sketch 022 tripping matrix
TRANSCRIPT
AMAL POWER STATION
TYPICAL GTG TRIPPING MATRIX
A 9/1/2008 JSL Issued for Tender
0 6/1/2008 JSL Issued for Comments
REV DATE DESCRIPTION REF IND SIGN
PDO APPROVAL
PROJECT DRAWING REVISION
AREA : Alam
SUB AREA : Amal Power Station
DRAWING IDENTIFICATION
DRWG. TYPE : TYPICAL DRWG AREA ENG. SERIAL SHEET PROJ. DWG. REV.
TYPICAL GTG TRIPPING MATRIX CODE SECT. NUMBER No. CODE SIZE
DRAWNBY
CHECKEDBY
APPROVEDBY
PETROLEUM DEVELOPMENT OMAN
No. Sketch 022
Amal Power Station GAS TURBINE AND GAS TURBINE GENERATOR TRIP LOGIC DIAGRAM Page 01 of 04
CAUSE
1 · · · · · · 87G Generator Differential Operated 1
2 · · · · · · 59N1 2
3 · · · · · · 51N 3
4 64R 4
5 · · · · · · 64R 5
6 26 6
7 · · · · · · 26 7
8 · · · · · · 59GN1 8
9 · · · · · 5 Emergency stop push button operated 9
10 · · · · 40G 10
11 · · · · 27/40 11
12 46G 12
13 · · · · 46G 13
14 14
15 · 49G 15
16 · · · · 49G 16
17 · · · · 78G Pole slipping relay operated 17
18 99G Over fluxing protection relay stage-1 operated 18
19 · · · · 99G Over fluxing protection relay stage-2 operated 19
20 · · · · 96GDead machine protection operated
20
21 21
22 · · · · 27G 22
23 81.1G Under frequency relay stage-1 operated 23
24 · · · · 81.2G Under frequency relay stage-2 operated 24
25 59.1G Generator over voltage relay stage1 operated 25
26 · · · · 59.2G Generator over voltage relay stage2 operated 26
27 · · · · 32R1 Reverse power relay stage-1 operated 27
28 · · · · 32R2 Reverse power relay stage-2 operated 28
EFFEC
T
A B C D
Gas
Turb
ine t
rip
Gas
Turb
ine S
hurd
ow
n w
ith U
nlo
ad
Exci
ter
field
bre
ake
r tr
ipp
ed
Rele
ase
of
CO
2 in
to G
en
era
tor
en
closu
re
Rele
ase
of
CO
2 in
to G
T e
ncl
osu
re
13
2kV
Bre
ake
r A
11
0/7
31
0 8
6H
tri
pp
ed
13
2kV
Bre
ake
r A
11
0/A
71
0 8
6E
tri
pp
ed
13
2kV
Bre
ake
r A
12
0/A
72
0 8
6H
tri
pp
ed
13
2kV
Bre
ake
r A
12
0/A
72
0 8
6E
tri
pp
ed
13
2kV
bu
s zo
ne t
rip
Blo
ck G
en
era
tor
syn
ch
Red
uce
Exci
tati
on
com
man
d t
o A
VR
pro
mp
t op
era
tor
for
load
man
ag
em
en
t
Ala
rm/I
nd
icati
on
Class of Shutdown MASTER TRIP RELAYS MAJOR EQUIPMENT TRIPS ALARM/CONTROL EFFECTS
LEGEND FOR Class of Shutdown
A Shut down : Trip GCB, Trip Excitation, GT Running C Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
B D Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down), Trip 132kV Circuit Breaker(s), Trip 6.6kV incomer
Generator stator earth fault relay operated ( 0 to 95%)
Generator stator earth fault current relay operated
Generator rotor earth fault relay first stage operated( <80kohm)
Generator rotor earth fault relay second stage operated( <5kohm)
Generator Fire Detector temperature high Stage 1 ( 80deg C)
Generator Fire detector temperature high Stage 2 ( 100deg C)
Generator stator earth fault protection operated ( 95 to 100%)
Loss of excitation relay operated together with 27/40 rly oprtd and prot PT fuse healthy
40G relay operated together with 27/40 rly not oprtd, prot PT fuse healthy and with time delay
Negative sequence current relay stage-1 operated
Negative sequence current relay stage-2 operated
Over load relay ( thermal replica type) stage-1 operated
Over load relay ( thermal replica type) stage-2 operated
Under voltage relay operated together with PT fuse healthy - Stage 2
Mast
er
Tri
p r
ela
ys
86
U1
an
d 8
6U
2Tri
p G
CB
, E
xci
tati
on
, an
d G
as
Tu
rbin
eLo
cal R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G2
an
d 8
6G
3
Tri
p G
CB
an
d E
xci
tati
on
Loca
l R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G3
an
d 8
6G
4Tri
p G
CB
an
d E
xci
tati
on
Loca
l an
d R
om
te R
ese
t
Gen
era
tor
CB
D5
70
/D3
70
tri
pp
ed
( T
rip
co
il-1
op
r.)
