipment or Process Unit
Underperforming
DCS
HistorianID Problem & Root Cause
Validate
Solution
Engineering Models
Spreadsheets,
Simulations
Maintain & Optimize
Improved or Design Performance
Real-Time Performance
Monitoring & Auditing
Safety
check
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 16 –
Cost savings
Cost of the solution for 3 users $95k (incl. training and few days of consultancy)
ROI with the first year of projects
$113,540 - $95,000= $18,540 plus Cost Avoidance or
Opportunity Cost Savings ranging in the hundreds to thousands of dollars per hour that problem persists unrecognized
Task Today Smart Plant
Problem Analysis & ID 16 $1,600 2 $200
As-built 40 $2,400 10 $600
Safety Check 100 $6,000 40$2,40
0
Process Validation 125 $7,500 35$2,10
0
Update design 80 $4,800 40$2,40
0
Commissioning 24 $1,440 12 $720
Update documentation 25 $1,500 10 $600
Savings $25,240$9,02
0
*based on estimates
Savings $16,220
Workflow cases per year 7 $113,540
ROI – Correcting Performance Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 17 –
Business Case – Correcting Performance
Benefits Virtual Engineer - Analyze process performance Maintain Safe Conditions
Operational Risk Management Abnormal Condition Detection & Reporting Fault & Failure Detection & Reporting Validation of Safety Critical Instrumentation
Provide recommendations to improve output Ensure design consistency Provide consistent P&ID updates Safety checks on the modifications Ensure P&ID, process data, Isometrics and safety are
all consistent and verified.
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 18 –
ROI Recap on 3 Business Cases Automating HAZOP Process 168,000 Add Monitoring System for Compliance $139,500 Correcting Equipment Performance 113,540
Total ROI $421,040
Less Cost 95,000
Total ROI 1st Year of Projects $326,040
Plus Cost Avoidance or Opportunity Cost Savings ranging in the hundreds to thousands of dollars per hour that
problems persist unrecognized
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 19 –
FALCONEER Case Studies
A former Foxboro manager appreciates our approach as “being rigorous enough to identify the problems without being too complex or expensive, combined with being easy enough to configure and maintain.”
Chemical\Petrochemical
•Solid Oxidizer Plant
•EO Plant
•Polymerization Plants
•Incinerators
•Pipelines (Oil & Gas)
•Salt Plant
Water & Waste Water
•Utilities
•Chemicals
•Energy
Power Generation
•Co-Generation
•Boiler Systems
Pulp & Paper
•Pulp Mill
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & MarineCUSTOMER WANTS…
• Process Information (Asset) Management
• Real-Time Smart Link for Process Data to SAP to SP Enterprise to User
• Automated Process Performance Auditing & Advising
• Leveraging Design Information with Process Information
USER
$$$
Making Plants Smarter, Safer & More Profitable By Design
SAP
SmartPlant Enterprise

Process, Power & Marine
April 20, 2023 – 21 –
Smart Plant of the Future - NOW
FALCONEER Business Package Delivers
Smart Link from Control System to SAP & Intergraph Enterprise Mass & Energy Balance Engine for optimizing energy utilization, costs,
production Monitor, Report, Trend key performance indicators (KPI) and metrics in
real time Energy & Raw Material Use & Cost Instrumentation & Equipment Condition Production Capacity & Utilization
Receive proactive notifications of under-performing assets before they impact the bottom line
Capture, retain & use aging workforce knowledge base
REDUCED OPERATIONAL RISKREDUCED OPERATIONAL RISK
ENSURING OPERATIONS PER DESIGN!ENSURING OPERATIONS PER DESIGN!
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 22 –
INTERGRAPH 2008
Presenter: Dr. Doug Lenz
Q & A
Making Plants Smarter, Safer & More Profitable By Design
www.falconeertech.com

Process, Power & Marine
April 20, 2023 – 23 –
FALCONEER Process Performance Solution
Models Are the Key
Material Balances Energy Balances Performance Equations Soft Sensor Models Six Sigma Transfer Functions Heuristics Empirical Equations / Correlations Multivariate Statistical Models PCA Models
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 24 –
Method Of Minimal Evidence Example
Secondary Model (Eliminates Flow1)
SM1 = 0 = Flow2 * cp * (Temp2 – Temp1)
– Flow3 * cp * (Temp3 – Temp1)
Primary Models (Mass and Energy Balances)
PM1 = 0 = Flow1 + Flow2 – Flow3 – Leaks
PM2 = 0 = Flow1 * cp * Temperature1
+ Flow2 * cp * Temperature2
– Flow3 * cp * Temperature3
– Leaks * cp * Temperatures
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 25 –
Virtual Statistical Process Control (V-SPC)FIC672 5
0
5
10
15
20
25
5/30/02 0:00 6/1/02 0:00 6/3/02 0:00 6/5/02 0:00 6/7/02 0:00 6/9/02 0:00 6/11/02 0:00 6/13/02 0:00
TIME
RE
AL
DA
TA
CURR V
EWMA V
LCL
Y_LCL
Y_UCL
UCL
Controlled Process Variable
Virtual EWMA Chart
Flow meter
DIC6034
1.25
1.26
1.27
1.28
1.29
1.3
1.31
1.32
1.33
1.34
1.35
1/4/02 0:00 1/6/02 0:00 1/8/02 0:00 1/10/02 0:00 1/12/02 0:00 1/14/02 0:00 1/16/02 0:00 1/18/02 0:00 1/20/02 0:00
TIME
RE
AL
DA
TA CURR V
EWMA V
LCL
Y_LCL
Y_UCL
UCL
Controlled Process Variable Flow Meter Failure - 12 Hours before TDC Alarm Indication
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
April 20, 2023 – 26 –
Why Can’t our DCS / SCADA do this?
DCS/SCADA monitors individual points only – FALCONEER monitors entire process and interactions between points as well
Patent Pending Method and System Adds “wisdom” or intelligence to the raw information. Automatic model & rule generation for enhanced cross-checking
High Level Auditing & Advising Accounts for ALL Information from Process More than just Individual High/Low Alarm Limits and Trending
Statistical-based and Model-based Trending Real-time Continuous vs. Manual or Scheduled
Proactive and Preemptive versus After-The-Fact WHAT & WHEN & WHY
Certain Functions Possible (SPC, KPI, HART) Requires Significantly More Time, Effort, Long-Term Support to Configure & Maintain Older systems may not even be possible
Making Plants Smarter, Safer & More Profitable By Design

Process, Power & Marine
SmartPlant Process Safety
Ray Howarth
21-22 August 2008
Hilton Opera Hotel
Hanoi, Vietnam