SMART GRIDSMART GRIDSMART GRIDSMART GRID
ASASASAS
EGATEGATEGATEGAT’’’’ssss New ChallengeNew ChallengeNew ChallengeNew Challenge
PatanaPatanaPatanaPatana SangsriroujanaSangsriroujanaSangsriroujanaSangsriroujana
EGAT EGAT EGAT EGAT ‘‘‘‘s Smart Grid WG Members Smart Grid WG Members Smart Grid WG Members Smart Grid WG Member
Electricity Generating Authority of ThailandElectricity Generating Authority of ThailandElectricity Generating Authority of ThailandElectricity Generating Authority of Thailand
AORCAORCAORCAORC----CIGRE Technical MeetingCIGRE Technical MeetingCIGRE Technical MeetingCIGRE Technical Meeting
26 October 2011 26 October 2011 26 October 2011 26 October 2011
Chiang Mai, ThailandChiang Mai, ThailandChiang Mai, ThailandChiang Mai, Thailand
2
Outline :Outline :Outline :Outline :
Global TopicGlobal TopicGlobal TopicGlobal Topic
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
How EGAT ConcernHow EGAT ConcernHow EGAT ConcernHow EGAT Concern
ConclusionConclusionConclusionConclusion
3
Global TopicGlobal TopicGlobal TopicGlobal Topic
Environmental ImpactEnvironmental ImpactEnvironmental ImpactEnvironmental Impact
CO2 Reduction
Improve Performance of Power SectorImprove Performance of Power SectorImprove Performance of Power SectorImprove Performance of Power Sector
Solution : Solution : Solution : Solution : SSSSSSSSmart mart mart mart GGGGGGGGridridridrid
4
Global TopicGlobal TopicGlobal TopicGlobal Topic
Smart Grid ConceptSmart Grid ConceptSmart Grid ConceptSmart Grid Concept
Increase Renewable EnergyIncrease Renewable EnergyIncrease Renewable EnergyIncrease Renewable Energy
Wind , Solar , etc : Micro GridWind , Solar , etc : Micro GridWind , Solar , etc : Micro GridWind , Solar , etc : Micro Grid
Improve Energy EfficiencyImprove Energy EfficiencyImprove Energy EfficiencyImprove Energy Efficiency
TOU,RTP : Peak Cut/Shift, TOU,RTP : Peak Cut/Shift, TOU,RTP : Peak Cut/Shift, TOU,RTP : Peak Cut/Shift,
Reserve MarginReserve MarginReserve MarginReserve Margin
5
Outline :Outline :Outline :Outline :
Global TopicGlobal TopicGlobal TopicGlobal Topic
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
How EGAT ConcernHow EGAT ConcernHow EGAT ConcernHow EGAT Concern
ConclusionConclusionConclusionConclusion
Combine CycleCombine Cycle
16,714.0 MW 16,714.0 MW
57.2%57.2%
Thermal Thermal
7,999.6 MW7,999.6 MW
27.4%27.4%
Hydro Hydro
3,424.2 MW3,424.2 MW
11.7%11.7%
RenewableRenewable
309.8 MW309.8 MW
1.1%1.1%
Gas Gas Turbine&DieselTurbine&Diesel
124.4 MW 124.4 MW
0.4%0.4%TNB (HVDC) TNB (HVDC)
300 MW 300 MW
1.0%1.0%
LaosLaos
340 MW 340 MW
1.2%1.2%
Total Net CapacityTotal Net Capacity
(As of May 2010)
29,212 29,212 MWMW
Peak DemandPeak Demand
(May 10, 2010)
24,009.924,009.9 MWMW
Natural Gas71.77 %
Diesel 0.03%
EGAT-TNB0.15 %
Lao PDR 1.6%
Hydro 4.8%
Lignite 11.6%
Heavy Oil 0.4%
Imported Coal 8.2%
Renewable 1.45%
Energy Generation of Year 2010Energy Generation of Year 2010
160160,,113 113 GWhGWh
