Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act. We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.TRANSCRIPT
![Page 1: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/1.jpg)
Reconfiguration of The Six Points Reconfiguration of The Six Points InterchangeInterchange
Community Update #2June 18, 2014
![Page 2: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/2.jpg)
OutlineOutline
1. Project overview2. How did we get here?3. Etobicoke Centre4. Existing and future road network5. Design Update6. Design and Construction Schedule7. Next Steps
![Page 3: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/3.jpg)
Existing Study AreaExisting Study Area
![Page 4: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/4.jpg)
Existing Study AreaExisting Study Area
A. Kipling Looking North C. Bloor At Kipling Looking East D. Dundas At Beamish Looking North
E. Dundas At Kipling Looking West
F. Dundas Looking East G. Kipling Looking South H. Kipling Subway Station
I. Dundas At Poplar Ave
B. Bloor at Islington Ave
![Page 5: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/5.jpg)
Etobicoke Centre Secondary PlanEtobicoke Centre Secondary Plan
As one of four Centres identified by the Official Plan City-wide, Etobicoke Centre anticipates mixed use growth and economic activity centred around accessible higher order transit facilities.
The reconfiguration of Six Points has been provided for in various planning documents since 1987, most recently in the Etobicoke Centre Secondary Plan (2002).
![Page 6: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/6.jpg)
Etobicoke Centre Secondary Plan Etobicoke Centre Secondary Plan (cont’d)(cont’d)
Reconfiguration of Six Points creates more urban intersections appropriate for a growth centre and complete streets for all modes of transportation.
A high quality public realm, including public open spaces and pedestrian environment will allow for existing and future uses to thrive and create a place for people to live, work and play.
![Page 7: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/7.jpg)
Etobicoke Centre Secondary Plan Etobicoke Centre Secondary Plan (cont’d)(cont’d)
![Page 8: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/8.jpg)
How Did We Get Here?How Did We Get Here?
![Page 9: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/9.jpg)
How Did We Get Here?How Did We Get Here?
![Page 10: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/10.jpg)
Etobicoke Centre Public Space and Etobicoke Centre Public Space and Streetscape PlanStreetscape Plan
Adopted by City Council in 2011 to unify Centre’s unique character areas and create complete streets to accommodate all modes of transportation.
![Page 11: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/11.jpg)
Reconfiguration presents opportunity for real development parcels.
New opportunities for new civic and institutional buildings (YMCA), great open spaces, active retail uses fronting comfortable, pedestrian oriented streets.
Network of parks and open spaces
Westwood Precinct Urban Design Westwood Precinct Urban Design GuidelinesGuidelines
![Page 12: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/12.jpg)
Vision
• Mixed-use, pedestrian-friendly street network that supports all modes of travel, reduces storm-water issues, improves utilities
• Active uses at grade to enliven the public realm and make it a place to come to rather than pass through
Dundas Street West Bloor Street West Kipling Avenue
![Page 13: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/13.jpg)
VisionVision
![Page 14: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/14.jpg)
Future Street NetworkFuture Street Network
DUNDAS ST
KIP
LIN
G A
VE
BLOOR ST
DU
NB
LOO
R R
D
BE
AM
ISH
DR
BLOOR ST
DUNDAS ST
![Page 15: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/15.jpg)
Existing Traffic FlowExisting Traffic Flow
![Page 16: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/16.jpg)
Future Traffic FlowFuture Traffic Flow
![Page 17: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/17.jpg)
Recent ProgressRecent Progress
Met with:
StakeholdersUtility CompaniesTTCLandownersDesign Review Panel
Developed Designs for:
Dunbloor AlignmentRoad “B” AlignmentIntersection GeometryTypical Cross SectionBike Lane Details
![Page 18: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/18.jpg)
Dundas Street Perspective ViewDundas Street Perspective View
![Page 19: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/19.jpg)
Typical Cross Section-Dundas Typical Cross Section-Dundas StreetStreet
Westbound
Eastbound
![Page 20: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/20.jpg)
Typical Cross Section-Bloor Street Typical Cross Section-Bloor Street WestWest
Westbound
Eastbound
![Page 21: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/21.jpg)
Typical Cross Section-Kipling Typical Cross Section-Kipling AvenueAvenue
Southbound
Northbound
![Page 22: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/22.jpg)
