sl. no designation place of posting...sl. no designation place of posting 26 sri praveen kumar...

10

Upload: others

Post on 18-Jan-2020

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works
Page 2: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works
Page 3: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

1 2 3 4 5

1 Sri Bhagwat Ram Nodal PMGSY BRRDA

2 Sri Ashok Kumar Assistant Engineer BRRDA, PMGSY

3 Sri Barun Kumar A.E-Cum-IT Nodal BRRDA, PMGSY

4 Sri Thakur Pramod Kumar Assistant Engineer MMGSY, HQ

5 Sri Rajesh Kumar Assistant Engineer MMGSY, HQ

6 Sri Krishna Kumar Assistant Engineer NABARD, HQ

7 Sri Ashok Kr. Mishra Superintending .Engineer Arah

8 Sri Sanjay Kr. Singh Executive Engineer. Works Division, Patna

9 Sri Ram Kr. Poddar Executive Engineer Works Division, Patori

11 Sri Chandraveer Narayan Executive Engineer Works Division, Sikharna(Dhaka)

12 Sri Prakash Executive Engineer Works Division, Mahnar

13 Sri Chandra Kishore Sah Executive Engineer Works Division, Muzaffarpur East

14 Sri Satrodha prasad Executive Engineer Works Division, Lakhisharai

15 Sri Sudhir Kumar Executive Engineer Works Division, Jaynagar

16 Sri Chandshekar Azad Executive Engineer Works Sub Division

17 Sri Sanjay Kumar Assistant Engineer Works Sub Division ,Jahanabad

18 Sri Ramaanuj Kumar Assistant Engineer Works Sub Division dhasawari

19 Sri Astutosh Kumar Assistant Engineer Works Sub Division thakurganj

20 Sri Arvind Kr. Sinha Assistant Engineer Works Sub Division Ekangarsarai

21 Sri Avinash Kumar Assistant Engineer Works Sub Division Rajgir

22 Sri Manish Kumar Assistant Engineer Works Sub Division Kadwa

23 Sri Vijay Kr. Pandey Assistant Engineer Works Sub Division Itarhi

24 Sri Shivendra Pasi Assistant Engineer Works Sub Division Charpokhari

Wo

rks

Div

isio

n

Training Programme on "Bridge Design and Construction"

schedule in the month of May, June and July2018

Batch I (From 14.05.2018 To 19.05.2018)

Works Division, Buxar

Name

Hea

d Q

ua

rter

10 Sri Moti Sagar Singh Executive Engineer

Page 4: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

25 Sri Chandshekar Singh Assistant Engineer Works Sub Division Baisi

26 Sri Priyranjan Assistant Engineer Works Sub Division Daraunda

27 Sri Vivek Soni Assistant Engineer Works Sub Division gaya

28 Sri Manjay Kumar Assistant Engineer Works Sub Division Bihutpur

29 Sri Sudhir Kumar Assistant Engineer Works Sub Division Islampur

30 Sri Rajiv Ranjan Assistant Engineer Works Sub Division panapur

31 Sri Anand Bihari Jha Assistant Engineer Works Sub Division Dehri

32 Sri Sitaram Singh Assistant Engineer Works Sub Division Dandari

33 Sri Kishore Kumar Assistant Engineer EO ,Works Muzarffarpur

34 Sri Barimaki Pd. Sinha Assistant Engineer Works Sub Division Tarapur

35 Sri Manoj Kumar Assistant Engineer Works Sub Division Kuchykot

36 Sri Binod Kumar Assistant Engineer Works Sub Division Biharsharif

37 Sri Chandu Batha Assistant Engineer Works Sub Division Lakhsarai

38Sri Ravindra kumar

sharma Assistant Engineer Works Sub Division Bahardur pur

39 Md. Shahid asahaf Assistant Engineer Works Sub Division Rajpur

40 Sri Arjun Pd. Sinha Assistant Engineer Works SubDivision Danapur

41 Sri Rajendra Pd. Singh Assistant Engineer Works Sub Division Belchhi

42 Sri Sanjay Kr. Sharma Assistant Engineer Works Sub Division Punpun

43 Sri Manoj Kumar Assistant Engineer Works SubDivision Naubatpur

44 Sri Ajeet Kumar Assistant Engineer Works SubDivision Asthawan

45Sri Dhananjay Kumar

NiralaAssistant Engineer Works Sub Division Harnaut

46 Sri Subhash Kumar Assistant Engineer Works SubDivision Silaw

Wo

rks

Div

isio

n

Batch I (From 14.05.2018 To 19.05.2018)

