10/9/2014 1 1 Title 24 NonRes Certification Process Rick Miller, PE, LC, LEED AP, CLCATT President, RNM Engineering, Inc. Wed, Oct 1, 2014 SLO GB Alliance Just to Make Sure 2 Effective July 1, 2014

Upload: others

Post on 24-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

1

1

Title 24 Non‐Res CertificationProcess

Rick Miller, PE, LC, LEED AP, CLCATT President,  RNM Engineering, Inc.

Wed,  Oct 1, 2014

SLO GB Alliance

Just to Make Sure

2

Effective July 1, 2014

Page 2: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

2

Course Description

You know about the allowable watts for lighting and about the required controls for lighting, now learn about the required paperwork!  Yes, Title 24 requires paperwork and lots of it.   “Passing grades” are required by the designer, commissioning agent, manufacturers and vendors, installing contractor, and acceptance testing technician.

Any failures means no Occupancy Certificate.

3

Learning Objectives

• Learn about the quantity of required Certificates.

• Review the Certificates required of the Designer, CxA, Installer and Tester.

• Clarify the Commissioning Process.

• Examine the requirements for Manufacturers, Suppliers and Builders.

4

Page 3: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

3

Title 24 Part 6 Covers

• Building Energy Efficiency Standards

– Covers the technical requirements for Envelope, Fenestration (Windows), HVAC, Appliances, Water Heaters, Boilers, Roofing, Insulation, Air Leakage, Pools & Spas, Lighting Power, Lighting Controls, and Electrical Distribution, and related paperwork. 

• This seminar is about the required Certificates,

5

Title 24 Part 6 Covers

• Building Energy Efficiency Standards

– Covers the technical requirements for Envelope, Fenestration (Windows), HVAC, Appliances, Water Heaters, Boilers, Roofing, Insulation, Air Leakage, Pools & Spas, Lighting Power, Lighting Controls, and Electrical Distribution, and related paperwork. 

• This seminar is about the required Certificates, 

i.e. the Paperwork.

6

Page 4: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

4

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• Certificate of Compliance  (CC) & (CC‐CXR)• Application for a Building Permit• Certificate of Installation  (CI)• Certificate of Acceptance  (CA)• Certificate of Verification  (CV) [for homes]• Information to be provided by Builder• Information to be provided by Manufacturer or Supplier

• Enforcement Agency Requirements

7

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• CC Forms by Designer (C10, C20 Contractor if less than 50,000 SF) or Design Engineer (PE) 

• CC‐CXR Forms by Commissioning Engineer.

• CI Forms by person in charge of Construction or Installation.

• CA Forms by CLCATT or CMATT.

• CV Forms by HERS Rater.

• Equipment Info by Manufacturer and Supplies.

• O&M Manual by Builder.

8

Page 5: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

5

The JourneyThe Beginning – .   .   .   .

9

OWNER

The JourneyThe Beginning – The Goal

10

OWNER

Certificate ofOccupancy

Page 6: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

6

The JourneyMany Parties Along the Way

11

OWNER

Cx Agent

INSTALLER

DESIGNER PLANS EXAMINER

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

The Journey1. Owner

12

OWNEROPR

Cx Agent

INSTALLER

DESIGNER PLANS EXAMINER

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

Page 7: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

7

Owner Project Requirements (OPR)

This document shall include the following:

1. Energy efficiency goals;

2. Ventilation requirements;

3. Project program, including facility functions and hours of operation, and need for after hours operation; and

4. Equipment and systems expectations.

Sec 120.8(b)

13

The Journey2. Designer

14

OWNEROPR

Cx Agent

INSTALLER

DESIGNERBODCC forms

PLANS EXAMINER

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

Page 8: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

8

Basis of Design (BOD)

The BOD shall cover the following systems:

1. Heating, ventilation, air conditioning (HVAC) systems and controls.

2. Indoor & outdoor lighting system and controls.

3. Water heating systems and controls.

4. Covered processes.

Sec 120.8(c)

