Page 1: Smart Infrastructure Solution - TerraCIS Tech...significantly benefitting both old and new Gurgaon. Rapid Metro Phase-1 Project is having 6 station and Operation Control Center and

Smart Infrastructure Solution For

Metro Transport

From

IL&FS Technologies Limited

…Bringing efficiency to servicedelivery

www.ilfstechnologies.com

Page 2: Smart Infrastructure Solution - TerraCIS Tech...significantly benefitting both old and new Gurgaon. Rapid Metro Phase-1 Project is having 6 station and Operation Control Center and

Smart Infrastructure Solution for Transport andUtilities

ITL has designed and proposed a tailored end-to-end Smart ICT solutionsfor transport infrastructure based on robust architecture, high capacitycommunication networks and Intelligent Command Control platform thatare capable of capturing performance data in real time to -

• Refine Operation matrices (through iterative feedback) • Make intelligent decisions (by sharing with operators)• Implement M2M controls (by feeding information into other

systems)

Rapid Metro Communication project is convergence of multipleCommunication and IT Infra layer such as

• Shared Street / Last Mile Infrastructure layer - for Sensors, WiFi , Public Safety , Public Information System , PassengerAnnouncement system

• Integrated Network Infrastructure Layer – High Capacity 10Gnetwork ( Packet+ TDM)

• Unified and location neutral Communication layer - forPassengers , O&M staff , controllers, driver @ train/ station andintegration with DMRC Hotline

• Asset tracking and building management Layer - formonitoring IT ( Server , network) and Non IT Infra ( Power, Fire ,Water level , Energy etc ) on integrated centralized dash board

• Command Control Center in DC/ DR Model - For monitoringsafety of passenger , train operation and infrastructure includingtrack auxiliaries, AFC

• Intelligent SLA and Performance monitoring platform - BI ,Trouble Ticket, SLA history , Trend Analysis , RAMS ( Reliability ,Availability , Maintainability and Safety )

IL&FS Technologies LimitedCorporate Office, 3rd Floor, Ambience Corporate Tower,Ambience Mall, Ambience Island National Highway #8,

Gurgaon - 122 002

Page | 2 of 5

Page 3: Smart Infrastructure Solution - TerraCIS Tech...significantly benefitting both old and new Gurgaon. Rapid Metro Phase-1 Project is having 6 station and Operation Control Center and

Smart Infrastructure Solution for Transport andUtilities

This smart infrastructure solution is under implementation at Rapid MetroRail Gurgaon extending the following benefit

Streamline the operation of the Rapid Metro with help of CentralCommand and Infrastructure management system

Future Safe high Capacity state of art communication network forreal –time monitoring of complete Rapid metro infrastructure andtrain operation

Better experience to Rapid Metro commuters by means ofinformation availability and security at Platforms and in Trains

Enhance overall operational efficiency and monitoring of RapidMetro infrastructure including station building , by removingredundancy and duplication of work efforts from the system.

Enforcement of Transparency and accountability in the overalloperation of rapid metro system.

Project Overview

Rapid Metro Rail Gurgaon Limited (RMGL), a special purpose vehicle(SPV) was formed, India’s first fully privately financed metro:

A network of 5.1 km connecting Cyber City, NH-8 & Sikanderpur station(DMRC) in Ph-I

IL&FS Technologies LimitedCorporate Office, 3rd Floor, Ambience Corporate Tower,Ambience Mall, Ambience Island National Highway #8,

Gurgaon - 122 002

Page | 3 of 5

Page 4: Smart Infrastructure Solution - TerraCIS Tech...significantly benefitting both old and new Gurgaon. Rapid Metro Phase-1 Project is having 6 station and Operation Control Center and

Smart Infrastructure Solution for Transport andUtilities

A network of 7 km along Golf Course Road connecting Sector 55-56 toDelhi Metro at Sikanderpur in Phase II

An extension towards Udyog Vihar in north is proposed which willfinally make the length of system almost 20 km

With the advent of Rapid Metro, commuters will get a welcome relief fromthe traffic woes, connecting them to the NH-8, Gurgaon & Delhi. Theexpansion of the system would enhance traffic on the current alignmentsignificantly benefitting both old and new Gurgaon.

Rapid Metro Phase-1 Project is having 6 station and Operation ControlCenter and Phase-2 project will have a route length of about 7km with 5stations namely - DLF Phase-1, Sushant Lok, Sector 53-54, AIT Chowk andSector 55-56 (terminal station). Stabling and maintenance depot will belocated in the vicinity of AIT Chowk. A Disaster Recovery Control Center isplanned as Backup Control Centre (BCC) at Depot. The OCC will continueto be located at Moulsari Avenue .

The Project, envisages a seamless operation and to provide the necessaryreal time information and intelligence to the decision makers at all levelswhile integrating all stations depots and command center.

IL& FS Technologies Limited has implemented a complete IntegratedCommunication and Telecom (ICT) infrastructure, comprising of supply ofhardware, software, configuration, deployment/ installation,commissioning of telecom, surveillance, security system of Phase-2project and integration with phase-1 project consisting of following subsystem

High Capacity Packet & Data Transmission System Clock System Voice Telephone System Closed Circuit Television (CCTV) System Public Address System (PAS) Mobile Radio Communication System Infrastructure and Building Management System Passenger Information System (PIS) Train borne Communication (TBC) System Office Automation (OA) and Information Technology (IT) System UPS and Battery Backup System;

IL&FS Technologies LimitedCorporate Office, 3rd Floor, Ambience Corporate Tower,Ambience Mall, Ambience Island National Highway #8,

Gurgaon - 122 002

Page | 4 of 5

Page 5: Smart Infrastructure Solution - TerraCIS Tech...significantly benefitting both old and new Gurgaon. Rapid Metro Phase-1 Project is having 6 station and Operation Control Center and

Smart Infrastructure Solution for Transport andUtilities

Access Control System Operation Control Centre (OCC) and Backup Control Centre ( BCC)

setup

ITL adopt a Phased manner Design and Implementation methodology fora Turnkey project based on milestones to ensure Easy ProjectManageability, Smooth implementation and Successful Project Completion