Page 1: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010
Page 2: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Slop StabilizationPertemuan 8 - 10

Mata kuliah : S0892 – Ground Improvement MethodTahun : 2010

Page 3: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

COURSE 3

Content:• Problems On slope• Stabilization Methods:

– Soil Nailing– Retaining Wall– Reinforcement

Page 4: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

PROBLEMS ON SLOPE

Page 5: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SLOPE FAILURE

Page 6: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE

• ROTATIONAL

Page 7: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE• TRANSLATIONAL

Page 8: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE

• FALLING

Page 9: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE

• BLOCK SLIDE

Page 10: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE

• TOPPLE

Page 11: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

FAILURE TYPE

• FLOW

Page 12: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

PROBLEMS ON SLOPE

Page 13: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

STABILIZATION METHODS

Page 14: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

STABILIZATION METHODS• SOIL NAILING

Page 15: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILINGDEFINITION

• Soil nailing is a technique in which soil slopes, excavations or retaining walls are reinforced by the insertion of relatively slender elements - normally steel reinforcing bars.

• The bars are usually installed into a pre-drilled hole and then grouted into place or drilled and grouted simultaneously.

• They are usually installed untensioned at a slight downward inclination. A rigid or flexible facing (often pneumatically applied concrete otherwise known as shotcrete) or isolated soil nail heads may be used at the surface.

Page 16: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 17: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILINGBASIC PRINCIPLE

• The basic concept of soil nailing is to reinforce and strengthen the existing ground by installing closely spaced steel bars, called "nails," into a slope or excavation as construction proceeds from the "top down."

• This process creates a reinforced section that is itself stable and able to retain the ground behind it. The reinforcements are passive and develop their reinforcing action through nail ground interactions as the ground deforms both during and following construction.

• Nails work predominantly in tension, but are considered by some to also work in bending/shear under certain circumstances.

• Generally, the soil nails significantly increase the apparent cohesion of the soil through their ability to carry tensile loads.

• A construction facing is also usually required, and is typically shotcrete reinforced by welded wire mesh. For permanent walls, the shotcrete construction facing is typically covered in cast-in-place concrete facing.

Page 18: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 19: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 20: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 21: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING• Nails work predominantly in tension but may develop bending/shear in certain circumstances. The effect of

the nail reinforcement is to improve stability by (a) increasing the normal force and hence the soil shear resistance along potential slip surfaces in frictional soils; and (b) reducing the driving force along potential slip surfaces in both frictional and cohesive soils. A construction facing is also usually required and is typically shotcrete

reinforced by welded wire mesh. • The steel nail bars are typically 20 to 35 mm in diameter, with a yield strength in the range of 420 to 500

N/mm2, and are typically installed into drillholes having diameters in the range of 100 mm to 300 mm and at a spacing between 1 and 2 meters.

• The nail lengths are typically 70 to 100 percent of the wall height. • Nail inclinations are generally on the order of 15 degrees below horizontal to facilitate grouting.• Soil nails typically consist of steel reinforcement inclusions and may be categorized on the basis of their

method of installation and degree of corrosion protection. For conventional drill and grout nail installations, the nail grout consists typically of a neat cement grout with a watercement ratio of about 0.4 to 0.5. Where a stiffer consistency grout is required (e.g., to centralize the nail when no centralizers are used in a hollow stem auger installation or to control leakage of grout into the ground such as in highly permeable granular soils or highly fractured rock),

• a lower slump sand-cement grout may be used. Sand-cement grout may also be used in conjunction with large nail holes for economic reasons.

Page 22: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 23: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING

Page 24: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 25: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 26: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 27: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 28: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 29: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 30: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

SOIL NAILING – CONSTRUCTION

Page 31: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

A retaining wall is a structure that holds back soil or rock from a building, structure or area. Retaining walls prevent downslope movement or erosion and provide support for vertical or near-vertical grade changes

Page 32: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

11

2 2

3 31

1

2 2

3 3

PA

PA

PA

PA

PPPP

PPPP

S

S

S

Stoe

toe

toe

toeR

R

R

Ryy

yy

Safety against sliding along the base

tan }.{

A

iPsliding P

WPF

HH

hh

soil-concrete friction angle 0.5 – 0.7 soil-concrete friction angle 0.5 – 0.7

to be greater than 1.5

to be greater than 1.5

PP= 0.5 KPh2PP= 0.5 KPh2 PA= 0.5 KAH2PA= 0.5 KAH2

Page 33: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

11

2 2

3 31

1

2 2

3 3

PA

PA

PA

PA

PPPP

PPPP

S

S

S

Stoe

toe

toe

toeR

R

R

Ryy

yy

Safety against overturning about toe

H/3

}{3/

A

iiPgoverturnin P

xWhPF

HH

hh

to be greater than 2.0

to be greater than 2.0

Page 34: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

Page 35: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

Page 36: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

Page 37: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

Page 38: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

RETAINING WALLS

Page 39: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

Page 40: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

Page 41: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

45 0+ /2

H

LR LE

Lo

Sv

z

Page 42: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

Page 43: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

Page 44: Slop Stabilization Pertemuan 8 - 10 Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010

Bina Nusantara

REINFORCEMENT

OVERTURNING STABILITY, FS 2 SLIDING STABILITY, FS 1.5

BEARING CAPACITY STABILITY,

FS 3