15

Forms to be completed by Design Architect

1. NRCC‐ENV‐01‐E (4+4)Envelope Component Approach

2. NRCC‐ENV‐02‐E (3+3)Fenestration Worksheet

3. NRCC‐ENV‐03‐E (2+1)CoolRoof and SRI Worksheet

4. NRCC‐ENV‐04‐E (2+1)Daylit Zone

5. NRCC‐ENV‐05‐E (2+1)Fenestration Certificate Label

6. NRCC‐ENV‐06‐E (2+1) Area Weighted Average Calculation

7. NRCC‐SRA‐01‐E (2) Solar Ready Areas

8. NRCC‐SRA‐02‐E (3) Minimum Solar Zone Area

9. NRCC‐STH‐01‐E (2+2)Solar Water Heating

16

# of pages of forms

# of pages of instructions

Page 9: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

9

Forms to be completed by Electrical Design Engineer

1. NRCC‐ELC‐01‐E (9) Electrical Power Distribution

2. NRCC‐LTI‐01‐E (5) Field Inspection Checklist

3. NRCC‐LTI‐02‐E  (3) Lighting Controls Credit Worksheet

4. NRCC‐LTI‐03‐E  (4) Indoor Lighting Power Allowance

5. NRCC‐LTI‐04‐E  (7) Tailored Method Worksheet

6. NRCC‐LTI‐05‐E  (2) Line Voltage Track Lighting Worksheet

7. NRCC‐LTO‐01‐E  (3) Outdoor Lighting

8. NRCC‐LTO‐02‐E  (3) Outdoor Lighting Controls

9. NRCC‐LTO‐03‐E  (4) Outdoor Lighting Power Allowance

10.NRCC‐LTS‐01‐E  (4) Sign Lighting

17

Forms to be completed by Mechanical Design Engineer

1. NRCC‐MCH‐01‐E (3) Declarations

2. NRCC‐MCH‐02‐E (3) Dry System and Wet System

3. NRCC‐MCH‐03‐E (2) Mechanical Ventilation and Reheat

4. NRCC‐MCH‐04‐E  (3) Declarations ‐ Single Zone Systems

5. NRCC‐MCH‐05‐E  (2) Requirements ‐ Single Zone Systems

6. NRCC‐MCH‐06‐E  (1+1)Maximum Cycles of Concentration

18

Page 10: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

10

Forms to be completed by Process Design Engineer

1. NRCC‐PLB‐01‐E (3+1)Water Heating Systems

2. NRCC‐PRC‐01‐E (3) Covered Process

3. NRCC‐PRC‐02‐E (1) Garage Exhaust

4. NRCC‐PRC‐03‐E (2) Commercial Kitchens

5. NRCC‐PRC‐04‐E  (1) Data Centers

6. NRCC‐PRC‐05‐E  (5) Commercial Refrigeration

7. NRCC‐PRC‐06‐E  (3) Refrigerated Warehouses

8. NRCC‐PRC‐07‐E  (3) Refrigerated Warehouses‐ >3,000 SF

9. NRCC‐PRC‐08‐E  (5) Refrigerated Warehouses‐ >3,000 SF

10.NRCC‐PRC‐09‐E  (1) Laboratory Exhaust

11.NRCC‐PRC‐10‐E  (2) Compressed Air Systems

12.NRCC‐PRC‐11‐E  (1) Process Boilers19

The Journey3. Manufacturer

20

OWNEROPR

Cx Agent

INSTALLER

DESIGNERBODCC forms

PLANS EXAMINER

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Product Info

Page 11: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

11

Manufacturers

• The manufacturer or supplier of any manufactured device shall, upon request, provide to building designers and installers information about the device.  The information shall include the efficiency (and other characteristics regulated by Part 6). This information shall be in paper or electronic format.   Sec 10‐103(c) 

21

The Journey4. Commissioning Agent

22

OWNEROPR

Cx AgentCXR forms

INSTALLER

DESIGNERBODCC forms

PLANS EXAMINER

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Product Info

Page 12: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

12

• BUILDING COMMISSIONING is a systematic quality assurance process that spans the entire design and construction process, including verifying and documenting that building systems and components are planned, designed, installed, tested, operated and maintained to meet the owner’s project requirements.

Sec 100.1 Definitions

23

Sec 120.8 Building Commissioning

• For buildings less than 10,000 sf, design phase design review may be completed by the design engineer PE. 

• Buildings between 10,000sf and 50,000 sf require completion of the Design Review Checklist by either an engineer PE in‐house to the design firm but not associated with the building project, or a third party design engineer PE. 

• For buildings larger than 50,000 sf or for buildings with complex mechanical systems, an independent, review of these documents by a third party design engineer PE is required.

24

Page 13: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

13

Commissioning Matrix

25

Description of Project <10kSF10k‐50kSF with Simple Mech

>50kSF or with Complex Mech>10kSF

(d) SD Kickoff & CD Design ReviewPE or C10,C20

Note 1PE or C10,C20

Note 23rd Party PE

(e) Cx Measures in Specs and on Drawings

Req’d Req’d Req’d

(b)Owner Project Req (OPR)(c) Basis of Design (BOD)(f) Cx Plan(g) Functional Performance Tests(h) Systems Manual & Training(i) Cx Report

N/A Req’d Req’d

Note 1: By design engineer, or licensed contractor accepting responsibility of engineer.Note 2: By In-house engineer not associated with project, or 3rd party engineer, or

licensed contractor accepting responsibility of engineer.Complex Mech System: Multi-Zone AH, Built-Up Units, Steam heating, or Hydronic heat or cool

Title 24 Sec 120.8 and Sec 10-103(a)1

© Rick Miller, PE  2014

Sec 120.8 Building Commissioning

(b) Owner Project Requirements (OPR)(c) Basis of Design (BOD)

(d) SD & CD Design Reviews

(e) Cx Measures in Specs and on Drawings

(f) Cx Plan(g) Functional Performance Tests(h) Systems Manual & Training(i) Cx Report

26

Page 14: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

14

Forms to be completed by Commissioning Engineer

1. NRCC‐CXR‐01‐E (2) Design Review Kickoff

2. NRCC‐CXR‐02‐E (8) Construction Documents Review

3. NRCC‐CXR‐03‐E  (2) Simple HVAC Systems

4. NRCC‐CXR‐04‐E (6)  Complex Mechanical Systems

5. NRCC‐CXR‐05‐E (2)  Design Review Signature Page

27

NRCC‐CXR‐02‐EConstruction Document Review

28

Page 15: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

15

The Journey5. Plan Examiner

29

OWNEROPR

Cx AgentCXR forms

INSTALLER

DESIGNERBODCC forms

PLANS EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Product Info

Plans Examiner Responsibilities

The plans examiner is responsible for:A. Reviewing the plans and supporting material to 

verify that they contain the necessary information for a plan review.

B. Checking the calculations and data contained on the worksheets.

C. Indicating by checking a box on the summary forms that the compliance documentation is acceptable.

D. Making notes for the field inspector about which items require special attention.

30

Page 16: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

16

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• Application for a Building Permit. Each application for a building permit subject to Part 6 shall contain at least one copy of the documents specified in Sections 10‐103(a)2A, 10‐103(a)2B, and 10‐103(a)2C.

2A. Certificate of Compliance included in the Plans.2B. Plans and specs shall provide acceptance 

requirements for code compliance.2C. May be required to include electronic input 

file for the compliance software tool.31

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• (d) Enforcement Agency Requirements.

– 1. Permits. An enforcement agency shall not issue a Building Permit for any construction unless the enforcement agency determines in writing that the construction is designed to comply with the requirements of Part 6 that are in effect on the date the building permit was applied for. The enforcement agency determination shall confirm that the documentation requirements of Sections 10‐103(a)1 and 10‐103(a)2 have been met.