Gen
era
tor
CB
D5
70
/D3
70
tri
pp
ed
( T
rip
co
il-2
op
r.)
6.6
kV M
VU
AS
-3 in
com
er
trip
ped
(
E1
80
/E2
80
)
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-1
to A
UTO
-2
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-2
to A
UTO
-1
Shut down : Unload GT, Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
Amal Power Station GAS TURBINE AND GAS TURBINE GENERATOR TRIP LOGIC DIAGRAM Page 01 of 04
CAUSE
29 29
30 30
31 31
32 32
33 33
34 · · · · · · Gas Turbine trip 34
35 · · · · · 50LBB 35
36 · · · · 21GT 36
37 51.1G Over current protection relay operated 37
38 · · · · · · · · · · · 59N2 11kV bus earth fault relay operated 38
39 60.2G AVR PT1 fuse failure 39
40 60.4G AVR PT2 fuse failure 40
41 60.5G Metering PT fuse failure 41
41A 58 Excitor Diode Failure (Open ckt) 41A
41B 58 Excitor Diode Failure (Short ckt) 41B
42 60.1G Protection PT1 fuse failure 42
43 60.3G Protection PT2 fuse failure 43
44 FFR 44
45 · · · · · · · 87GT 45
46 · · · · · · · 64R(gt) 46
47 · · · · · · · 51SBEF 47
48 · · · · · · 67N 48
49 · · · · · · · 21 G 49
50 · · · · · 59/81 50
51A · · · · · · · 50BF1 51A
51B · · · · · · · 50BF2 51B
52 52
53A 53A
53B · · · · · 53B
54 · · · · · 87T MVUAT diff. Protection operated 54
55 · · · · · 64R(LV) MVUAT LV REF Protection operated 55
56 · · · · · 56
57A MVUAT 49(OT)T, 49(WT)T 57A
57B · · · · · MVUAT 63(B)T, 63(TCB)T, 63PRV(T) 57B
58 58
59 86T 59
59A · · · · · · IPS trip 59A
EFFEC
T
A B C D
Gas
Turb
ine t
rip
Gas
Turb
ine S
hurd
ow
n w
ith U
nlo
ad
Exci
tor
field
bre
aker
trip
ped
Rele
ase
of
CO
2 into
Genera
tor
Rele
ase
of
CO
2 into
Gt
Encl
osu
re
132kV
Bre
aker
A11
0/7
310 8
6H
tri
pped
132kV
Bre
aker
A110/A
710 8
6E t
rip
ped
132kV
Bre
aker
A120/A
720
86H
tri
pped
132kV
Bre
aker
A120/A
720 8
6E t
rip
ped
132kV
bus
zone t
rip
Blo
ck G
nera
tor
synch
Reduce
Exci
tati
on c
om
mand t
o A
VR
Pro
mt
opera
tor
for
load m
anagem
ent
Ala
rm/Inic
ati
on
Class of Shutdown MASTER TRIP RELAYS MAJOR EQUIPMENT TRIPS
LEGEND FOR Class of Shutdown
A Shut down : Trip GCB, Trip Excitation, GT Runnin C Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
B D Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down), Trip 132kV Circuit Breaker(s), Trip 6.6kV incomer
Generator Circuit Breaker fail protection operated
Generator Backup impedance relay operated togather with PT fuse healthy
( 132kv side)
Synchronisation PT fuse failure (Both generator side and step-up
transformer side of generator circuit breaker)
Generator transformer differential relay operated
Generator transformer REF protection operated
Generator transformer backup earth fault protection operated
GTX directional earth fault relay operated ( 132kv side)
Generator backup impedance prot. Operated ( 11kV Side)
Generator transformer overfluxing protection operated ( 132kV side)
132kV Bus Circuit Breaker Fail (A510/A310)
132kV Tie Circuit Breaker Fail (A520/A320)
Generator transformerGTX 49(OT)A, 49(WT)A, 63(B)A, 63(TCB)A, 71(LO)A - Stage 1
Generator transformer GTX 49(OT)T, 49(WT)T - Stage 2
Generator transformer 63(B)T, 63(TCB)T, 63(PR)T - Stage 2
50, 51, 51N
MVUAT Non direct. O/C, E/F protection operated
MVUAT 49(OT)A, 49(WT)A, 63(B)A, 63(TCB)A, 71(LO)A
6.6kV MVUAS switchboard incomer master trip relay operated
Mast
er
Tri
p r
ela
ys
86U
1and 8
6U
2Tri
p G
CB
, Exc
itati
on, and G
as
Turb
ine
Loca
l R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86G
2 a
nd 8
6G
3
Tri
p G
CB
and E
xci
tati
on
Loca
l R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86G
3 a
nd 8
6G
4Tri
p G
CB
and E
xci
tati
on
Loca
l and R
om
te R
ese
t
Genera
tor
CB
D570/D
370 t
rip
ped (
Tri
p c
oil-
1 o
pr.