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
7
Policy According toPolicy According toPolicy According toPolicy According to
Power Development Plan (PDP) 2010Power Development Plan (PDP) 2010Power Development Plan (PDP) 2010Power Development Plan (PDP) 2010
(as of 2030)(as of 2030)(as of 2030)(as of 2030)
RenewableRenewableRenewableRenewable = 6% of Total Generation
=> 10%=> 10%=> 10%=> 10%
NuclearNuclearNuclearNuclear = 11%
=> 3 Years Delay=> 3 Years Delay=> 3 Years Delay=> 3 Years Delay
Decentralize EnergyDecentralize EnergyDecentralize EnergyDecentralize Energy
CEF CEF CEF CEF = 0.5 to < 0.3 kg/kWh
CEF = Carbon Emission Factor
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
8
Generating Capacity of RenewableGenerating Capacity of RenewableGenerating Capacity of RenewableGenerating Capacity of Renewable
(15 Year Alternative Energy Development Plan)(15 Year Alternative Energy Development Plan)(15 Year Alternative Energy Development Plan)(15 Year Alternative Energy Development Plan)
• SAIFI 0.230 0.296 Occ./ Delivery Point
• SAIDI 10.061 7.244 Min./ Delivery Point
• System Minute 2.889 2.505 (MW-Min)/ MW
9
Actual/Expected Values Year 2010
Actual Expected
Expected Values Year 2011
Expected
• SAIFI 0.283 Occ./ Delivery Point
• SAIDI 8.315 Min./ Delivery Point
• System Minute 2.642 (MW-Min)/ MW
10
Outline :Outline :Outline :Outline :
Global TopicGlobal TopicGlobal TopicGlobal Topic
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
How EGAT ConcernHow EGAT ConcernHow EGAT ConcernHow EGAT Concern
ConclusionConclusionConclusionConclusion
11
How EGAT ConcernHow EGAT ConcernHow EGAT ConcernHow EGAT Concern
Set up Working GroupSet up Working GroupSet up Working GroupSet up Working Group
EGAT Smart Grid ModelEGAT Smart Grid ModelEGAT Smart Grid ModelEGAT Smart Grid Model
Recommended Strategy/RoadmapRecommended Strategy/RoadmapRecommended Strategy/RoadmapRecommended Strategy/Roadmap
Plan & Project Under ConsiderationPlan & Project Under ConsiderationPlan & Project Under ConsiderationPlan & Project Under Consideration
GEN /TRANS DISTR CUST
Reliability
Quality
Efficiency
Security
DSM
“GHG Emission Reduction ”
Power Grid Smart Grid
SSM OSM
GOV/REG EGAT/MEA/PEA USERS
2553 25xx2512
Technology Provider
How to Create the Solutions through the1.Value ChainGeneration>Transmission>Substation>Contro l Center>>>2.In the Area 1.Operation and Control2.Maitenance3.Admin istration3.By 1.Moni toring2.Contro lled3.Automated4.In tegrated
“EGAT Smarter Model”
Strong Grid
How to prepare and develop the Solut ions through the Thailand ESI Smart
energy
power system
serv ice
managem ent
EGAT Smart Grid WG ModelEGAT Smart Grid WG Model
13
SGSGSGSG----WG Recommended StrategyWG Recommended StrategyWG Recommended StrategyWG Recommended Strategy
1) Built EGAT to be SMARTER1) Built EGAT to be SMARTER1) Built EGAT to be SMARTER1) Built EGAT to be SMARTERHow Smart ?How Smart ?How Smart ?How Smart ?