32

Page 17: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

17

The Journey6. Installer

33

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLANS EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Product Info

Forms to be completed by General Construction Foreman

1. NRCI‐ENV‐01‐E  (2) Envelope

34

Page 18: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

18

Forms to be completed by Electrical Construction Foreman

1. NRCI‐ELC‐01‐E  (2) Electrical Power Distribution2. NRCI‐LTI‐01‐E  (2) Validation of Certificate of Compliance3. NRCI‐LTI‐02‐E  (5) EMCS or Lighting Control System4. NRCI‐LTI‐03‐E  (3) Line‐Voltage Track Lighting5. NRCI‐LTI‐04‐E  (2) Two Interlocked Lighting Systems6. NRCI‐LTI‐05‐E  (5) Power Adjustment Factors7. NRCI‐LTI‐06‐E  (2) Videoconference Studio Lighting8. NRCI‐LTO‐01‐E  (2) Outdoor Lighting9. NRCI‐LTO‐02‐E  (5) EMCS ‐ Lighting Control System10.NRCI‐LTS‐01‐E  (2) Sign Lighting11.NRCI‐SPV‐06‐E (2) Solar Photovoltaic System

35

Forms to be completed by Mechanical Construction Foreman

1. NRCI‐MCH‐01‐E  (2) Mechanical

2. NRCI‐PLB‐01‐E  (2) Water Heating Systems

3. NRCI‐PLB‐02‐E  (4) HRR, H/M Single Dwell Unit Hot Water

4. NRCI‐PLB‐03‐E  (3) HRR, H/M Central Hot Water System

5. NRCI‐PLB‐04‐E  (2) Non‐Res Single Dwell Unit Hot Water

6. NRCI‐PLB‐05‐E  (2) Non‐Res Central Hot Water System

7. NRCI‐PRC‐01‐E  (2) Refrigerated Warehouse

8. NRCI‐STH‐01‐E  (2) Solar Water Heating System

36

Page 19: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

19

The Journey7. Manufacturer

37

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLAN EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNER

ACCEPT.  TESTER

BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Submittal Literature

MANUF.Installation Instructions

MANUF.Startup Technician

MANUF.Product Info

Manufacturers

• The manufacturer or supplier of any manufactured device shall, upon request, provide to building designers and installers information about the device.  The information shall include the efficiency (and other characteristics regulated by Part 6). This information shall be in paper or electronic format.   Sec 10‐103(c) 

38

Page 20: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

20

The Journey8. Acceptance Tester

39

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLAN EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNER

ACCEPT.  TESTERCA forms BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Submittal Literature

MANUF.Installation Instructions

MANUF.Startup Technician

MANUF.Product Info

• ACCEPTANCE REQUIREMENTS FOR CODE COMPLIANCE is a description of test procedures in the Reference Nonresidential Appendices that includes equipment and systems to be tested, functions to be tested, conditions under which the test shall be performed, the scope of the tests, results to be obtained, and measurable criteria for acceptable performance.

Sec 100.1 Definitions

40

Page 21: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

21

Sec 10‐103A Non‐Res Lighting Controls Acceptance Training Provider

• Certified Training Provider of Lighting Controls Acceptance Test Technicians

• Certified Lighting Controls Acceptance Test Technician (CLCATT).

• Effective upon reaching more than 300 CLCATT throughout the State.  [Requirements were met as of July 1, 2014.]

41

Sec 10‐103A Non‐Res Acceptance Testing Training

Technician

• CATT training program

• CATT training curricula

• CATT Employer training

• CATT Review

Provider

• CATP Provider of ATT training

• CATP Accountability

• CATP Revocation of Certificate42

Page 22: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

22

The CLCATT Confirms the CI Forms

43

“I have confirmed that the Certificate(s) of Installation for the construction or installation identified on the Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with the building permit(s) issued for the building.”