Name

Page 5: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

1 Sri Nalin Kumar Sinha Nodal MMGSY BRRDA

2 Sri Ratnesh Kumar Executive Engineer C.E-1, Patna

3 Sri Sameer Kumar Executive Engineer C.E-3, Patna

4 Sri Sanjeev Kumar Executive Engineer C.E-2, Patna

5 Sri Rakesh Ranjan Pandey Executive Engineer. C.E-1, Patna

6 Sri Anand Prakash Assistant Engineer BRRDA, PMGSY

7 Sri Amerenda Kr. Singh Superintending Engineer Nalanda

8 Sri Sanjay Kr. Singh Executive Engineer. Works Division,

9 Sri Shankar Dayal Shukla Executive Engineer Works Division,

10 Sri Arbind Kumar Executive Engineer Works Division, Madhubani

11 Sri Ashok Kumar Executive Engineer Works Division, Darbhanga-2

12 Sri Manoj Kumar Executive Engineer Works Division, Darbhanga-1

13 Sri Ramasish Paswan Executive Engineer Works Division, Chapra-1

14 Sri Rameshwar Pd. Singh Executive Engineer Works Division, Danapur

15 Sri Sanjay Kumar Executive Engineer Works Division, Badh

16 Sri Rajeev Ranjan Kr. Executive EngineerWorks Division, Quality Control

(HQ)

17 Sri RajKishor Pd. Singh Assistant Engineer Works Sub Division Vikramganj

18 Md. Ashfik Ahmad Assistant Engineer Works Sub Division Sabor

19 Sri Sunil Kumar Assistant Engineer Works Sub Division Jale

20 Sri Pankaj kumar Assistant Engineer Works Sub Division Fathepur

21 Sri Vikash Kumar Assistant Engineer Works Sub Division Dhaka

22 Sri Satish chand Assistant Engineer Works Sub Division Tarai

23 Sri Manoj Kumar Assistant Engineer Works Sub Division Kuchykot

24 Sri Kumar Gaurav Assistant Engineer Works Sub Division Araria

25 Md. Gayaudiin Assistant Engineer Works Sub Division Suryagarha

26 Sri Premchand Jha Assistant Engineer Works Sub Division Sursand

Wo

rks

Div

isio

n

Batch II (From 11.06.2018 To 16.06.2018)

NameH

ead

Qu

art

er

Page 6: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

27 Sri Yogesa chand Mishra Assistant Engineer Works Sub Division Dehri

28 Md. Parvij Alam Assistant Engineer Works Sub Division Lalganj

29 Sri Bharat Bhushan Bharti Assistant Engineer Works Sub Division Andhratadhi

30 Sri Ramchand Pandit Assistant Engineer Works Sub Division Paliganj

31 Sri Kumar Gaurav Assistant Engineer Works Sub Division Basantpur

32 Sri Awadesh kumar Assistant Engineer Works Sub Division Daudnagar

33 Sri Ashok Kumar Assistant Engineer Works Sub Division Rahui

34 Sri Avinash Kumar Assistant Engineer Works Sub Division Tekari

35 Sri Grija Nand Singh Assistant Engineer Works Sub Division Amour

36 Sri Pritam Kumar Assistant Engineer Works Sub Division Pupri

37 Sri Bibash Pal Assistant Engineer Works Sub Division Kusukata

38 Sri Baleshwar Ram Assistant Engineer Works Sub Division Masarakha

39 Sri Bidyanand Prasad Assistant Engineer Works Division KrayParshuram

40 Sri Vivek Kumar Assistant Engineer Works Sub Division Kargahar

41 Sri Sita Ram Sahni Assistant Engineer Works Sub Division Nokha

42 Sri Raja Om Prakash Assistant Engineer Works Sub Division Akhodhi Gola

43 Sri Sanjay Kumar Pandey Assistant Engineer Works Sub Division Sanjhauli

44 Sri Satish Chandra Rajak Assistant Engineer Works Sub Division Chainpur

45 Sri Rakesh Kumar Pal Assistant Engineer Works Sub Division Mohania

46 Sri Anwar Husain Ansari Assistant Engineer Works Sub Division Ara

Wo

rks

Div

isio

n

Batch II (From 11.06.2018 To 16.06.2018)

