Page 1: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Slovak Environmental Slovak Environmental InspectorateInspectorate

Procedure of issuing the permits in the Slovak Republic

Page 2: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Legal norms   

Act No. 245/2003 Coll. on integrated pollution prevention and control and on changes and amendments to some

Laws

 Ordinance of the Ministry of

Environment (MoE) SR No. 391/2003 Coll., as a guideline for execution of

the IPPC Law

Page 3: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

SEI - Slovak Environmental Inspectorate

Head office - deals with appeals

Environmental Inspectorates on regional level - deal with permitting procedures

 

Page 4: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Head Office Bratislava

EI Košice

EI Bratislava EI

Banská BystricaEI

Žilina

Page 5: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

SEI

Integrated Permit and Control Unit

established on

1. 8. 2003

Page 6: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Integrated permit procedure comprises procedures in the areas of:

• air protection• surface and underground waters • wastes• protection of agricultural land • protection of forest land • human health protection• veterinary protection of a territory• protection of nature and landscape

Page 7: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

One part of integrated permit procedure

building permit procedure

Page 8: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Integrated permit procedure concerns:

• change of the installation character

• change in the operation of an installation

• extension of an installation

Page 9: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Integrated permit procedure

does not include

• territory planning procedure

• Environmental Impact Assessment (EIA)

• Setting conditions for prevention of serious industrial accidents (SEVESO II)

Page 10: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Characteristics of the installations according to the IPPC Law

• existing installation – an installation for which the building permit application was submitted before 30 October 1999 and it started operating by 30 October 2000

• new installation – an installation which is not an existing installation (the installation put into operation after 30 October 2000)

Page 11: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Issuing an integrated permit - deadlines

• new installations – must have the integrated permit issued by the date of the SR accession to EU, i.e. by 30 April 2004

• existing installations – must have the integrated permit issued by 8 years from the IPPC Directive taking effect at the latest, that is by 30. 10. 2007

Page 12: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Numbers of installations for which it is necessary to issue the integrated

permits

BA BB ZA KE

New installations

16 5 6 7 34

Existing installations 174 131 93 107 505

190 136 99 114 539

Page 13: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Division of installations according to their activities

020406080

100120140160

poč

et p

revá

dzo

k

1 2 3 4 5 6kategória priemyselnej činnosti

Nové prevádzky Jestvujúce prevádzky

Page 14: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Permit procedure

- call for an operator to file the application

- consultation or preliminary hearing re. the preparing application

- start of the proceedings – at the delivery of the application

Page 15: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

SEI must do the following • assess if the application is complete• establishes the parties to the proceedings and

the relevant authorities • notifies the parties to the proceedings and the

relevant authorities about the launch of the proceeding

• delivers a brief summary of the application to the municipality and the relevant authorities and other parties to the proceedings

• asks the municipality to publish the information and the call on its official notice board or in any other way used locally

Page 16: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Oral proceedings

concerns

• the application

• comments and suggestions of the invited persons

• the minutes of the public meeting of the municipality citizens if there was one

Page 17: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Integrated permitcontains

• details of the measures and technical equipment for air, water and soil protection

• emission limits for substances emitted from the installation

• measures to prevent pollution, mainly by using BATs

• measures to prevent production of waste

• conditions for energy management

• measures to prevent accidents and limit the effects of the accidents mainly in case of launching the installations into operation, failure of technical facilities, short-time interruption of the activity etc.

•requirements for trial operation

Page 18: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Exceptions for the operation

in order to carry out changes in the installation through which the compliance with the permit conditions is

achieved,

or to terminate the activity in the installation

time limited to

• 6 months from the validity of the permit

• until 30 October 2007

Page 19: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

Written permit is delivered to

• parties to the proceedings

• relevant authorities

• involved persons

• foreign competent authority

Published

• on the WWW site of SEI and official notice board

• in the municipality concerned

Page 20: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic

What is ahead of us

• to arrange for personnel and equipment in all regional inspectorates

• to build a BAT centre

• to build an Information system

• training of inspectorss, ... and operators

• awareness campaign for public

Page 21: Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic