skip to main | skip to sidebar

4
skip to main | skip to sidebar Any takers! ASSIGNMENT/S SOLICITED WORK/ASSIGNMENT This Blog Linked From Here The Web This Blog  Linked From Here  The Web  Friday, December 4, 2009 ANY TAKERS? ASSIGNMENT/SOLICITED.  Summary résumé (Arvind) Aurovindo Choudhury Email: [email protected] Now on vacation at: Tel: (033)64153255 Among thousands of activities, professional achievements, publications, seminars and conferences internationally following is a summary: Experience: Summary: Feasibility studies, Environmental Impact Assessment, Socio-Economic impact, Strategy, and Project Managent, EPC, of Pipelines(Oil, Gas and Iron Ore, Coal-pipelines for transportation of solids), Power Generation Projects,(Hydel, Conventional fossil fuel and Nuclear), Northern (Arctic) Fuel Storage and Transportation, etc., Offshore Oil production, Planning & Scheduling with resource allocation, Cost Control, Coordination, Surveying, Opencast and underground Mining, Soil testing, core logging, EPC, Inspections, ASME, ASTM, API, etc., NDT, Liaison, Safety, QC, Time & Motion Study, Documentation Control, etc. 2007 Self employed on different jobs. Project Inspector/Manager 1996-2006 Stanley Associates and Ferguson Simmek Clark, Architects & Engineers, EBA Engineering Yellowknife, Canada. Summer employment in Project Inspections, Coordination, Problem solving, client liaison at sites. Projects handled: Pangnirtung Fuel Storage construction, Cape Dorset Pipelines and Fuel Storage, Kugluktuk water supply Pipeline, Grise Fiord Water Storage Tanks, Repulse Bay Fuel Storage and Pipeline, Sachs Harbor Pipeline, Saniquilaq Fuel Storage and Pipeline, as builds, O & M Manuals, and many other Northern communities in Arctic Circle for Government of Nunavut and NT. Project valuation 30 to 100 Million. Project Manpower of the Contractor 15 to 50. 1989-1995 Self employed consultant in different parts of the world. (a) Feasibility reports of Pipelines/ Solid/Gas/Liquids. (b) Product diversification planning and implementation of Industrial houses.

Upload: ceaurovindo

Post on 30-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

8/14/2019 Skip to Main | Skip to Sidebar

http://slidepdf.com/reader/full/skip-to-main-skip-to-sidebar 1/4

skip to main | skip to sidebar Any takers! ASSIGNMENT/S SOLICITEDWORK/ASSIGNMENT

This Blog Linked From Here The WebThis Blog 

Linked From Here

 

The Web 

Friday, December 4, 2009ANY TAKERS? ASSIGNMENT/SOLICITED. 

Summary résumé

(Arvind) Aurovindo Choudhury Email: [email protected] on vacation at: Tel: (033)64153255Among thousands of activities, professional achievements, publications, seminarsand conferences internationally following is a summary:Experience:Summary: Feasibility studies, Environmental Impact Assessment, Socio-Economicimpact, Strategy, and Project Managent, EPC, of Pipelines(Oil, Gas and Iron Ore,

Coal-pipelines for transportation of solids), Power Generation Projects,(Hydel,Conventional fossil fuel and Nuclear), Northern (Arctic) Fuel Storage andTransportation, etc., Offshore Oil production, Planning & Scheduling with resourceallocation, Cost Control, Coordination, Surveying, Opencast and undergroundMining, Soil testing, core logging, EPC, Inspections, ASME, ASTM, API, etc., NDT,Liaison, Safety, QC, Time & Motion Study, Documentation Control, etc.

2007 Self employed on different jobs.

Project Inspector/Manager

1996-2006 Stanley Associates and Ferguson Simmek Clark, Architects & Engineers,EBA Engineering Yellowknife, Canada.

Summer employment in Project Inspections, Coordination, Problem solving, clientliaison at sites. Projects handled: Pangnirtung Fuel Storage construction, CapeDorset Pipelines and Fuel Storage, Kugluktuk water supply Pipeline, Grise FiordWater Storage Tanks, Repulse Bay Fuel Storage and Pipeline, Sachs Harbor Pipeline,Saniquilaq Fuel Storage and Pipeline, as builds, O & M Manuals, and many otherNorthern communities in Arctic Circle for Government of Nunavut and NT.Project valuation 30 to 100 Million. Project Manpower of the Contractor 15 to 50.

1989-1995 Self employed consultant in different parts of the world.(a) Feasibility reports of Pipelines/ Solid/Gas/Liquids.(b) Product diversification planning and implementation of Industrial houses.

8/14/2019 Skip to Main | Skip to Sidebar

http://slidepdf.com/reader/full/skip-to-main-skip-to-sidebar 2/4

(c) Regulatory compliance, Environment, Safety, Capital Goods Imports, etc.

1987-1988 Abbottsfield Engineering Services working on the Boiler upgrading andinstrumentation, instrument logging, vendor coordination, site visits, etc.Studies on slurry Pipelines and tailing ponds, etc. Project value: 5-10 M. ProjectManpower of the contractor10.

1985-1986 Foster Wheeler Petroleum Development (Canada) Ltd., Calgary. Dy. Project

Manager, working on the Feasibility Project report for offshore hydrocarbondevelopment at Hibernia of Petro Canada. Project Cost when implemented few hundredmillion dollars. Coordination with vendors, clients, Engineers.