Name

Page 7: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

1 Sri Sunil Kumar Nodal QMC Cell, QMC Cell /NABARD, HQ

2 Sri Kumar Rajeew Ranjan Executive Engineer BRRDA, PMGSY

3 Sri Madhulika Kumari Assistant Engineer CE-4, HQ

4 Sri Yogendra Kr. Bhatiya Assistant Engineer MMGSY, HQ

5 Sri Indrajeet Kumar Assistant Engineer MMGSY, HQ

6 Sri Sheo Pratap Singh Assistant Engineer BRRDA, PMGSY

7 Sri Nirmal Kr. Superintending .Engineer

8 Sri Ajay Kr. Singh Executive Engineer. Works Division, Raxual

9 Sri Abhay Kumar Sharma Executive Engineer Works Division, Purnea

10 Sri Amal Prakash Executive Engineer Works Division, Kishanganj-1

11 Sri Shailendra Kumar Executive Engineer Works Division, Madhepura

12 Sri Ashok Kumar Gupta Executive Engineer Works Division, Virpur

13 Sri Anil Kumar Executive Engineer Works Division, Pakridayal

14 Sri Manoj Kumar Executive Engineer Works Division, Sherghati

15 Md. Arshad Executive Engineer Works Division, Rajauli

16 Sri Hridya Nand Mahto Executive Engineer Works Division, Baisi

17 Sri Vivek Kumar Assistant Engineer Works Sub Division Kargahar

18 Sri Kashlesh Kumar Assistant Engineer Works Sub Division Bagaha-1

19 Sri Avinash Kumar Assistant Engineer Works Sub Division jamdaha

20 Sri Sujet Kumar Ranjan Assistant Engineer Works Sub Division Garua

21 Sri Sudhir Kumar Assistant Engineer Works Sub Division Gaya

22 Sri Sunil Kumar Singh Assistant Engineer Works Sub Division Madhwapur

23 Sri Binod Kumar

Prabhakar

Assistant Engineer Works Sub Division Ismaila pur

24 Sri Ravindra Kumar Singh Assistant Engineer Works Sub Division Purnea

25 Sri Satish Choudhary Assistant Engineer Works Sub Division balmakhi

NameH

ead

Qu

art

er

Batch III (From 09.07.2018 to 14.07.2018)

Wo

rks

Div

isio

n

Page 8: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

Sl. No Designation Place of Posting

26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna

27 Sri Ram Babu Assistant Engineer Works Sub Bhorai

28 Sri Vikash Kumar Assistant Engineer Works Sub Division Fullidumor

29 Sri Prabhat Kumar Raj Assistant Engineer Works Sub Division Ghoghradiha

30 Sri Arbind Kumar Das Assistant Engineer Works Sub Division Mahura

31 Sri Manoj Kumar Assistant Engineer Works Sub Division Biroul

32 Sri Ajit Kumar Das Assistant Engineer Works Sub Division Balrampur

33 Sri Manoj Kumar Assistant Engineer Works Sub Division

34 Md. Iftakar Ahmad Assistant Engineer Work Sub Division Kukoliya

35 Smt. Priyanka Kumari Assistant Engineer Adanvance Planing Division -1

36 Smt. Supriya Rani Assistant Engineer Works Division Patna

37 Sri Bhagirath Ram Assistant Engineer Works Sub Division Beriya

38 Sri Ashok Kumar Assistant Engineer Works Sub Division Isubpur

39 Sri Babu Lal Prasad Assistant Engineer Works Sub Division Garahani

40 Sri Ram Sewak Singh Assistant Engineer Works Sub Division Buxar

41 Sri Satish Chandra Assistant Engineer Works Sub Division Tarari

42 Sri Ashok Kumar

Srivastava

Assistant Engineer Works Sub Division Nawnagar

43 Sri Anish Kr.Singh Assistant Engineer Works Sub Division , Chakai

44 Sri Sanjay Kumar Sinha Assistant Engineer Works Sub Division Manpur

45 Sri Arun Singh Assistant Engineer Works Sub Division Nawada

46 Sri Afran Ahmad Assistant Engineer Works Sub Division Arwal

Batch III (From 09.07.2018 to 14.07.2018)

Wo

rks

Div

isio

nName

Page 9: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

“Basic Training Programme on Bridge Engineering”

Module: Planning and Design of Culverts & Bridges, Construction Management and

QA/QC, Bridge Inspection, Maintenance, Repair and Rehabilitation

1st day: PLANNING & DESIGN

09:30-10:30 Registration & Introduction

10:30-12:00 Selection of site for bridges/culverts, collection of site data, topographical survey, hydraulic

study (i.e. discharge calculations using different methods, linear waterway, scour depth,

Afflux etc.).

12:00-13:30 Sub-surface/geological investigations for soils/rock (boring, collection of samples at site,

testing & preparation of report including calculations), general design requirements (i.e.

geometry, span arrangement, cross-sectional elements etc.).

13:30-14:30 Lunch

14:30-16:00 Components of a box/slab/pipe culvert, selection criteria for box/slab/pipe culverts, codal

provisions for design & detailing of box/slab/pipe culverts, preparation of design philosophy

report & general arrangement drawings for culverts.