)
Genera
tor
CB
D570/D
370 t
rip
ped (
Tri
p c
oil-
2 o
pr.
)
6.6
kV M
VU
AS-3
inco
mer
trip
ped
(E180/E
280)
AV
R R
egula
tion C
hangeover
from
AU
TO
-1 t
o
AU
TO
-2
AV
R R
egula
tion C
hangeover
from
AU
TO
-2 t
o
AU
TO
-1
Shut down : Unload GT, Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
Amal Power Station GAS TURBINE AND GAS TURBINE GENERATOR TRIP LOGIC DIAGRAM Page 01 of 04
CAUSE
60 · · · · · R5E 60
61 · · · · · L94FX4 61
62 · · · · · L94FX3 62
63 · · · · · L94FX2 63
64 · · · · · L94FX1 64
65 · · · · · L86TXT 65
66 · · · · · L86TFB 66
67 · · · · · L86FPG2LT Post-ignition P2 low trip 67
68 · · · · · L86FPG2HT Post-ignition P2 high trip 68
69 · · · · · L63QTX 69
70 · · · · · L63ETH 70
71 · · · · · L63CSHH 71
72 · · · · · L5E 72
73 · · · · · L4IGVT 73
74 · · · · · L4GFIVPT 74
75 · · · · · L4DLNT 75
76 · · · · · L4CT Common BOP IPS trip 76
77 · · · · · L12H 77
78 · · · · · L3SFLT Control system fault trip 78
79 · · · · · L39VT High vibration trip 79
80 · · · · · L30SPT 80
81 · · · · · L2SFT 81
82 · · · · · L28FDT Loss of flame trip 82
83 · · · · · L26QT 83
84 · · · · · L12H 84
EFFEC
T
A B C D
Gas
Tu
rbin
e t
rip
Gas
Tu
rbin
e S
hu
rdow
n w
ith
Un
load
Exci
tor
field
bre
ake
r tr
ipped
Rele
ase
of
CO
2 into
Genera
tor
Rele
ase
of
CO
2 into
Gt
Encl
osu
re
132kV
Bre
ake
r A
110/7
310 8
6H
tri
pped
132kV
Bre
ake
r A
110/A
710 8
6E t
ripped
132kV
Bre
ake
r A
120/A
720 8
6H
tri
pped
132kV
Bre
ake
r A
120/A
720 8
6E t
ripped
132kV
bus
zone t
rip
6.6
kV M
VU
AS-3
inco
mer
trip
ped
Blo
ck G
nera
tor
synch
Reduce
Exci
tati
on c
om
mand t
o A
VR
Pro
mt
opera
tor
for
load m
anagem
ent
Ala
rm/Inic
ati
on
Class of Shutdown MASTER TRIP RELAYS MAJOR EQUIPMENT TRIPS ALARM/CONTROL EFFECTS
LEGEND FOR Class of Shutdown
A Shut down : Trip GCB, Trip Excitation, GT Running C Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
B D Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down), Trip 132kV Circuit Breaker(s), Trip 6.6kV incomer
Emergency remote manual trip-MKVI panel
Failure to leave premix transfer-trip
Fail to reignite prim in sec-L.R.trip
Failure to reignite primary zone-trip
Failure to leave secondary XFER-trip
Exhaust over temperature trip
Exhaust thermocouples open trip
Turbine lube oil header press low trip
Exhaust duct pressure high trip
Inlet filter very high pressure drop -trip
Emergency manual trip-MKVI panel
Inlet guide vane control fault trip
P2 supply pressure too low trip
Dry low nox system trouble-trip
prot module speed sgnl loss (Decel Det)
High exhaust temperature spread trip
Start up fuel flow excessive trip
Lube oil header temperature high high trip
Electrical overspeed trip-HP
Mast
er
Tri
p r
ela
ys
86
U1
an
d 8
6U
2Tri
p G
CB
, E
xci
tati
on
, an
d G
as
Tu
rbin
eLo
cal R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G2
an
d 8
6G
3
Tri
p G
CB
an
d E
xci
tati
on
Loca
l R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G3
an
d 8
6G
4Tri
p G
CB
an
d E
xci
tati
on
Loca
l an
d R
om
te R
ese
t
Gen
era
tor
CB
D5
70
/D3
70
tri
pp
ed
( T
rip
coil-
1 o
pr.