Typical Cross Section-Dunbloor Typical Cross Section-Dunbloor RoadRoad
Southbound
Northbound
![Page 23: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/23.jpg)
Typical Cross Section-Beamish Typical Cross Section-Beamish DriveDrive
Southbound
Northbound
![Page 24: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/24.jpg)
Completed Street – perspective Completed Street – perspective viewview
![Page 25: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/25.jpg)
Boulevard - Underground DetailsBoulevard - Underground Details
![Page 26: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/26.jpg)
1. Engineered Fill
UndergroundUnderground AssembliesAssemblies
![Page 27: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/27.jpg)
2. Continuous Trench
Underground AssembliesUnderground Assemblies
![Page 28: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/28.jpg)
3.Sub Drain
Underground AssembliesUnderground Assemblies
![Page 29: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/29.jpg)
4.Utilities - Telecom
Underground AssembliesUnderground Assemblies
![Page 30: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/30.jpg)
5. Utilities - Hydro
Underground AssembliesUnderground Assemblies
![Page 31: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/31.jpg)
6.Sub Drain
Underground AssembliesUnderground Assemblies
![Page 32: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/32.jpg)
7.Granular Fill
Underground AssembliesUnderground Assemblies
![Page 33: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/33.jpg)
8.Soil Cells
Underground AssembliesUnderground Assemblies
![Page 34: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/34.jpg)
9. Rain Water Pipes
Underground AssembliesUnderground Assemblies
![Page 35: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/35.jpg)
10. Growing Medium
Underground AssembliesUnderground Assemblies
![Page 36: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/36.jpg)
11. Completed Soil Trench
Underground AssembliesUnderground Assemblies
![Page 37: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/37.jpg)
12.Granular Fill
Underground AssembliesUnderground Assemblies
![Page 38: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/38.jpg)
13. Concrete
Underground AssembliesUnderground Assemblies
![Page 39: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/39.jpg)
14.Pavers
Underground AssembliesUnderground Assemblies
![Page 40: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/40.jpg)
15. Bike Lane
Underground AssembliesUnderground Assemblies
![Page 41: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/41.jpg)
16.Planters
Underground AssembliesUnderground Assemblies
![Page 42: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/42.jpg)
17.Trees
Underground AssembliesUnderground Assemblies
![Page 43: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/43.jpg)
18. Street Furniture
Underground AssembliesUnderground Assemblies
![Page 44: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/44.jpg)
ScheduleSchedule
![Page 45: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/45.jpg)
Advanced grading
and the installation
of sanitary sewer
along the Dundas
Street Realignment
Closure and
removal of existing
Kipling NB to Bloor
EB Ramp and NB
Bus Loop to Kipling
NB and Bloor EB
Ramps
Initial Works – Fall 2014Initial Works – Fall 2014
![Page 46: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/46.jpg)
Initial Works – Traffic / Transit Initial Works – Traffic / Transit ImpactsImpacts
![Page 47: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/47.jpg)
Stage 1
Build:
Dundas Street
(East of Kipling)
Road A
Road B
Reconstruct:
Bus Loop Ramp
Bloor Street
(East of Dunbloor)
Future Construction StagesFuture Construction Stages
![Page 48: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/48.jpg)
Future Construction StagesFuture Construction Stages
Stage 2
Build:
Dundas Street
(West of Kipling)
Reconstruct :
Viking Lane
Beamish Road
Bloor Street
(Dunbloor to Kilping)
Dundas Street
(East of Dunbloor)
Dundas to Kipling
Ramp
![Page 49: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/49.jpg)
Stage 3
Reconstruct:
Kipling Avenue
Future Construction StagesFuture Construction Stages
![Page 50: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/50.jpg)
Start Initial Construction Works – Fall 2014
Finalize Detail Design for Future Construction – Fall 2014
Initiate Utility Relocations – Winter 2014/Spring 2015
Start Next Phase of Construction – Summer 2015
Projected Construction Duration 3 – 4 Years
Next StepsNext Steps
![Page 51: Six Points Reconfiguration - Community Update June, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062418/555d8645d8b42a6c3d8b4edf/html5/thumbnails/51.jpg)
Project Website:
toronto.ca/sixpoints
For further information and to provide comments, please contact:
Mike Logan
Public Consultation Unit
City of Toronto
416-392-4360
Next StepsNext Steps