SIXTH SEMESTER B.TECH. (ENGINEERING) DEGREE EXAMINATION JUNE 2009 CE 04 60B-HYDROLOGY AND IRRIGATION ENGINEERING (2004 Admissions) Part A I 1) Distinguish between DAD curves and IDF curves. 2) Write a note on water shed. 3) What is meant by design flood? Is this 63Dleas Maximum Probable F~ood?Why? 4) What is meant by reservoir sedimentation? What are the different methods ofcontrolling reservoir sedimentation? 5) Define Irrigation. How do you classify Irrigation? What are the advantages andill effects of Irrigation? 6) Write a note on Marginal bunds and guide banks. 7) List tI-.evariOus causes of waterlogging and write a note on methods of prevention of water logging. .. . 8) Write a detailed note on Canal Classification. (8 x 5 = 40 marks) II a) i) Explain the procedure for checking a rainfall data for consistency. (8) ii) A catclunent has seven rain gauge stations. In a yearthe annualrainf8Irecorded by the (7) gauges are as follows: P R S 130.0 142.1 118.2 108.5 T 165.2 u V 1021 , !46.9 T 55 61 91 98 115 138 Dildaarge 1420 1190 650 520 290 0 (.'/s) www.edutalks.org

Upload: doankhanh

Post on 29-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SIXTH SEMESTER B.TECH. (ENGINEERING) … SEMESTER B.TECH. (ENGINEERING) DEGREE EXAMINATION JUNE ... and Lacey's Silt theory. 00) Design an irrigation channel seoti Iifor discharge

SIXTH SEMESTER B.TECH. (ENGINEERING) DEGREE EXAMINATIONJUNE 2009

CE 04 60B-HYDROLOGY AND IRRIGATION ENGINEERING

(2004 Admissions)

Part AI 1) Distinguish between DAD curves and IDF curves.

2) Write a note on water shed.3) What is meant by design flood? Is this 63Dleas Maximum Probable F~ood?Why?4) What is meant by reservoir sedimentation? What are the different methods of controlling

reservoir sedimentation?5) Define Irrigation. How do you classify Irrigation? What are the advantages and ill effects

of Irrigation?6) Write a note on Marginal bunds and guide banks.7) List tI-.evariOus causes of waterlogging and write a note on methods of prevention of

water logging. .. .8) Write a detailed note on Canal Classification. (8 x 5 = 40 marks)

II a) i) Explain the procedure for checking a rainfall data for consistency. (8)ii) A catclunent has seven rain gauge stations. In a year the annual rainf8I recorded by the (7)

gauges are as follows:

P R S130.0 142.1 118.2 108.5

T165.2

u V1021 , !46.9

T 55 61 91 98 115 138Dildaarge 1420 1190 650 520 290 0(.'/s)

www.edutalks.org

Page 2: SIXTH SEMESTER B.TECH. (ENGINEERING) … SEMESTER B.TECH. (ENGINEERING) DEGREE EXAMINATION JUNE ... and Lacey's Silt theory. 00) Design an irrigation channel seoti Iifor discharge

III a) (i) Define mass inflow curve and demand curve. Explain the procedure for finding storage (8)capacity of a reservoir in order to meet a particular rate of demand.List the various formulae to obtain the flood peak discharge and discuss their limitations. (7)

(or)b)(ii) What is the necessity of river training works? Describe ip brief the different types of (15)

river training works .

IV a) A weir with a vertical drop has the foJlowing particulars :

Bligh's co efficient : 9

Flood discharge = 350 cumecs

Length of weir = 50m

Height of weir above low wate~ = 2.5m

Height ot falling shutter = 0.6m

Top width of weir = 2.0m

Bottom width of weir = 3.5m

Design the length and thickness of aprons and draw the cross section of the weir ..

(or)b) (i) What is meant by surface and subsurface irrigation? What are their types? Discuss briefly (10)

the various techniques used for distributing water in the farms .(ii) Distinguish between weir and barrage. Explain in detail the various types of weirs. (5)

Va) i) Compare and contrast the various aspects of Kennedy's theory and Lacey's Silt theory. 00)Design an irrigation channel seoti Ii for discharge = 40 cumecs., and silt factor = 1.0 witha side slope of I: I.

ii) Enumerate the various considerations which govern the selection of the optimum (5) '.'alignment of a ca..'1al.

(or)b) i) Why is a proper drainage of irrigated land necessary? If an area of irrigated land is (7)

already waterlvgged. what remedies would you suggest for reclaiming the land? Brieflydiscuss the method of subsurface drainage of irrigated land.

ii) Write ~rt notes ~ : (8)Spoil banks,Burrow pits,Back benn andOff take alignment.