Intelligence Device & ApplicationIntelligence Device & ApplicationIntelligence Device & ApplicationIntelligence Device & Application
Monitor, Control, Automate, IntegratedMonitor, Control, Automate, IntegratedMonitor, Control, Automate, IntegratedMonitor, Control, Automate, Integrated
ICT as Infrastructure Foundation ICT as Infrastructure Foundation ICT as Infrastructure Foundation ICT as Infrastructure Foundation
To support Planning and OperationTo support Planning and OperationTo support Planning and OperationTo support Planning and Operation
2) Collaboration 2) Collaboration 2) Collaboration 2) Collaboration Ready and Willing to Collaborate THAI ESIReady and Willing to Collaborate THAI ESIReady and Willing to Collaborate THAI ESIReady and Willing to Collaborate THAI ESI
To NATo NATo NATo NATIONAL TIONAL TIONAL TIONAL SMART GRIDSMART GRIDSMART GRIDSMART GRID
2512 2553 25xx
Existing WorkSCADA Remote hydro control Center CCS/MC/GCC SPS TPS AMR Tele metering LFL/C e-application others
Existing WorkSCADA Remote hydro control Center CCS/MC/GCC SPS TPS AMR Tele metering LFL/C e-application others
Continuous Improvement Plan
Existing Work
Continuous Improvement Plan
Existing Work
New Developing Plan1.New Substation under IEC61850 2.OM&A by ICT Technology
New Developing Plan1.New Substation under IEC61850 2.OM&A by ICT Technology
External Collaboration1.Set up WG (All Stake Holders)2.Consideration
- HC study ,Impact from RES - PPA for RES
3. Energy Efficiency via DSM- Multi Tariffs- DLC- RTP
External Collaboration1.Set up WG (All Stake Holders)2.Consideration
- HC study ,Impact from RES - PPA for RES
3. Energy Efficiency via DSM- Multi Tariffs- DLC- RTP
go to
EGAT
to be Smarter
“National SG”
Agenda
Developing process
New Business Plan
ST(1-2Y) MT(3-5Y) LT plan(+ /-10Y)
2 Collaboration comprise of 5 Projects
4 Major Planscomprise of 17 Projects
EGAT Smart Grid WG RoadmapEGAT Smart Grid WG Roadmap
15
Suggestion PlansSuggestion PlansSuggestion PlansSuggestion Plans
Replacement Replacement Replacement Replacement
Transmission System EquipmentTransmission System EquipmentTransmission System EquipmentTransmission System Equipment
Development and ImprovementDevelopment and ImprovementDevelopment and ImprovementDevelopment and Improvement
ToToToTo be more be more be more be more IntelligenceIntelligenceIntelligenceIntelligence
Preparation and Collaboration Preparation and Collaboration Preparation and Collaboration Preparation and Collaboration
All StakeholderAll StakeholderAll StakeholderAll Stakeholder
16
(Project under consideration)Supply Side : Impact from RES
NCC & RCC Performance Improvement
(����ก��������� ����������ก���������)
Wide Area Monitoring System(WAMS)
(���..����ก�� Phase Monitoring System)
17
(Project under consideration)Supply Side : Impact from RES
R&DR&DR&DR&D
1) Forecast (Wind & Solar)1) Forecast (Wind & Solar)1) Forecast (Wind & Solar)1) Forecast (Wind & Solar)
2) Hosting Capacity2) Hosting Capacity2) Hosting Capacity2) Hosting Capacity
18
(Project under consideration)Operating Management System
1) Maintenance Center 1) Maintenance Center 1) Maintenance Center 1) Maintenance Center
Intelligence Device with ICT
2) 2) 2) 2) TranmissionTranmissionTranmissionTranmission Sys Sys Sys Sys EqEqEqEq. Replacement . Replacement . Replacement . Replacement
CBM , Risk Manage. , Financial Analysis
3) Value added ICT3) Value added ICT3) Value added ICT3) Value added ICT
19
(Project under consideration)Demand Side : Corporate with MOE , Regulator …
1) Study for Power Purchasing Agreement and Grid.. Code Revision1) Study for Power Purchasing Agreement and Grid.. Code Revision1) Study for Power Purchasing Agreement and Grid.. Code Revision1) Study for Power Purchasing Agreement and Grid.. Code Revision
Law & Regulation
20
(Project under consideration)Demand Side : Propose Inter-Corporate Issue
Corporate with Distribution Utility (MEA & PEA)
2) 2) 2) 2) Upgrade InterUpgrade InterUpgrade InterUpgrade Inter----Information Standard btw Corporate Control CenterInformation Standard btw Corporate Control CenterInformation Standard btw Corporate Control CenterInformation Standard btw Corporate Control Center
Information Standard
ICT Standard
1) 1) 1) 1) Special Protection SchemeSpecial Protection SchemeSpecial Protection SchemeSpecial Protection Scheme
(SPS)
