Page 1: Six Sigma Yellow Belt Presentation

Topping’s Six SigmaYellow-Belt

Distractions Decreasing ISRs Productivity

Page 2: Six Sigma Yellow Belt Presentation

Emails People Visiting Conference Calls

Step 1 Define-Distractions in the workplace

Page 3: Six Sigma Yellow Belt Presentation

Emails=ISR related, Non ISR related, Misc. People Visiting=ISR related or Non ISR

related Conference Calls=ISR related or Non ISR

related

Step 2 Measure

Page 4: Six Sigma Yellow Belt Presentation

0

5

10

15

20

25

30 Email Control

Average Misc Emails

Average NOT ISR RelatedEmails

Average ISR RelatedEmails

Page 5: Six Sigma Yellow Belt Presentation

2/18/2015 2/20/2015 2/22/2015 2/24/2015 2/26/2015 2/28/2015 3/2/2015 3/4/20150

0.5

1

1.5

2

2.5

3

3.5

4

People Visit -Control

Visit NOT Related Visit ISR Related

Page 6: Six Sigma Yellow Belt Presentation

2/18/2

015

2/19/2

015

2/20/2

015

2/21/2

015

2/22/2

015

2/23/2

015

2/24/2

015

2/25/2

015

2/26/2

015

2/27/2

015

2/28/2

015

3/1/2

015

3/2/2

015

3/3/2

015

3/4/2

0150

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

Conference Calls -Control

Conference Calls NOT RelatedConference Calls Related

Page 7: Six Sigma Yellow Belt Presentation

Step 3 Analyze• 23.14% of Conference Calls were NOT ISR

Related; not a major distraction • 71.45% of people visiting were NOT ISR related;

major distraction• 57.21% of emails were NOT related to ISR or

Misc; major distraction

Page 8: Six Sigma Yellow Belt Presentation

2/18/2015 2/20/2015 2/22/2015 2/24/2015 2/26/2015 2/28/2015 3/2/2015 3/4/2015-1

1

3

5

7

9

11

13

15

Misc. Email Analysis

WeatherHP PPS Extracuricular Activities/ClubsHP YENHP Plano GymHP News

Page 9: Six Sigma Yellow Belt Presentation

Email Filters On Call/Busy vs. Free Sign at ISR Desks

Step 4 Improve

Busy Free

 

Page 10: Six Sigma Yellow Belt Presentation

2/18/2

015

2/20/2

015

2/22/2

015

2/24/2

015

2/26/2

015

2/28/2

015

3/2/2

015

3/4/2

0150

0.5

1

1.5

2

2.5

3

3.5

People Visit -Control

Visit NOT Related Visit ISR Related

Before Solution NON-ISR People visit represented 71.43% of all visits. After solution the % decreased to 35.31%

Page 11: Six Sigma Yellow Belt Presentation

4/29/2

015

5/1/2

015

5/3/2

015

5/5/2

015

5/7/2

015

5/9/2

015

5/11/2

015

5/13/2

0150

5

10

15

20

25

30

Email -After Solution

Average Misc EmailsAverage NOT ISR Related EmailsAverage ISR Related Emails

Before Solution NON-ISR & Misc. emails represented 57.21%. After solution that % decreased to 27.45%

Page 12: Six Sigma Yellow Belt Presentation

Analysis of Solutions• The busy sign had a clear impact as the amount of

NOT ISR Related visits decreased dramatically• The email filters were equally effective as they

decreased the amount of Misc. emails.

Page 13: Six Sigma Yellow Belt Presentation

Step 5 Control

• The cardstock signs cost approx. $0.05 and would cost around $3 to implement in the Plano office

• The email filters would take approx. 10 minutes for the reps to set up.

• Continuation would depend upon managers to guide and implement