  • 1BIM Implementation

    Dr. Howard Jeffrey

    BIM Specialist

    Skanska

  • Confidential

    Skanska UK BIM Awareness

  • 3Objective of the Awareness Presentation

    To establish a Common Understandingof BIM throughout Skanska

    Show Skanska AB + UK BIM Approach

    Next Steps in learning more and applying on projects

  • 4Why Implement BIM?

    AB

    UKBU

    OUs / EFs

    PROJECTS

    Mandate

    Policy

    Strategy

    PlanDetailed plans for

    those elements of

    BIM to be adopted

    Individual strategies

    formed, respecting the

    different markets

    UKBU requires BIM on

    all appropriate projects

    going forward

    Strategic decision

    to adopt BIM

    across all BUsPresident & CEO

    UK President

    BIM Reps

    Project Directors

  • Confidential

    Skanska 12 Areas of BIM

    6) Quantity take-off5) Clash prevention 8) Procurement

    3) Simulation / Analysis

    7) Safety Planning

    9) Production Planning 11) Logistics

    4) Life Cycle Costing1) Visualisation

    12) Facilities Mgt.

    2) Design

    10) Supply Chain mgt.

  • 6Process Elements:

    Timing

    Discipline

    Standard Protocols

    Standard Forms

    Assessments

    UK BIM Strategy

    OU/EF Strategy

    Project strategy

    Workflow

    Focussed Interventions

    BIM Standards (Design)

    6) Quantity take-off5) Clash prevention 8) Procurement

    3) Simulation / Analysis

    7) Safety Planning

    9) Production Planning 11) Logistics

    4) Life Cycle Costing1) Sales

    12) Facilities Mgt.

    2) Design

    10) Supply Chain mgt.

    6) Quantity take-off5) Clash prevention 8) Procurement

    3) Simulation / Analysis

    7) Safety Planning

    9) Production Planning 11) Logistics

    4) Life Cycle Costing1) Sales

    12) Facilities Mgt.

    2) Design

    10) Supply Chain mgt.

  • 7Current 16 Areas of BIMIntelligent

    Modelling Design

    Safety PlanningFacilities Mgt.

    As Constructed

    Records

    Asset Register

    O&M Manuals

    Records

    Management

    Green BIM

    Quantity take-

    Off, cosing

    VisualizationsClash

    Detection 4D-SchedulingProduction

    BIM

    Procurement

    Supply Chain Management

    Simulations, energy,

    Fire etc. QualityCommercial

  • 8BIM Model

    Foundation: Created by the application of BIM standards, Design Agreement clauses,

    Project BIM Plan and BIM Guidance Notes

    Co-ordinated

    3D Model

    Architectural

    Structural

    MEP

    Word

    Documents

    2D

    Drawings

    Excel

    Spread

    Sheets

    Databases

    PDF

    Text

    Docs

    Skandocs

    BIM MODEL

    CAFMCAD

    Intelligent

    2D

  • 9Video M25

  • 10

    Starting BIM on a Project

    Starter pack of Documents

    Guidance notes

    BIM Route and Input Schedule

    Project BIM plan Template

    BIM requirements articulated

    Level of Detail matrix (LOD)

  • 11

    .

    BIM Route and Input Schedule 1

    Draft

    BIM Plan

    2

    BIM Plan

    Stage 1

    3

    Approve

    BIM Plan

    4

    Resource

    Plan

    5

    Technical

    Needs

    6

    Training

    Needs

    7

    BIM Plan

    Stage 2

    8

    Monitor

    Comply

    9

    Criticality

    Assess

    10

    Model

    Operating

    Optioneering

    Principals

    Engagement

    Inform of

    Standards &

    Templates

    Agree

    Extent of

    BIM

    Applications

    Identify

    Resources

    Required to

    Implement

    plan

    Identify

    Hardware

    Software

    requirements

    Identify

    Training

    needs

    BIM Design

    Assessment

    Design

    Agreements

    Links to

    Documents

    Finalise

    BIM

    Plan

    Structure

    Monitoring

    BIM Plan

    Status

    On Agendas

    Asset

    Criticality

    Assessment

    Alignment

    With Policy

    Documents

    Construction

    Operation

    And

    Maintenance

    Technical

    Co-ordination

    Concept

    DesignDesign

    DevelopmentDetailed

    design

    Level of Detail LOD

    Click to link

    ID PROJECT SPECIFIC BIM PLAN DOCUMENT 1 OF 3

    Optioneering Optioneering

    Strategic

    Process

    Monitoring

    Detailed

    Process

    Monitoring

    Coordination of BIM Delivery

    Life Cycle Optioneering

    Click to link Skanska ID Detailed BIM Route Map

  • 12

    Document Links

    .BIM Route Map BIM Input Schedule

    Project BIM Plan Template

    LOD Matrix

    BIM

    Assessments.

    Design

    Agreements.

    Articulations.

    Optioneering

    BIM Standards

    & Protocols:

    Eg. room

    Numbering.

    Asset Coding.

    Skanska

    Standards

    Eg. drawing

    Numbering.