… Impact from
Renewable Energy Source Renewable Energy Source Renewable Energy Source Renewable Energy Source
21
(Project under consideration)Demand Side : Propose Inter-Corporate Issue
Corporate with Distribution Utility (MEA & PEA),DEDE
Green Electricity Province (Mea Hong Green Electricity Province (Mea Hong Green Electricity Province (Mea Hong Green Electricity Province (Mea Hong SornSornSornSorn Model)Model)Model)Model)
Supply Side Supply Side Supply Side Supply Side : Mini Hydro (Run-off River)
Operating Side Operating Side Operating Side Operating Side : Micro Grid Demand Side Demand Side Demand Side Demand Side : Consumer Participation
22
Outline :Outline :Outline :Outline :
Global TopicGlobal TopicGlobal TopicGlobal Topic
Power Sector in ThailandPower Sector in ThailandPower Sector in ThailandPower Sector in Thailand
How EGAT ConcernHow EGAT ConcernHow EGAT ConcernHow EGAT Concern
ConclusionConclusionConclusionConclusion
23
Key Success FactorKey Success FactorKey Success FactorKey Success Factor
Supply SideSupply SideSupply SideSupply SideRenewable TechnologyRenewable TechnologyRenewable TechnologyRenewable Technology
Wind, Solar, Energy StorageWind, Solar, Energy StorageWind, Solar, Energy StorageWind, Solar, Energy Storage
Operating System SideOperating System SideOperating System SideOperating System SideMicro Grid, Micro Grid, Micro Grid, Micro Grid, ReacReacReacReac ----> > > > ProacProacProacProac
Demand SideDemand SideDemand SideDemand SideConsumer ParticipationConsumer ParticipationConsumer ParticipationConsumer Participation
ProsumerProsumerProsumerProsumer, EV Management , EV Management , EV Management , EV Management
24
ConclusionConclusionConclusionConclusionSmart GridSmart GridSmart GridSmart Grid
Our EGAT DirectionOur EGAT DirectionOur EGAT DirectionOur EGAT Direction
---- Continuous Improvement and Continuous Improvement and Continuous Improvement and Continuous Improvement and
---- Create the Value Added on ICTCreate the Value Added on ICTCreate the Value Added on ICTCreate the Value Added on ICT
Ext Collaboration and Integration Ext Collaboration and Integration Ext Collaboration and Integration Ext Collaboration and Integration
all as all as all as all as ““““OneOneOneOne””””
to be NATIONAL SG to be NATIONAL SG to be NATIONAL SG to be NATIONAL SG Agenda Agenda Agenda Agenda
Supply Side SolutionSupply Side Solution Operation System Mgt.Operation System Mgt. Demand Side SolutionDemand Side Solution
Generation Transmission and Control Center Value Chain1.Operation Maintenance and Administrative Area•Continuous Improvement Plan•Replacement•Development & Improvement•Collaboration2.Grid Efficiency Improvement• Up KV Rate and Increasing No. of Circuits•Replacement ACSR to Super Conductor
Generation Transmission and Control Center Value Chain1.Operation Maintenance and Administrative Area•Continuous Improvement Plan•Replacement•Development & Improvement•Collaboration2.Grid Efficiency Improvement• Up KV Rate and Increasing No. of Circuits•Replacement ACSR to Super Conductor
PDP2010…+1.Decarbonized Generation •Nuclear Generator (11%)•Clean Coal Technology (21%)•Energy Storage, Battery2.Renewable Energy (10%)•Solar with storage•Wind •Heat (Geo-Thermal)•Bio fuels •Mini, Micro-Hydro 3.Generator Efficiency Improvement 4.Re Forestry Project
PDP2010…+1.Decarbonized Generation •Nuclear Generator (11%)•Clean Coal Technology (21%)•Energy Storage, Battery2.Renewable Energy (10%)•Solar with storage•Wind •Heat (Geo-Thermal)•Bio fuels •Mini, Micro-Hydro 3.Generator Efficiency Improvement 4.Re Forestry Project
Energy Conservationand Energy Efficiency1.Single Tariff>>TOU>>RTP2.High Efficiency Devices (No.5) ex. Fluorescent lampLED Appliance …..others
3.Energy saving ,awarenessand behavior change4.Electric Transportation5.Human Resource Knowledge Preparation
Energy Conservationand Energy Efficiency1.Single Tariff>>TOU>>RTP2.High Efficiency Devices (No.5) ex. Fluorescent lampLED Appliance …..others
3.Energy saving ,awarenessand behavior change4.Electric Transportation5.Human Resource Knowledge Preparation
National Electricity Management Direction >> CO2 Em ission ReductionNational Electricity Management Direction >> CO2 Em ission ReducNational Electricity Management Direction >> CO2 Em ission Reduc tiontion
ConclusionConclusionConclusionConclusion