six sigma – basic overview
DESCRIPTION
Six Sigma – Basic overview. WHAT IS THIS SIX SIGMA ?. A Philosophy A Statistical Measurement A Metric A Business Strategy. make fewer mistakes in all that we do. helps gage adequacy of product, process and services A measuring system good quality reduces cost. - PowerPoint PPT PresentationTRANSCRIPT
116
Six Sigma – Basic overview
226
WHAT IS THIS SIX SIGMA ?WHAT IS THIS SIX SIGMA ?
• A Philosophy
• A Statistical Measurement
• A Metric
• A Business Strategy
• make fewer mistakes in all that we do.
• helps gage adequacy of product, process and services
• A measuring system
• good quality reduces cost
Sigma is a Greek word which denotes Standard deviation
336
SIGMA RATING AND PPM ARE CORRELATEDSIGMA RATING AND PPM ARE CORRELATED
SIGMA RATING A PERFORMANCE MEASURE
Sigma Rating PPM 1 691,462
2 308,5373 66,8074 6,2105 2336 3.4
Process Defects per Capability Million Opportunities
6 SIGMA MEANS 3.4 DEFTS IN PER MILLION OPPORTUNITIES
446
Six sigma is when the inherent variability of the process is half that of the requirements
LSL USL6
33
6
A WORD OF CAUTION:
It is possible to achieve six sigma by widening specifications but the issue is that would the customer accept it.
WHAT IS SIX SIGMAWHAT IS SIX SIGMA
556
Logic and intuitionQuick hits-Kaizen
Low hanging fruitsSimple QC tools
Bulk of fruitsProcess characterizationand optimization
Process limitations
Sweet fruits DFSS
Increase of sigma rating requires an exponential decrease in defect reduction
666
• TO REDUCE VARIATION
• TO REDUCE DEFECTS
• TO IMPROVE YIELD
• TO ENHANCE CUSTOMER SATISFACTION
• TO IMPROVE THE BOTTOMLINE
THE GOALS OF SIX SIGMATHE GOALS OF SIX SIGMA 6 Sigma is a customer driven process improvement system that:
–puts our Customers (BOTH INTERNAL & EXTERNAL) and their requirements first
6 Sigma is THE change programme :
776
HOW THIS WORK GETS DONEHOW THIS WORK GETS DONE
Leadership TeamMaster
Black Belt Team Leader Team Members
Draft charter
Discuss/revise charter
Review &approve charter
Select project
886
IDENTIFYING THE KEY PLAYERSIDENTIFYING THE KEY PLAYERS
• There are four major roles that need to be filled for a successful project.– Black Belt/Green Belts– Team Members– Master Black Belt– Champion
996
BeforeProject
DuringProject
AfterProject
Black Belt/
Green Belt
(Project Leader)
• Review purpose projectstatement withsponsor/ champion
• Draft rest of charter
• Finalize team members
• Manage schedules
• Lead meetings
• CoordinateCommunication
• Serve as liaison withMBB, champion(s), andstakeholders
• Keep records
• Lead team’s work
•See that documentationis completed andlessons captured
•Update dashboard
•Monitor implementation
•Monitor results
•Use improved methods
Team Members
• Participate in meetings
• Carry out assignments
• Help in data collection
• Assist in piloting
• Contribute knowledgeand expertise
• Learn necessary skillsand methods
•Use improved methods
PROJECT ROLES & PROJECT ROLES & RESPONSIBILITIESRESPONSIBILITIES
10106
To get results should we focus on Y or X?
• Y
• Dependent variable
• Output of the process
• Effect
• Symptom
• It is monitored
• X1, X2, …….., Xn
• Independent variable
• Input to the process
• Cause
• Problem
• It is controlled
Y = f(X)
THE FOCUS OF SIX SIGMATHE FOCUS OF SIX SIGMA
11116
• IMPACT ON COST OF QUALITY
20
15
10
5
233 6210 66807 308537 50000005 4 3 2 1
36
DPMOSIGMA
Percent of Sales
WHY 6 SIGMA FOR YOUR COMPANYWHY 6 SIGMA FOR YOUR COMPANY
DMAIC approach : 5 steps to solve the problems
13136
ROAD MAP Define Phase
• Why this Project ? – Business Case • Project Charter • SIPOC – to find process scope and inputs• CTQ identification – to come down from Macro to
micro objectives – CTQs have to be specific and measurable.
• Create CTQ specification table – Operational definition of measure – Specifications / defect definition – Kano status
• Review and Finalize Your Project Charter
14146
Importance of Project Selection
The process and the method we use to select Projects are critical success factors in the achievement of business results through 6 Sigma
A good Project selection activity not only guarantees the successful completion of the Project itself, but improves resource productivity and maximizes the total impact for the business
15156
Fundamentals of 6 Sigma Project Selection
• Must be driven by leadership
• Must be focused on opportunities that are real and important to the business
• Usually based on either business financial or customer performance
• Approach may be quantitative and scientific - is always logical
• Involves people who are familiar with and accountable for process performance
• Moves from broad and high-level to precise, narrow and specific
• Ends with a Project charter
16166
Improvement ideas may come from a variety of sources
customer complaint /feedback
systems
key competitive strategies
business improvement
initiatives
suggestion boxes
histories and observations
Voice of the Customer systems
periodic process evaluations
existing Project pipelines or
backlogs
COPQ evaluations
process “escapes”
risk assessment
Candidate improvementopportunities
17176
Key considerations in selecting Projects
• What are the improvement objectives for our business?• What sources of improvement ideas are available?
What additional considerations need to be made?• Which approaches to Project selection are best for us?
How may this change over time?• What processes do we focus on? Why?• What criteria do we use to prioritize opportunities?• To what extent do we rely on data to drive Project
selection?• Who should be involved in Project selection? How?• How do we translate improvement ideas into defined,
specific and chartered Projects for Belts?
18186
CHARTER
Charter Consist • Problem statement
• Goal of project ( from to in which time span)
• Scope of project
• Measurable ( CTQs)
• Team and stakeholders ( BB/GBs/MBB/Effected parties)
• Benefit from the project
• Support required
• Schedule for project ( Milestones)
19196
Problem Statement• Criteria for a good problem statement
– It must…• be specific• be quantifiable (measurable)• state the effect/pain
• It should not…• imply a cause• imply a solution
20206
Problem Statement Criteria
• Should not imply a cause — Avoid expressions such as “because of,” “due to,” etc.
• Should not imply a solution — Avoid expressions such as “a lack of,” “need to,” etc.
21216
Problem Statement Criteria• Be specific — Avoid terms which lend themselves to
ambiguity, such as “quality,” “responsiveness,” “productivity,” etc.
• Quantify the problem — State explicitly when, how much, how long, how often, and what direction (magnitude/trend).
• State the effect/pain — states explicitly the effect the problem is having on the customer (how customers are affected or impacted).
22226