1983-1984 Rankine and Hills, Sydney, Australia, Consulting Engineer as a CostEngineer working on the development of Process and Project on Shale Oil projectdevelopment for Esso Australia. Studied “Sasol” (South Africa) coal liquefactionplants, process of Lurgi (Germany), etc. Project cost when implemented few hundredmillion dollar. Coordination and Project Cost Development.

1979-1982 Atomic Energy of Canada Ltd., Planning & Scheduling and Cost Control(Scope changes approval procedures) on CANDU nuclear generating stations designand Construction. Worked on Gentilly II in Quebec, Wolsung I in Korea and Kordoba

in Argentina, Project costs totaling about 3 Billion Dollars. In housecoordination, liaison, chasing many.1977-1978 Monenco Bannister Pipelines, Montreal, feasibility of a Coal Pipelinefrom B.C. to Thunder Bay for Trans Canada Pipelines. Gas Arctic ProjectFeasibility.

1972-1976 Canadian National, (Pipelines R&D), Montreal.Development of Pipelines for Solid Transportation, feasibility reports, minevisits, pulp and paper mill visits for optimized transportation proposals.Preliminary designs, Cost Estimating, coordination with Consulting Engineers,clients, coordination with Gas Arctic Project proposals, studies of alternativeeconomic ways of transportation of gas, Justice Burger Commission reportsanalysis, Northern Realities, etc. Studied and coordinated with Black Mesa

Pipelines, (Coal), put up proposals for transportation by Pipelines of KudramukhIron Ore Project, India (implemented by Bechtel)

1968-1972 The Hydro Electric Power Commission of Ontario, Planning & Scheduling,and, Coordination of Power Generation stations construction of Aubrey Falls G.S.,Wells G.S. (both hydel), Nanticoke G.S. (Conventional Coal fired) and PickeringG.S. (CANDU based nuclear generation). Used in house Planning and Schedulingprograms on mainframe.

1963- 1967 The Burma Oil Co.(Pipelines) Ltd., The first crude oil pipeline inIndia from Nahorkatia to Barauni 720 km. Reconnaissance, Surveying, Preliminarydesign, Construction Inspection and Commissioning. Contractors Mannesmann ofGermany and SAIPEM of Italy., IOC (Pipelines) Nationalized liquid hydrocarbon

organization's Product Pipelines, Siliguri - Gauhati, Kanpur Haldia, totalingabout 1500 km.1960-1962 S.. Lal & Co. Mine owners:Mining (Underground & Opencast), Metalliferrous, Coal. Mine operations,explorations, Surveying, etc.2. Publications:In different Professional journals, all over the world more than 10 werepublished. Many awards and laurels.3. Personal:3.a. Photography,3.b. Socio economic and cultural developments,

8/14/2019 Skip to Main | Skip to Sidebar

http://slidepdf.com/reader/full/skip-to-main-skip-to-sidebar 3/4

3.c. Commissioner of Oaths for the Province of Quebec, Canada withJurisdiction of all the Countries of the world.3.d.. First Aid Training from St. John Ambulance.

4. Skills:4.a. Driver's license,4.b. Coordination and Liaison, Surveying, Computer handling with packaged (Word,Excel, AutoCAD, Accpac, Photoshop, etc.) programs, Typing speed about 50 wpm,

etc..5. Schools & Professional:(a). Completed 2nd year of the courses of the Society of Industrial Accountants(1970)(b). BA (Econ), Ottawa,(c). API School of Pipeline Tech., Univ. of Texas At Austin,(d) Civil Engg.(e) Diploma in Surveying.

6. Professional Achievements:(a) Member, American Association of Cost Engineers MAACE

(b) Canadian Institute of Surveying.(c) Canadian Institute of Mining & Metallurgy.(d) Life fellow The Institution of Engineers (India, Bangladesh) , CharteredEngineer and Enr.(e) Verein Deutchiere Inginiere, Germany. VDI(f) Member British and Australian Institute of Management. MBIM(g) Fellow Institute of Petroleum, UK. F.Inst.P.E

7. Laurels:Many awards for new thinking published, implemented both Engineering and Systems.

Ref:Mr, Kevin Hodgins, P.Eng., Director,FSC Architects & Engineers, Email: [email protected] Tel: (867)920-2882

Mr. Walter Orr, P.Eng., Project Manager,FSC Architects & Engineers, Email: [email protected] Tel: (867) 920-2882

I thank you for taking your time.With regards,

(Arvind)Aurovindo Choudhury.

Engr. Aurovindo Choudhury, C.Eng., FIE for life,(India, Bangladesh), VDI(Germany),MBIM(UK & Aust), FInstP(UK), MAACE(US),MCIMM, MCIS(Canada), etc., Commissioner ofOaths for the province of Quebec with jurisdiction of all the countries of theworldNow on vacation at B-6/108 Central Ave., West, KALYANI, India.Tel: 011-91-33-64153255,Email: [email protected]

8/14/2019 Skip to Main | Skip to Sidebar

http://slidepdf.com/reader/full/skip-to-main-skip-to-sidebar 4/4

Posted by Aurovindo at 4:32 AM 0 commentsLabels: ANY TAKERS? ASSIGNMENT/S SOLICITED.Subscribe to: Posts (Atom) Followers

 Any takers! ASSIGNMENT/S SOLICITED. powered by