skanska nks - bluebeam irc 2013
DESCRIPTION
Learn more - www.bluebeam.comTRANSCRIPT
Taking Projects Digital: Experiences at the New Karolinska Solna Project with Revu.
Swaroop Kadur
Presenter:
Overview of New Karolinska Solna (NKS)Area: 320 000 square meters gross total area
No. of rooms: total approx. 8 000
Single rooms for all in-patients
800 beds:
600 in-patient beds
100 day-care beds
100 rooms at adjacent patient-hotel
35 operating theatres
8 radiation bunkers
Clinical research laboratories
Teaching facilities
Availability of Drawings for New Karolinska Solna (NKS) team Members Challenge
Digitally manage drawings and documents and enable team members to quickly find up-to-date information.
Easily bring documentation into the field, without needing to print.
Information
Typical Architectural Drawing set for one phase of the project consist of 600 sheets (the project has 7 phases) .
Drawings are updated on average on a weekly basis.
Some of the Drawings Needed to find the relevant information for One Room
Floor Plan Scale 1:500
Floor Plan Scale 1:200
Setting out planScale 1:100
Ceiling Plan
FFE Plan
Floor Finishes
Ceiling Detail
Room Detail Sink Detail
Traditional Process for drawings Drawings are available for 2 users at a time.
Drawings are at the office so users have to come back to Office if they have not taken everything when they leave
A challenge maintaining them for job and ensuring that they are up to date.
Users have to remember all the relationships between the drawings
Workflow for Revu and SharePoint
Publication
Publication
Distribution/Field Production (Revu ipad)Production (Revu Desktop)
Using Revu and SharePoint for accessing the drawings
Using Revu for ipad for accessing the drawings
Using Revu for ipad for accessing the drawings
Using Revu for ipad for accessing the drawings
Using Revu for ipad for accessing the drawings
Room Sign offs in Real time
Challenge
Conduct Room sign offs in real time with the relevant subcontractors.
Keep track of sign offs by each contractor.
Get overall status of each floor during the sign-off process.
Floor Status
Close up of Floor status
Progression of Room Sign off
Floor status
Close up of Floor Status
Room Status Tracking
Questions