smartplant instrumentation roadmap - spi ltufspi-ltuf.org/20120214/4 roadmap 021412.pdf · roadmap...

44
NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract. © 2012. Intergraph Corporation. All Rights Reserved. SmartPlant Instrumentation Roadmap Process, Power & Marine Division February 2012

Upload: lylien

Post on 26-Apr-2018

247 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

© 2012. Intergraph Corporation. All Rights Reserved.

SmartPlant InstrumentationRoadmap

Process, Power & Marine Division

February 2012

Page 2: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

SPI v.2009 SP3 (Released October 24th 2011)

Lower cost of ownershipHot Fix delivery mechanism automated (Smart Upgrade)More stability and new look and feel of the UI (Tab view, text + icon)Maintain the robustness of the product achieved in v.2009

Productivity/Differentiator/InnovationAutoCAD 2009, 2010 and 2011 supportedAbility to save files from InfoMaker v.12 to support SPI v.2007 and upSupport multiple lines per instrument (with integration with SPP&ID and SP3D)

2

Page 3: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Multiple lines per instrument

Page 4: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Multiple lines per instrument

Page 5: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Multiple lines per instrument

Page 6: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012 6

Marco Expansion

The ability to automatically expand all necessary instruments from simplified P&ID

6

Page 7: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro expansion workflow

Page 8: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Expansion type definition – SP P&ID

Page 9: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Expansion type definition – SP P&ID

The I/P (FY), and the 2 limit switch (ZSC, ZSO) are associated with FIC-155

The I/P (FY), and the 2 limit switch (ZSC, ZSO) are associated with FIC-155

Page 10: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Expansion type definition – SP P&ID

Flow Element (FE)Flow Element (FE)

Page 11: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Expansion type definition – SP P&ID

Macro Flow1 is associated with

“Expansion Type” property

Macro Flow1 is associated with

“Expansion Type” property

Page 12: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro expansion workflow

Page 13: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro definition in SPI

Page 14: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro definition in SPI

Macro NameMacro Name

Page 15: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro definition in SPI

Typical InstrumentsTypical Instruments

Page 16: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro definition in SPI

Drag & DropDrag & Drop

Page 17: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Macro definition in SPI

Page 18: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

To do list in SPI, after retrieve

Page 19: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

To do list in SPI, after retrieve

Expanded instrumentsExpanded instruments

Page 20: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

To do list in SPI, after retrieve

Macro name (same as the “Expansion Type” in SP P&ID)Macro name (same as the “Expansion Type” in SP P&ID)

Page 21: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

To do list in SPI, after retrieve

Page 22: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Domain Explorer, after retrieve

22

Newly created instruments in SPINewly created instruments in SPI

Page 23: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Domain Explorer, after retrieve

23

Page 24: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

SPI v.2009 SP4 (1 of 4)

Add ability to batch print Hook-up drawings based on flexible criteria.enable batch print Hook-up drawings using flexible user definable criteria, so that required Hook-up document packages can be quickly, efficiently and easily prepared

Provide enhanced batch loop duplication mechanism (same as the loop rename functionality)

24

Page 25: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Allow view specs/Calculations/PD from different units in the Domain Explorer

Import utility - create cables with complete structure using reference cable type identification – To have the ability to import a new plant cable to SPI based on the

reference cable name– The mechanism should copy the reference cable from the reference data

and name the cable according to the source (the cable name in the external file)

Consolidated Multi Strip Report- Showing choseable panels, their interconnections and each of their adjacent equipment.

25

SPI v.2009 SP4 Cont. (2 of 4)

Page 26: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Ability to produce specification comparison report between:– Current Vs. All archived specification– Each two archived specification.

26

SPI v.2009 SP4 Cont. (3 of 4)

Page 27: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012 27

SPI v.2009 SP4 Cont. (4 of 4)

Integration

Increase Performance & Memory usage ( Large dataset & batch operations) for publish, retrieve and batch revisions

– Publish of SPI large dataset– Capability to publish instruments from plant level (not only unit)– Improve performance when publishing / retrieve documents– Revise multiple Spec Sheets in SPI in integrated environment – Eliminate the creation of meaningless “update” tasks in the to-do-list

Honeywell DCS bidirectional integration support.

Ability to integrate CHARM configuration.

27

Page 28: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

SPI 2013 Tomorrow

Productivity/Differentiator/Innovation

Supporting Oracle 11Integration enhancements and improvements

– To Do List & General architectureApproving InconsistenciesAdd Ability to Customize, Sort and filtering Data to the To Do List.

Browser Wizard / Query BilderAdd separate access rights to Instrument Index supporting tables

and other more driven by the users and market demands

28

Page 29: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

© 2012. Intergraph Corporation. All Rights Reserved.

SmartPlant Instrumentation

From Smart Query Builder to Innovative Browser module and beyond

Process, Power & Marine Division

February 2012

Page 30: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Objectives

Smart Query Builder (first milestone) - allows users to create instantly any

possible query from SPI

– No need to know the SPI data model

– Simple to use and provide engineering and design context

Replace the needs of Infomaker

Browser module will be able to use the smart query instead of customize

browser

In future plans to expand beyond and be platform to other modules of SPI, as

well for other E&S applications

30

Page 31: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Smart Query Builder - main screen

31

Page 32: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Smart Query Builder - main screen

32

Relationship definition

Page 33: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Smart Query Builder - main screen

33

Relationship definition Item Properties

Page 34: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Smart Query Builder - main screen

34

Relationship definition Item Properties Browser Columns

Page 35: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Preliminary Browser

35

This Browser is for result demonstration only (SPI’s Browser is planned to be dramatically enhanced).

Page 36: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Future User Interface Sketch

36

Page 37: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

© 2012. Intergraph Corporation. All Rights Reserved.

SmartPlant InstrumentationTop TUF Ranked CRs

Process, Power & Marine Division

February 2012

Page 38: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Where to find the ranked CRs?

38

http://www.spi-ltuf.org/

Page 39: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Top 5 CRs

39

Page 40: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Top 5 CRs

40

Scheduled for v.2013 (Planned for Q1, 2013)

Page 41: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

Top 5 CRs

41

Scheduled for v.2013 (Planned for Q1, 2013)

Implemented and released in SPI 2009 SP1.

Page 42: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

6th item from top ranking CR

42

Page 43: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

6th item from top ranking CR

43

The 6th item will be scheduled for v.2013

Page 44: SmartPlant Instrumentation Roadmap - SPI LTUFspi-ltuf.org/20120214/4 RoadMap 021412.pdf · Roadmap Process, Power ... – The mechanism should copy the reference cable from ... interconnections

E&S 2012

NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

© 2012. Intergraph Corporation. All Rights Reserved.

Thank You