    Clash

    prevention

    Construction

    Standards

    Eg. Change

    Control

    Handover

    Model/Server

    To FM

    Timeline

    Status

    Benefits

    Matrix

    WIP

  • 13

    Project BIM Plan Example

    Required by Lead Application Benefits Expected

    Client ID CJV FM CJV FM

    Comments/requirements

    Accurate and visual

    design, no shortcuts (completed design in all

    details)

    Standardized components

    in use, libraries and catalogs

    Information on materials and components available

    from model to meet O&M/FM & Investors needs

    Required under Skanska

    Group BIM Strategy

    Must support requirements of

    the BIM applications detailed

    below

    CJV to determine optimum

    technical solutions

    Must agree and adopt an

    object/asset coding system

    at the commencement of

    design to be used throughout

    the life of the project

    Analyze alternative

    design/construction/mainten

    ance options

    Select options on basis of

    optimized capital and ownership costs

    Ensures most attractive /

    affordable whole life cost

    solution

    Accurate life cycle cost

    estimation

    Reduced risk in life cycle

    fund management

    Required under ID BIM

    Strategy

    BIM to facilitate rapid re-

    assessment of implications

    and quantities of design

    options

    Suggested that a member of

    the BIM team should attend

    all optioneering workshops in

    order to facilitate BIM

    support

    Intelligent

    3D-Modelling

  • 14

    Articulation of BIM

    Skanska Infrastructure requirements

    Skanska Facilities Services requirements

    Skanska Construction requirements

  • 15

    Level of Detail Matrix

    LEVELS OF DETAIL RELATING TO THE PROJECT SPECIFIC BIM STRATEGY AND PLAN

    Tender process Finalise Bid Final Construction Construction Operation & Maintenance

    Project Specific BIM 1 2 3 4 5 6 7 8 Price 9 9 10

    Plan stages DRAFT DEVELOP STAGE 1 Approve Resource Technical Training DEVELOP STAGE 2 Comply INPUT INPUT MODEL

    Levels of Detail

    (Development) LOD

    LOD LOD 100 LOD 200 LOD 300 LOD 400 LOD 500

    Architectural BIM: 100 - Concept planning 200 - Schematic 300 - Design development 400 - Construction ready 500 - Virtual prototype

    Assessment 150 - Space planning 350 - Fully coordinated design documentation 600 - As built

    Into Design 700 - Operations documentation

    RIBA Stage Plan Agreement A, B, C D,E,F,G,H J K L

    Services BIM: Specifications Plantrooms, risers, distribution Spatial Co-ordination Co-ordinated details As Installed

    Assessment Schematics Builders w ork Manufacturers details

    Into Design Utilities

    Agreement

    Structural BIM: Foundations/frame Outline Design Detail Design As Constructed

    Assessment Checking subcontract design

    Into Design Co-ordinated details

    Agreement

    Sub-contractor Component spacial dimensions BIM into design agreement Create links to models/databases

    Including future access space Detail Design Detail Design As Constructed

    Note: Create Component attributes/spacial Component attributes As Installed

    Links to dims inc access space dims inc access space

    Documents

    Standards Room Numbering Drawing numbering' Change Control

    Articulating Asset Coding (empty Clash Prevention Retrievable Legible

    BIM: SFS fields if necessary) Useful Data to be available

    Asset Register

    O&M template Handover 'Timelined' versions

    Articulating of models and databases for

    Optioneering BIM: ID Concept Options Design Options Detail Options FM usage

  • 16

    Capturing Lessons Learned and Feedback into Projects

    Legacy

    Hospitals

    Walsall Hospital

    Barts & The Royal

    London Hospital

    Case Study

    Lessons

    Learned

    Case Study

    Lessons

    Learned

    Case Studies

    capture ongoing

    Implementation

    Benefits

    Challenges/Lessons

    Quantifiable

    EvidenceOther legacy

    projects

    Implementation

    Onto Legacy

    Hospitals

    Derby

    Walsgrave

    Mansfield

    (QEH)

    Lessons

    Learned

    OTHER NEW

    PROJECTS

    PAPWORTH

    HOSPITALPost Occupancy Evaluation

    (POE) of the design

    Review Initiatives/Protocols

    Processes/Existing practices

    Interrogate

    Rationalise

    and Implement

    Outcomes

    BIM

    (Building Information

    Modelling) provides a

    vehicle to helpArticulate and transfer

    The Benefits for:

    Clients

    User groups

    Estates Management

    Supply Chain

    Designers

    Skanska

    Academic/University engagement

    For Research and Innovation

    Lessons

    Learned

  • Confidential

    Building Information Modelling (BIM) Implementation at Papworth

    Papworth

    Project

    BIM

    Plan

    Agreement of Papworth

    Project BIM Plan

    Incorporates the agreed

    requirements of stakeholders

    For the Design, Construction,

    Operational and Maintenance

    Periods of the project

    Deliberation and articulation

    Of BIM requirements for

    Designers

    Deliberation and articulation

    Of BIM requirements for

    Facilities Services Hard and Soft

    Deliberation and articulation

    Of BIM requirements for

    Contractor

    Deliberation and articulation

    Of BIM requirements for

    Skanska ID/SPV/Client

    Dialogue and

    Interactive

    Engagement of

    Participants to

    Understand and

    Accommodate

    Each othersPractical and

    Also BIM

    Requirements

    Deliberation and articulation

    Of BIM requirements for

    Other stakeholders

    BIM Plan Route Plan

    To manage Implementation,

    Compliance Auditing,

    Development

    And Updating

    Inputs to the BIM

    Plan as project

    Progresses eg.

    Subcontractors

    Suppliers

    Commissioners

  • 18

    BIM Implementation

    Thank you