16:00-17:30 Design & detailing of box/slab/pipe culverts & wing walls, floor protection works for

culverts, design & detailing of prefabricated (precast) culverts & wing walls, checklist for

design of various components of culvers.

2nd

day: PLANNING & DESIGN

10:00-11:30 Components of a bridge, type of bridges (based on span length, construction material,

shapes, support conditions and construction techniques etc.), integral bridges.

11:30-13:00 Selection criteria for type of bridges, selection criteria for foundations, selection criteria for

substructure & earth retaining structures, selection criteria for superstructure, selection

criteria for bearings, selection criteria for expansion joints.

13:00-14:00 Lunch

14:00-15:30 Codal provisions for design & detailing of bridges, design & detailing of temporary

structures (i.e. formwork/ falsework), preparation of design philosophy report & general

arrangement drawings for bridges.

15:30-17:00 Design and detailing of open/pile/well foundations, design and detailing of substructure &

earth retaining structures, design and detailing of bearing pedestals & reaction blocks, design

and detailing of return walls/dirt walls/wing walls

3rd

day: DESIGN (forenoon) & CONSTRUCTION (afternoon)

10:00-11:30 Design and detailing of RCC superstructure, design and detailing of bearings & expansion

joints, design and detailing of approach slab & corbel supporting approach slab, design of

floor protection and river training works, design of submersible bridges.

11:30-13:00 Checklist for design of various components of bridges, post training evaluation including

question banks & practical exercises on design of bridges/culverts.

13:00-14:00 Lunch

14:00-15:30 Construction equipment for bridges/culvers, earthwork in excavation and filling, fabrication

& transportation temporary structures (i.e. formwork/falsework), erection & dismantling of

temporary structures, construction materials for bridges/culverts, properties & mix design of

concrete, production & transportation of concrete, placement & compaction of concrete,

testing of concrete, curing of concrete, fabrication & placement of reinforcement cage,

specifications for cover blocks, construction of cast-in-situ box/slab culverts, construction of

prefabricated (precast) culverts and wing walls, construction of pipe culverts, checklist for

construction of culverts.

Page 10: Sl. No Designation Place of Posting...Sl. No Designation Place of Posting 26 Sri Praveen Kumar Assistant Engineer Works Sub Division Khutauna 27 Sri Ram Babu Assistant Engineer Works

15:30-17:00 Construction of open foundations, construction of pile foundations, construction well

foundations, construction of substructure & earth retaining structures, construction of bearing

pedestals and reaction blocks, construction of return walls/dirt walls/wing walls.

4th

day: CONSTRUCTION (forenoon) & MAINTENANCE (afternoon)

10:00-11:30 Construction of RCC superstructure, fabrication/testing/installation of bearings,

fabrication/testing/installation of expansion joints, laboratory testing, construction tolerances,

checklist for various activities of bridge construction, documentation and project records.

11:30-13:00 Wearing coats, drainage spouts, crash barriers, kerbs and parapets, approach slab and corbel

supporting approach slab, filling behind earth retaining structures, filter media & weep holes,

construction of floor protection and river training works, post training evaluation including

question banks & practical exercises on construction of bridges/culverts.

13:00-14:00 Lunch

14:00-15:30 Maintenance of temporary structures (i.e. formwork/falsework) after use, replacement of

bearings and expansion joints, maintenance of bridges/culverts, maintenance of floor

protection and river training works, checklists for maintenance of bridges/culverts.

15:30-17:00 Post training evaluation including question banks & practical exercises on maintenance of

bridges/culverts.

5th

day: INSPECTION, PERFORMANCE MONITORING, CAPACITY EVALUATION & TESTING

OF BRIDGES

10:00-11:30 Bridge Inventory, inspection of bridges and culverts after constructions, inspection of

existing bridges and culverts, inspection of floor protection and river training works,

checklists for inspection of bridges/culverts.

11:30-13:00 Continued

13:00-14:00 Lunch

14:00-15:30 Load carrying capacity evaluation and residual life assessment of bridges

15:30-17:00 Non-destructive testing (NDT) of bridges and culverts, load testing and rating of bridges

6th

day: REPAIR AND REHABILITATION OF BRIDGES

10.00-11:30 Repair materials and techniques, external pre-stressing technique for strengthening of bridges

11:30-13:00 Retrofitting and rehabilitation of bridges, latest practices and techniques for rehabilitation of

bridges.

13:00-14:00 Lunch

14:00-16:00 Post training evaluation including question banks & practical exercises on inspection,

performance monitoring, capacity evaluation, testing, repair & rehabilitation of

bridges/culverts.

16.00-17.00 Concluding Session