Acceptance Tests requiredbefore getting Occupancy Permit

44

“Before an occupancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for normal use, indoor lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in accordance with Section 130.4.(a). “

Page 23: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

23

Forms to be completed by Lighting Controls Acceptance Tester

1. NRCA‐LTI‐02‐E  (6) Lighting Controls

2. NRCA‐LTI‐03‐E  (9) Automatic Daylighting

3. NRCA‐LTI‐04‐E  (5) Demand Responsive Lighting Controls

4. NRCA‐LTO‐02‐E  (3) Outdoor Motion Sensor and Outdoor Automatic Shut‐off Controls

45

Forms to be completed by Mechanical Acceptance Tester

1. NRCA‐MCH‐02‐E (3) Mechanical Outdoor Air

2. NRCA‐MCH‐03‐E (3) Constant Volume Single Zone

3. NRCA‐MCH‐04‐E  (5) Air Distribution Duct Leakage

4. NRCA‐MCH‐05‐E  (3) Air Economizer Controls

5. NRCA‐MCH‐06‐E  (2) Demand Control Ventilation (DVC)

6. NRCA‐MCH‐07‐E  (3) Supply Fan Variable Flow Controls

7. NRCA‐MCH‐08‐E  (2) Valve Leakage Test

8. NRCA‐MCH‐09‐E  (3) Supply Water Temperature Reset

9. NRCA‐MCH‐10‐E  (3) Hydronic System Variable Flow

10.NRCA‐MCH‐11‐E  (2) Automatic Demand Shed Controls

11.NRCA‐MCH‐12‐E (2) Fault Detection & Diagnostics for DX Units46

Page 24: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

24

Forms to be completed by Mechanical Acceptance Tester

12. NRCA‐MCH‐13‐E (4) Fault Detection & Diagnostics for AHU

13. NRCA‐MCH‐14‐E (2) Dist Energy Storage DX AC Systems

14. NRCA‐MCH‐15‐E  (3) Thermal Energy Storage System

15. NRCA‐MCH‐16‐E  (3) Supply Air Temp Reset Controls

16. NRCA‐MCH‐17‐E  (3) Condenser Water Supply Temp Reset

17. NRCA‐MCH‐18‐E  (2) Energy Management Control System

47

Forms to be completed by Process Acceptance Tester

1. NRCA‐PRC‐01‐E  (4) Compressed Air Systems

2. NRCA‐PRC‐02‐E  (3) Commercial Kitchen Exhaust

3. NRCA‐PRC‐03‐E  (3) Enclosed Parking Garage Exhaust

4. NRCA‐PRC‐04‐E (2) Refri Wrh‐Evap Fan System Motor Controls

5. NRCA‐PRC‐05‐E (4) Refri Wrh‐Evap Condenser Controls

6. NRCA‐PRC‐06‐E (4) Refri Wrh‐Air‐Cooled Condenser Controls

7. NRCA‐PRC‐07‐E (3) Refri Wrh‐Variable Speed Compressor

8. NRCA‐PRC‐08‐E (2) Refri Wrh‐Electric Resistance UnderslabHeating System

48

Page 25: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

25

The Journey9. Owner

49

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLANS EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNERCx ReportO&M Manual

ACCEPT.  TESTERCA forms BLDG INSPECTOR

Certificate ofOccupancy

MANUF.Submittal Literature

MANUF.Installation Instructions

MANUF.Startup Technician

MANUF.Product Info

Owner

Owner receives copies of:

• All CC, CXR, CI, CA forms

• Cx Report

• O&M Manual

50

Page 26: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

26

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• (b) Compliance, Operating, Maintenance, and Ventilation Information to be provided by Builder:  “at final inspection, the enforcement agency shall require the builder to leave in the building”:

– 1. Compliance information.

– 2. Operating information.

– 3. Maintenance information.

– 4. Ventilation information.

51

The Journey10. Building Inspector

52

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLANS EXAMINERReviews CC, Cx formsIssues Permit

OWNERCx ReportO&M Manual

ACCEPT.  TESTERCA forms BLDG INSPECTOR

Reviews CI, CA formsConfirms O&M

Certificate ofOccupancy

MANUF.Submittal Literature

MANUF.Installation Instructions

MANUF.Startup Technician

MANUF.Product Info

Page 27: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

27

Field Inspector Responsibilities

The field inspector is responsible for:

A. Verifying that the building or system is constructed according to the plans.

B. Checking off appropriate items on the summary form at each relevant inspection.

C. Verifying that all of the required compliance documentation (Certificate(s) of Installation, Acceptance, and Field Verification and Diagnostic Testing) is completed, dated, signed, and registered (when applicable).