)
Gen
era
tor
CB
D5
70
/D3
70
tri
pp
ed
( T
rip
coil-
2 o
pr.
)
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-1 t
o
AU
TO
-2
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-2 t
o
AU
TO
-1
Shut down : Unload GT, Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
Amal Power Station GAS TURBINE AND GAS TURBINE GENERATOR TRIP LOGIC DIAGRAM Page 01 of 04
CAUSE
85 · · · · · · L45HT1 85
86 · · · · · · L30LTA 86
87 · · · · · L12HF Control speed signal loss-HP 87
88 · · · · · LCPRERR 88
89 · · · · · L86GCVT G1 GCV not following ref.trip 89
90 · · · · · L86GCVST G2 GCV not following ref.trip 90
91 · · · · · L86GCV3T G3 GCV not following ref. trip 91
92 · · · · · L86CBT 92
93 · · · · · · L86BTX 93
94 · · · · · L60BOG 94
95 · · · · · · · L45FT1 Unit fire protection operated 95
96 · · · · · · · L45FPX Unit fire protection operated 96
97 · · · · · L3GRVT 97
98 · · · · · L3FTGLT 98
99 · · · · · · L39VSD High vibration shutdown 99
100 · · · · · L26QT2 100
101 · · · · · L12HFD Protective speed signal trouble 101
102 · · · · · · L12HFD Control speed signal trouble 102
102 · · · · · · · Software "Stop" Button 102
EFFEC
T
A B C D
Gas
Turb
ine t
rip
Gas
Turb
ine S
hurd
ow
n w
ith U
nlo
ad
Genera
tor
CB
D570/D
370 t
ripped (
Tri
p c
oil-
1 o
pr.
)
Genera
tor
CB
D570/D
370 t
ripped (
Tri
p c
oil-
2 o
pr.
)
Exci
tor
field
bre
ake
r tr
ipped
Rele
ase
of
CO
2 into
Genera
tor
Rele
ase
of
CO
2 into
Gt
Encl
osu
re
132kV
Bre
aker
A110/7
310 8
6H
tri
pped
132kV
Bre
aker
A110/A
710 8
6E t
ripped
132kV
Bre
aker
A120/A
720 8
6H
tri
pped
132kV
Bre
aker
A120/A
720 8
6E t
ripped
132kV
bus
zone t
rip
6.6
kV
MV
UA
S-3
inco
mer
trip
ped
Blo
ck G
nera
tor
synch
Reduce
Exci
tati
on c
om
mand t
o A
VR
Pro
mt
opera
tor
for
load m
anagem
ent
Ala
rm/Inic
ati
on
Class of Shutdown MASTER TRIP RELAYS MAJOR EQUIPMENT TRIPS ALARM/CONTROL EFFECTS
LEGEND FOR Class of Shutdown
A Shut down : Trip GCB, Trip Excitation, GT Running C Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)
B D Shut down : Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down), Trip 132kV Circuit Breaker(s), Trip 6.6kV incomer
Haz.Gas detected in turb.compartment
Load tunnel temp high-auto unloading
comp op limit protection max control error
Cool & seal air compt.bleed valve open pos trbl
Heat vent loss of turb.compt.vent - fast shut
down
Turbine startup bogged down-trip
Stop/speed ratio valve not tracking trip
Gas fuel temperature too low-trip
Lube oil header temperature high high-LTTH
Mast
er
Tri
p r
ela
ys
86
U1
an
d 8
6U
2Tri
p G
CB
, E
xci
tati
on
, an
d G
as
Tu
rbin
eLo
cal R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G2
an
d 8
6G
3
Tri
p G
CB
an
d E
xci
tati
on
Loca
l R
ese
t O
nly
Mast
er
Tri
p R
ela
ys
86
G3
an
d 8
6G
4Tri
p G
CB
an
d E
xci
tati
on
Loca
l an
d R
om
te R
ese
t
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-1 t
o A
UTO
-2
AV
R R
eg
ula
tion
Ch
an
geover
from
AU
TO
-2 t
o A
UTO
-1
Shut down : Unload GT, Trip GCB, Trip Excitation, Trip GT via MARK-VI ( GT Shuts down)