NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
© 2012. Intergraph Corporation. All Rights Reserved.
SmartPlant InstrumentationRoadmap
Process, Power & Marine Division
February 2012
E&S 2012
SPI v.2009 SP3 (Released October 24th 2011)
Lower cost of ownershipHot Fix delivery mechanism automated (Smart Upgrade)More stability and new look and feel of the UI (Tab view, text + icon)Maintain the robustness of the product achieved in v.2009
Productivity/Differentiator/InnovationAutoCAD 2009, 2010 and 2011 supportedAbility to save files from InfoMaker v.12 to support SPI v.2007 and upSupport multiple lines per instrument (with integration with SPP&ID and SP3D)
2
E&S 2012
Multiple lines per instrument
E&S 2012
Multiple lines per instrument
E&S 2012
Multiple lines per instrument
E&S 2012 6
Marco Expansion
The ability to automatically expand all necessary instruments from simplified P&ID
6
E&S 2012
Macro expansion workflow
E&S 2012
Expansion type definition – SP P&ID
E&S 2012
Expansion type definition – SP P&ID
The I/P (FY), and the 2 limit switch (ZSC, ZSO) are associated with FIC-155
The I/P (FY), and the 2 limit switch (ZSC, ZSO) are associated with FIC-155
E&S 2012
Expansion type definition – SP P&ID
Flow Element (FE)Flow Element (FE)
E&S 2012
Expansion type definition – SP P&ID
Macro Flow1 is associated with
“Expansion Type” property
Macro Flow1 is associated with
“Expansion Type” property
E&S 2012
Macro expansion workflow
E&S 2012
Macro definition in SPI
E&S 2012
Macro definition in SPI
Macro NameMacro Name
E&S 2012
Macro definition in SPI
Typical InstrumentsTypical Instruments
E&S 2012
Macro definition in SPI
Drag & DropDrag & Drop
E&S 2012
Macro definition in SPI
E&S 2012
To do list in SPI, after retrieve
E&S 2012
To do list in SPI, after retrieve
Expanded instrumentsExpanded instruments
E&S 2012
To do list in SPI, after retrieve
Macro name (same as the “Expansion Type” in SP P&ID)Macro name (same as the “Expansion Type” in SP P&ID)
E&S 2012
To do list in SPI, after retrieve
E&S 2012
Domain Explorer, after retrieve
22
Newly created instruments in SPINewly created instruments in SPI
E&S 2012
Domain Explorer, after retrieve
23
E&S 2012
SPI v.2009 SP4 (1 of 4)
Add ability to batch print Hook-up drawings based on flexible criteria.enable batch print Hook-up drawings using flexible user definable criteria, so that required Hook-up document packages can be quickly, efficiently and easily prepared
Provide enhanced batch loop duplication mechanism (same as the loop rename functionality)
24
E&S 2012
Allow view specs/Calculations/PD from different units in the Domain Explorer
Import utility - create cables with complete structure using reference cable type identification – To have the ability to import a new plant cable to SPI based on the
reference cable name– The mechanism should copy the reference cable from the reference data
and name the cable according to the source (the cable name in the external file)
Consolidated Multi Strip Report- Showing choseable panels, their interconnections and each of their adjacent equipment.
25
SPI v.2009 SP4 Cont. (2 of 4)
E&S 2012
Ability to produce specification comparison report between:– Current Vs. All archived specification– Each two archived specification.
26
SPI v.2009 SP4 Cont. (3 of 4)
E&S 2012 27
SPI v.2009 SP4 Cont. (4 of 4)
Integration
Increase Performance & Memory usage ( Large dataset & batch operations) for publish, retrieve and batch revisions
– Publish of SPI large dataset– Capability to publish instruments from plant level (not only unit)– Improve performance when publishing / retrieve documents– Revise multiple Spec Sheets in SPI in integrated environment – Eliminate the creation of meaningless “update” tasks in the to-do-list
Honeywell DCS bidirectional integration support.
Ability to integrate CHARM configuration.
27
E&S 2012
SPI 2013 Tomorrow
Productivity/Differentiator/Innovation
Supporting Oracle 11Integration enhancements and improvements
– To Do List & General architectureApproving InconsistenciesAdd Ability to Customize, Sort and filtering Data to the To Do List.
Browser Wizard / Query BilderAdd separate access rights to Instrument Index supporting tables
and other more driven by the users and market demands
28
E&S 2012
NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
© 2012. Intergraph Corporation. All Rights Reserved.
SmartPlant Instrumentation
From Smart Query Builder to Innovative Browser module and beyond
Process, Power & Marine Division
February 2012
E&S 2012
Objectives
Smart Query Builder (first milestone) - allows users to create instantly any
possible query from SPI
– No need to know the SPI data model
– Simple to use and provide engineering and design context
Replace the needs of Infomaker
Browser module will be able to use the smart query instead of customize
browser
In future plans to expand beyond and be platform to other modules of SPI, as
well for other E&S applications
30
E&S 2012
Smart Query Builder - main screen
31
E&S 2012
Smart Query Builder - main screen
32
Relationship definition
E&S 2012
Smart Query Builder - main screen
33
Relationship definition Item Properties
E&S 2012
Smart Query Builder - main screen
34
Relationship definition Item Properties Browser Columns
E&S 2012
Preliminary Browser
35
This Browser is for result demonstration only (SPI’s Browser is planned to be dramatically enhanced).
E&S 2012
Future User Interface Sketch
36
E&S 2012
NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.
© 2012. Intergraph Corporation. All Rights Reserved.
SmartPlant InstrumentationTop TUF Ranked CRs
Process, Power & Marine Division
February 2012
E&S 2012
Where to find the ranked CRs?
38
http://www.spi-ltuf.org/
E&S 2012
Top 5 CRs
39
E&S 2012
Top 5 CRs
40
Scheduled for v.2013 (Planned for Q1, 2013)
E&S 2012
Top 5 CRs
41
Scheduled for v.2013 (Planned for Q1, 2013)
Implemented and released in SPI 2009 SP1.
E&S 2012
6th item from top ranking CR
42
E&S 2012
6th item from top ranking CR
43
The 6th item will be scheduled for v.2013
E&S 2012
NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.