53

Sec 10‐103 Requirements for Designers, Installers, Builders, Manuf, and Testers

• (d) Enforcement Agency Requirements.

– 2. Inspection. The enforcement agency shall inspect newly constructed buildings and additions, and alterations to existing buildings to determine whether the construction or installation is consistent with the agency's approved plans and specifications, and complies with Part 6. Final Certificate of Occupancy shall not be issued until such consistency and compliance is verified.

54

Page 28: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

28

The Journey11. Certificate of Occupancy

55

OWNEROPR

Cx AgentCXR forms

INSTALLERCI forms Submittals

DESIGNERBODCC forms

PLANS EXAMINERReviews CC, Cx formsIssues Bldg Permit

OWNERCx ReportO&M Manual

ACCEPT.  TESTERCA forms BLDG INSPECTOR

Reviews CI, CA formsConfirms O&M

Certificate ofOccupancy

MANUF.Submittal Literature

MANUF.Installation Instructions

MANUF.Startup Technician

MANUF.Product Info

Decoding the Forms

NRCA‐LTI‐02‐E (Sample)

NR = Non ResidentialCC = Certificate of ComplianceCI = Certificate of InstallationCA = Certificate of Acceptance

CXR = Commissioning ReviewELC = ElectricalLTI = Lighting IndoorLTO = Lighting Outdoor

E = Enforcement AgencyA = Acceptance Testing TechnicianF = Field TechnicianH = HERS Rater

56

Page 29: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

29

Who Signs the CC, CI, CA Forms

• Persons who prepare Certificates (documentation authors) shall sign and certify the documentation is accurate and complete.

‐ AND ‐• The responsible person eligible under Division 3 of the Business and Professions Code to accept responsibility for the applicable scope of work specified on the Certificate shall sign and submit all applicable Certificates.– Licensed Architect– Licensed Engineer– Licensed Contractor

57

Who Signs the Cx Design Review

58

Owner/ Owner’s RepresentativeDesign Engineer

Design Reviewer

Owner/ Owner’s RepresentativeDesign Engineer

Design Reviewer

Design Review Kickoff

Construction Document Checklist

Date

Date

General Checklist for all BuildingsHVAC Simple or HVAC Complex

Page 30: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

30

Under Penalty of Perjury

59

DOCUMENTATION AUTHOR'S DECLARATION STATEMENT

Lighting Control Narrative

• Provide a lighting control narrative or sequence of operation for each different room type in sufficient detail so that the vendor can program it, the CxA can write a functional performance test for it, and for the CLCATT to test it.  

• The narrative needs to include general lighting, specialty light, egress lighting, emergency lighting, occupancy sensing, vacancy sensing, daylight harvesting, adaptive time delays, task tuning, personal controls, daytime, nighttime, weekends, holidays, demand response, event programming, high trims, low trims, fade rates, scene settings, etc.

60

Page 31: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

31

“Grandpa!  That’s Boring. ‐You gotta talk about video games!”

61

Eliminate Paperwork.Go Electronic !

• January 1, 2015 – All CA forms shall be registered electronically to a Data Registry approved by the Commission.  Sec 10‐103(a)1D.

• January 1, 2015 – All signatures on CA forms shall be electronically authenticated in accordance with JA7.6.  (7 pages)   Sec 10‐103(a)1D

• All CC, CXR and CI forms shall be registered electronically to a Data Registry as soon as one is approved by the Commission. Sec 10‐103(a)

62

Page 32: SLO GB Alliance - usgbcc4.org · Note 1: By design engineer, or licensed contractor accepting responsibility of engineer. Note 2: By In-house engineer not associated with project,

10/9/2014

32

Summary

• Need “passing grades” on all forms in order to be granted a Certificate of Occupancy.