Sitka Airport IC ProjectLessons-Learn
ByAmanda GillilandKnik Construction
Presented ByDr. George ChangTranstec Group
![Page 2: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/2.jpg)
Sitka-Rocky Gutierrez Airport Runway Overlay
Alaska, May 2013
![Page 3: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/3.jpg)
IC Specification• Provide one IC roller per paver • Provide on-site training for contractor and agency • Provide manufacturer representative for IC support• IC test section• Provide Veda files to agency • Operations Criteria – 95% meet optimum passes– 70% meet target ICMV values (HMV)
• 10% deduction from item 401 when IC is not functioning properly
![Page 4: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/4.jpg)
Night Paving
![Page 5: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/5.jpg)
Hamm HCQ System
Accelerometer
GPS Receiver
HCQ GPS Navigator
Temperature Sensors Control Panel
![Page 6: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/6.jpg)
Hamm IC Roller Operation
• Front drum vibratory
• Rear drum oscillatory
• Two amplitude settings
• Two frequency settings
![Page 7: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/7.jpg)
IC Training
• QC Manager– Setup, software/
analysis (data management), trouble shooting
• Roller Operator– Use on-board display,
setup • Owner Representatives– Basic training
40
10
4Hours of Training
QC ManagerOperatorOwner
![Page 8: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/8.jpg)
Hamm HCQ Software
![Page 9: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/9.jpg)
On HAMM HCQ Software
• Limitations– Passes are not
viewed individually– Limited analysis– Base maps are time
consuming to import
![Page 10: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/10.jpg)
Veda Software
![Page 11: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/11.jpg)
Veda Temperature Map
![Page 12: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/12.jpg)
Veda Analysis
![Page 13: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/13.jpg)
Veda Point Tests
![Page 14: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/14.jpg)
Veda HMV Map
![Page 15: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/15.jpg)
Veda Software HMV Comparison
Property “End” “Middle”
Frequency - vpm 3000 2400, 3000
Amplitude - in 0.034 0.019
Speed - mph 2.8-3.8 2.2-3.6
Temperature – degrees F
190-230 190-230
HMV 60-80 60-115
Average Mat Density - %
96 96
![Page 16: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/16.jpg)
Veda Software vs. Thermal Camera
![Page 17: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/17.jpg)
Veda Recap
• Base maps• View individual
passes• View roller
settings• Extensive analysis
![Page 18: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/18.jpg)
Strengths and Limitations
• Strength– Real time data useful
– particularly for night paving
– Records everything for troubleshooting (if required)
– Helps with density consistency
– Verifies 100% coverage
• Limitation– Does not predict
density – ICMV and density do not correlate at this project
– Room for error in data analysis
![Page 19: Sitka Airport IC Project Lessons-Learn By Amanda Gilliland Knik Construction Presented By Dr. George Chang Transtec Group](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551c2b44550346b24f8b60e4/html5/thumbnails/19.jpg)
Thank You !